Project Management Challenges


Approval

Delays


Labour

shortage



Limited

availability

of

skilled

professional


Project

Delay


Fluctuation

in

material

cost













3

TATA HOUSING DEVELOPMENT COMPANY LTD.

Project Management Challenges


Managing

cost

of

construction


Increasing

cost

of

land


Climate

change


Safety

and

Quality

in

affordable

segment


Managing

contractor

in

affordable

sector














4

TATA HOUSING DEVELOPMENT COMPANY LTD.

Approval Delays


Purchase

on

Non
-
agricultural

land



Improving

in
-
house

knowledge

of

bye
-
laws


LEED

certification

and

Green

buildings


Appointing

local

liaisoning

consultants


Outsource

responsibility

with

JD/JV

partners


Prepare

and

keep

updated

list

of

region
-
wise

approvals













5

TATA HOUSING DEVELOPMENT COMPANY LTD.

Labour

shortage












6


Use

of

mechanization

in

construction


Design

standardization


Use

of

less

labour

intensive

technologies



Lost

in

place

shutter


Reinforced

hollow

concrete

shear

wall

construction


System

formworks

like

Mivan


Precast

construction













TATA HOUSING DEVELOPMENT COMPANY LTD.

7

Construction technologies used

Structure made up of high strength hollow
concrete block shear wall
-

reinforced to
provide earthquake resistance

Improvement over conventional load bearing
construction , high strength block and
reinforced

TATA HOUSING DEVELOPMENT COMPANY LTD.

8

Construction technologies used

No
RCC

columns and beams
reducing rebar to on third


Economical and climate friendly

Thickness of
shear wall
is
200mm
even for G+4
structures
as high strength blocks are used

TATA HOUSING DEVELOPMENT COMPANY LTD.

9

Monolithic construction
-

Mivan

Monolithic shear wall construction

No Brick
work and plastering



Better finish quality

Faster Construction

TATA HOUSING DEVELOPMENT COMPANY LTD.

10

Lost in place shuttering
-

Plasswall

Lost in place shutter made up of 100% recycled plastic and
fibrocement boards

Faster
construction,
Reduced
labour

dependency


Eliminates
plastering , Better
finishing quality


TATA HOUSING DEVELOPMENT COMPANY LTD.

Precast Technology:

Technology

Overview



The

process

involves

manufacturing

concrete

elements,

stutural

and

non
-
structural

,

either

in

a

factory

or

at

site

but

not

at

its

final

location
.



In

Brief
:

This

technology

has

a

‘product

centric

approach’

against

the

‘process

centric

approach’

of

conventional

construction
.


Advantages



Faster

Construction

&

Reduced

Labor

Dependency


Superior

&

Controlled

quality

construction


Minimal

Wastage

of

material

&

less

pollution


Internationally

proven

technology,

all

processes

are

established







TATA HOUSING DEVELOPMENT COMPANY LTD.

Precast stair
and elevator
shafts

Solid Load
Bearing
Walls

Hollowcore

Slabs/ Solid
Slabs

Preinstalled
Windows

Facades

Lightweight
Partition
Walls

Precast Technology: Structural Elements


Walls


Load Bearing Walls


Non Load Bearing Walls


Sandwich Walls


Slabs


Solid Slabs


Hollow Core Slabs


Filigree Slabs (Semi Precast)


Facades


Beams


Columns


Stair & Elevator shafts




Nearly all structural elements can be made using Pre Cast Technology

TATA HOUSING DEVELOPMENT COMPANY LTD.

Technology: Slabs

Parameters

Solid Slab

Hollow Core Slab

Filigree

Slab

Concept

Pre
-
stressed

concrete slab with
continuous voids provided to
reduce weight and cost

Reinforced

PC concrete floor

slabs combined with in situ
concrete

Ensures

a monolithic structure

Usage in
countries

Used extensively in
UK, Middle
East

Used extensively in
Germany,
France

Thickness

Can go till
75 mm

Restricted to
150 mm

minimum

Can go till
90 mm

Span

Ideally
4m

spans

Longer

spans without

immediate
support

Longer

Spans can be achieved

Manufacturing

Set up

Forming
/

Slip
former
/
Circulation

Slip Former
/

Extruder

Separate
Filigree

set up
/
circulation
*

Reinforcements
used

Quantity of Reinforcement is
lesser

More

as
triangular

reinforcements is inserted.

