February 3, 2005 Senior Design Project Scoping Meeting

visitormaddeningUrban and Civil

Nov 25, 2013 (3 years and 6 months ago)

66 views

February 3, 2005 Senior Design
Project Scoping
Meeting


In Attendance:

Mike Paddock

Mollie Bednarowski

Andrew Thorson

Paul Silva

James Ritter


Agreement: Will use last year

s agreement as a template. (
P
hoto copies distributed

by Mike
)


S
cope will need to

be fine tune as follows:



Determin
ation
of Social and Economic Impact

should include or combine with research
of the bridges history



Materials Analysis

should include possible analysis of the bedrock sample; could be
manipulated with coring or trimming



Hyr
aulic Analysis:

Research at UWM; Obtain available stream flow data

Last years analysis was based on
TR
-
55

Analyze using stream flow data and compare to last year

s

results

Seek information from monument

found at the bridge site;

possibility of an
existing
survey
; contact
Mike Gabor


Preliminary Project Design



Existing crossing


structurally
suspect
; at a minimum it will need to be encased in
concrerte
; abutment will require widening



New crossing


concrete girder, 40’

&

33’ spans
,
north rock face is 12’ ab
ove water
surface
,
south rock is
10’ above water



P
ossible Spans


cast in place concrete girder, cast in place concrete T
-
beam, wood (burn
concern), steel

girder
, steel truss



Structure Survey Report
suggested


technical memorandum

before moving onto final

design



Depending on placement of the abutements in the bedrock, new span at existing location
will be in the range of
58
-
64 feet



Design vehicle: H
-
20

Truck


Possibly d
efine
a
Project Manager


Peace

Corp Adam: adam_kralik@hotmail.com


Kevin Hagen


backgro
und in bridges; GAS


NEXT MEETING:

Thursday, February 10, 2005

Design Group Meeting following Scop
ing

Meeting



Individual Responsibilities for
Scope

of Services
:



Roadway Design



James

(Paul)



Site Investigation
/Analysis;

Material
A
nalysis
;
Geotech



Moll
ie (James)



Substructure
s


Mollie

(others as needed)



Span Design & Alternatives



Mollie
(Andy)



Hydraulic Analysis / Hydrolog
y


Paul



Construction Scheduling, Estimates, Quantitie
s


Andy



Drafting


James
&

Andy



Writing


James



Presentations


G
roup



Econo
mic and Social Impact & Bridge History


Paul



PAVA contact


Paul



Tasks for coming week
:



Draft
A
greement



James & Andy



UWM investigation



Mollie & Paul



Survey data


Andy & James (via contacts at
GAS
)



Initiate
Contact with Adam



Paul & Mollie