Center Street & 2080 East

swedishstreakMécanique

22 févr. 2014 (il y a 3 années et 7 mois)

73 vue(s)

Center Street & 2080 East

Roadway Connection

Springville City

John
Cazier
, Derrick Turner, Justin Brewer, Taylor
Nordquist

Center Street & 2080 East

Roadway Connection

Springville City

John
Cazier
, Derrick Turner, Justin Brewer, Taylor
Nordquist

Center Street & 2080 East

Roadway Connection

Springville City

John
Cazier
, Derrick Turner, Justin Brewer, Taylor
Nordquist

Center Street & 2080 East

Roadway Connection

Springville City

John
Cazier
, Derrick Turner, Justin Brewer, Taylor
Nordquist

Roadway Alignment


Minimizes property acquisition


Incorporates a T
-
intersection where Spring Oaks
Drive meets Center Street


Meets Springville City specifications for road width


Horizontal curves designed for 35 mph speeds and
minimize size of required retaining wall size


Horizontal Alignment

Center Street & 2080 East

Roadway Connection

Springville City

John
Cazier
, Derrick Turner, Justin Brewer, Taylor
Nordquist

4810
4820
4830
4840
4850
4860
4870
4880
4890
4900
4910
4920
0
200
400
600
800
1000
1200
1400
Elevation

Station [ft] (north to south)

Existing Elevation
Proposed Curve
Elevation
Roadway Alignment


Minimizes property acquisition


Incorporates a T
-
intersection where Spring Oaks
Drive meets Center Street


Meets Springville City specifications for road width


Horizontal curves designed for 35 mph speeds and
minimize size of required retaining wall size


Vertical Alignment

Center Street & 2080 East

Roadway Connection

Springville City

John
Cazier
, Derrick Turner, Justin Brewer, Taylor
Nordquist

Roadway Alignment


Minimizes property acquisition


Incorporates a T
-
intersection where Spring Oaks
Drive meets Center Street


Meets Springville City specifications for road width


Horizontal curves designed for 35 mph speeds and
minimize size of required retaining wall size


Center Street & 2080 East

Roadway Connection

Springville City

John
Cazier
, Derrick Turner, Justin Brewer, Taylor
Nordquist


Cheaper than traditional concrete wall


MSE wall: $25
-
$35 / ft²


concrete wall: $60
-
$100 / ft²


Polyethylene
geogrids

placed within soil provide
strength


Precast concrete facing units provide aesthetics


Designed using FHWA
Publication No.
NHI
-
00
-
043 &
Utexas

Educational 4 software

Retaining Wall Design

Center Street & 2080 East

Roadway Connection

Springville City

John
Cazier
, Derrick Turner, Justin Brewer, Taylor
Nordquist


Cheaper than traditional concrete wall


MSE wall: $25
-
$35 / ft²


concrete wall: $60
-
$100 / ft²


Polyethylene
geogrids

placed within soil provide
strength


Precast concrete facing units provide aesthetics


Designed using FHWA
Publication No.
NHI
-
00
-
043 &
Utexas

Educational 4 software

Retaining Wall Design

Center Street & 2080 East

Roadway Connection

Springville City

John
Cazier
, Derrick Turner, Justin Brewer, Taylor
Nordquist


Cheaper than traditional concrete wall


MSE wall: $25
-
$35 / ft²


concrete wall: $60
-
$100 / ft²


Polyethylene
geogrids

placed within soil provide
strength


Precast concrete facing units provide aesthetics


Designed using FHWA
Publication No.
NHI
-
00
-
043 &
Utexas

Educational 4 software

Retaining Wall Design

Utexas

Educational 4, © 2007

FS = 1.847

Center Street & 2080 East

Roadway Connection

Springville City

John
Cazier
, Derrick Turner, Justin Brewer, Taylor
Nordquist

Sedimentation Basin Design


Designed to prevent sediment from ending up in citizens’
yards after rainstorms


Will catch sediment at the root of the problem with bio
filters


15” pipe will carry the sediment filled water from the bio
filters to the basin


Basin will be 6’ wide and 12’ long


Clean water will be piped into existing storm drains


Center Street & 2080 East

Roadway Connection

Springville City

John
Cazier
, Derrick Turner, Justin Brewer, Taylor
Nordquist

Sedimentation Basin Design


Designed to prevent sediment from ending up in citizens’
yards after rainstorms


Will catch sediment at the root of the problem with bio
filters


15” pipe will carry the sediment filled water from the bio
filters to the basin


Basin will be 6’ wide and 12’ long


Clean water will be piped into existing storm drains


Center Street & 2080 East

Roadway Connection

Springville City

John
Cazier
, Derrick Turner, Justin Brewer, Taylor
Nordquist

Stormwater Sump Design


Designed to drain streets of water runoff from curb
and gutter


Curb face inlets catch water discharge from streets
and remove sediment


Filtered water is sent through a series of gravity flow
pipes, 15” diameter, to a centrally located manhole.


As the manhole fills, it releases the water into a sump
designed to allow stormwater to percolate into the
ground