Transportation

Costly

as weight is
more

Lesser weight

makes the

transportation cost lower with
respect to solid slabs

Low weight / volume
, the
transport costs to the
construction sites are lower
than for solid slabs.

*
: Extra cost would have to be incurred

TATA HOUSING DEVELOPMENT COMPANY LTD.

Parameters

Solid Slab

Hollow Core Slab

Filigree

Slab

On Site Erection

Process

on site


Very little concrete

is
poured on site


No Support

structure is
needed on site


Major concrete

is poured on
site during installation


Light

flex support

structure
is needed till curing

Lifting Weight

Lifting Weight

is
maximum; High
tonnage cranes needed

Lifting weight is more
compared to semi precast slabs.
So heavier cranes is needed.

Lifting weight is
considerably
reduced
: So lesser bulky cranes
is needed.

Time of Erection

Comparatively

more

Least

More than Hollow

Core slabs

Service Aspect

Less flexible

More

flexible

Technology
-

slabs

TATA HOUSING DEVELOPMENT COMPANY LTD.

Technology: Equipment for Production
-

Walls

Battery Mold


Consists
of
vertically

arranged, adjustable shuttering
panels


Vertical
shuttering system facilitates the manufacturing of wall elements of
varying

wall
thicknesses


Appropriate
wall thickness is defined by the wall profile system, which is inserted
between the two adjacent
shuttering

panels

Description

Usage


Used for producing
Identical

designed Solid walls, Sandwich walls & Enclosure
Walls: Walls w/o openings or standard openings


Faster

Mode of production

Advancements


Heating system
, integrated
in the shuttering panels, using hot
water


Quicker Concrete Curing Process


Leads to larger production capacity


Bottom Up
& Top Down concrete pouring mechanism

TATA HOUSING DEVELOPMENT COMPANY LTD.

Technology: Equipment for Production

Tilting Table


Dimensioned
substructure of
longitudina
l and transverse
profiles


Firmly mounted high frequency
vibrators

that are fed via a frequency
converter


Flexibly
height adjustable side rails (100mm to 250mm) attached to
tilting tables:
Produce Wall elements of varying heights


Several tilting tables can be
combined

with each other and extended with an insert
bridge.

Description

Usage


Used for producing
non identical
Solid Walls, Sandwich Walls, Façade Elements:
Walls with opening

Advancements


Built
-
in heating
register for hot water or thermal
oil


Ensures faster curing


Different side rails
may be
used depending on the concrete
element: They
may be
fixed, height adjustable or movable/foldable in the width.

TATA HOUSING DEVELOPMENT COMPANY LTD.

Limited
availability of
skilled professional


Skill

enhancement

by

training


Project

Management

training

for

Project

heads

collaboration

with

S

P

Jain

institute

of

Management

and

Research


Training

school

for

skilled

labour


Skill

training

at

sites

for

locals


Performance

b a s e d

I n c e n t i v e

s c h e me

f o r

p r o j e c t

h e a d s


C o mp e n s a t i o n

b e n c h ma r k

w i t h

c o mp e t i t o r s












17

TATA HOUSING DEVELOPMENT COMPANY LTD.

Project Delays


Use

of

BIM

in

designing


Design

standardization

and

prototyping


Standardizing

contract

documents

and

specifications


Use

of

technologies


Review

and

improve

preconstruction

timelines












18

TATA HOUSING DEVELOPMENT COMPANY LTD.

Managing cost of project


Improving

robustness

of

initial

budget


Costing

the

project

at

each

stage

including

concept,

schematic,

DD

and

GFC

and

doing

course

correction


Value

Engineering

all

stages

of

project


Design

prototypes

for

value

homes


Use

of

BIM

in

Quantity

estimation


Strengthening

material

and

labour

rate

prediction















19

TATA HOUSING DEVELOPMENT COMPANY LTD.

Increasing cost of land


Managing

cost

of

Affordable

segment


JD

/

JV

Model


Tier

II/

Tier

II

cities


Large

integrated

townships


Design

to

cost


Use

of

technology

to

reduce

cost












20

TATA HOUSING DEVELOPMENT COMPANY LTD.

