Sustainability Opportunity Analysis Review (SOAR) Guidelines

savagecowcreekMécanique

22 févr. 2014 (il y a 3 années et 3 mois)

69 vue(s)

Sustainability Opportunity Analysis Review (SOAR)
Guidelines

PEER Rev 0


11 NOV 09

Page
1

of
5

Project Name
:


Click here to enter text.





Project Number:


Click here to enter text.

Client
:
Click here to enter text.


CP Project Mngr
:
Click here to enter text.




10 02 00
Existing Conditions



02 40 00
Demolition and
Structure Moving



Yes

No

N
A

Comments


Utilize Construction Waste Recycling Facility











Separate Waste on Site











Utilize U of M reuse Pro
gram











Enforce Subcontractor Waste Recycling










03 Concrete

Yes

No

N
A

Comments


Fly Ash Content








Recycling Aggregate


100%





04 Masonry

-

04 05 00 Common Work Results for Masonry

Yes

No

N
A

Comments


Dust Control






Collection / Recycling of wash water





06 Wood, Plastics and Composites
-

06 20 00 Finish
Carpentry
;

06 40 00 Architectural Woodwork

Yes

No

N
A

Comments


FSC Certified or Comparable











Formaldehyde Free






No added Urea Formaldehyde












Doors and Casework












Agri
-
fiber or other sustainable Fiber





Sustainability Opportunity Analysis Review (SOAR)
Guidelines

PEER Rev 0


11 NOV 09

Page
2

of
5

07 Thermal & Moisture Protection

-

07

020 00 Thermal
Protection
;

07 030 00 Steep Slope Roofing



Yes

No

N
A

Comments


Increase R Factor










Green Roof Potential










Light color roofing material










Sustainable Material










Recycle Shingles










08 Openings
-

08 50 00 Windows
;

08 60 00 Roof Windows and
Skylights


Yes

No

N
A

Comments


High Efficiency












High U
-
value rating





Reflectivity and Bird Kills










Solar Tubes










09 Finishes

-

09 50 00 Ceilings
;

09 60
0
0

Flooring
; 09 68 00
Carpet; 09 90 00 Paint and Coating


Yes

No

N
A

Comments


Recycle Ceiling Panels











Sheet tile

flooring











Linoleum

flooring












Cork flooring






Sustainability Opportunity Analysis Review (SOAR)
Guidelines

PEER Rev 0


11 NOV 09

Page
3

of
5

09 Finishes
-

09 50 00 Ceilings; 09 60 00 Flooring; 09 68 00
Carpet; 09 90 00 Paint and Coating
(
Continued
)

Yes

No

N
A

Comments


Bamboo flooring






Sealed Concrete flooring






Terrazzo flooring






Raised Floor Systems







Low or no VOC flooring Adhesives and Coatings







Determine necessity of carpet (avoid if possible)








Low or no VOC carpet







Carpet manufactured from
recycled material








Recycle old carpet







Use of 3
rd

party certified carpet







Tiled Carpet







Low / no VOC Paint





26 50 00 Lighting

Yes

No

NA

Comments


Dark Sky Exterior Lighting





31 Earthwork



31 14 00 Earth Stripping and Stockpiling; 31 25
00 Erosion & Sedimentation Controls

Yes

No

NA

Comments


Protection during stripping / stockpiling






Reuse of stripped material







Required use of geo
-
fabric





Sustainability Opportunity Analysis Review (SOAR)
Guidelines

PEER Rev 0


11 NOV 09

Page
4

of
5

31 Earthwork



31 14 00 Earth Stripping and Stockpiling; 31 25
00 Erosion & Sedimentation Controls
(Continued)


Yes

No

NA

Comments


Silt fence





Bio Bags










Sweep Streets










Catch Basin










32 Exterior Improvements


31 10 11 Bases, Ballasts and
Paving; 32 80 00 Irrigation; 31 90 00 Planting

Yes

No

N
A

Comments

Pervious pavers or pavement










High efficiency irrigation










Grey water used for irrigation










Drip irrigation










Rain Gardens












Planting Protection












No digging within canopy area












No storage within canopy area







Use hard
surface staging (where possible)







Green space (last resort)







Limit access to planting area







Mulch to eliminate soil compaction







Site restoration


resod and aerate soil





Sustainability Opportunity Analysis Review (SOAR)
Guidelines

PEER Rev 0


11 NOV 09

Page
5

of
5



District Proj Coord Signature: _______________________________________



Date
: __________________



PM Signature:___________________________________
_
_______________ Date: ___
_______________


Client Signature: _____________________________________________
_
__


Date: __________________



CPPM

Approval: _____________________________________________
__
_

Date: __________________