Climate change












21


Tata

housing

Sustainability

C
harter


All

projects

are

LEED

certified


Carbon

footprint

mapped

and

tracked

for

reduction

every

year


Carbon

mitigation

though

use

of

technology










TATA HOUSING DEVELOPMENT COMPANY LTD.

Sustainability Vision &
Approach Tata Housing

Vision
:

We

would

build

sustainability

into

everything

we

do

so

that

our

profitable

growth

helps

reduce

inequality

and

rejuvenates

the

environment

22

Approach
: 1.
Sustained Intervention in 5 focus
areas in the current year and conducting stakeholder mapping and need
assessment survey at all locations to know long
-
term felt needs of the community and draw a long term intervention strategy
accordingly.

2.
Integrating sustainability across the value
chain of the company.

3.
CS funding is aligned to business
-
shareholder

aspirations and stakeholders aspirations


Focus Areas of Intervention


Tata Affirmative Action across Employment, Employability, Education and Entrepreneurship development of SC/ST
community


:
Vocational Skill Development , Up
-
gradation of Schools and other Educational Initiatives


Environmental Sustainability


Local Infrastructure development


Employee Volunteering/Synergizers

CS Funding
-
Balancing

Profit Linked Corporate Budget(
Embedded to Shareholder Value
) :
2
% of the net profit of THDC and SVHL


Operations Linked Project Budget(
Embedded

to
shareholder value
):
Rs

6
psf

of saleable area divided by the project span for THDC projects
and
Rs

4
psf

saleable area divided by the project span for SVHL projects

TATA HOUSING DEVELOPMENT COMPANY LTD.

TATA HOUSING DEVELOPMENT COMPANY LTD.

Level 1:

Carbon “negative”

Level 3

Carbon “neutral / positive”

Level 2

Carbon “managed”

Focus and
scope

Reduce specific

footprint, with focus


within boundary

Eg
. IGBC Platinum rating,
fly ash bricks, solar
lighting, green sourcing
of power
-
solar power
etc.

Complete lifecycle view to

reduce absolute footprint

and significant play outside

boundary
eg
. Invest in

carbon credit

Reduce absolute

footprint, with some

potential step
-
outs

outside boundary

Eg
. Green technology
procure Green power
-

solar /wind etc., Roof Top
project for buildings

Targets

Minimal
-

5% redn.

over 1
-
3 years

Very aggressive target

reduction of >20% in

next 10
-
40 years

Typically 10
-
20%

reduction over 3
-
10

years

Key characteristics

Growth

Manage growth and

portfolio

Grow, but in a low
-

carbon / carbon

conscious manner


Sustain

Proactively shape real estate regulations
-
especially on renewable energy & green technology

Carbon Abatement Objective

TATA HOUSING DEVELOPMENT COMPANY LTD.

Tata
Housing
Corporate
Sustainability
C
harter


Sustainability
Charter articulates Tata Housing’s commitment
to sustainable development and is an integral part of its
approach to risk management and
growth


This charter comprises our policy and performance standards
on environmental, social and economic
sustainability


Committed to provide safe and sustainable living spaces
contributing to the sustainability throughout their lifecycle


TATA HOUSING DEVELOPMENT COMPANY LTD.

Sustainability in Building design

26

Sustainable Construction

Alt. Building

materials

Renewable


Energies

Energy efficient

systems

Solar water Heating

Usage of Fly Ash

products, AAC Blocks



Gypsum Plaster



Insulated Glazing and

high efficiency Glass

Roof Insulation

Solar Street Lighting







Efficient BEE rated

light fixtures, use of

CFL


Timer based light

systems, Dimmers








Water/ Waste


Management

STP

Water Harvesting

Ground water

recharging


pervious

Concrete

Use of treated water


for construction

Bio Char drum

Zero Discharge

systems

New

Technologies

Mivan

Plaswall

Graviloft &

Terazyme

Gabion

Pre cast

Our target is minimum GOLD
Rating for each of our projects

We have 15% (largest area in
million
sq

ft

) of total
precertified

area by IGBC under development in
real estate sector

SOUTHERN
EXPOSURE

NORTHERN
EXPOSURE

TATA HOUSING DEVELOPMENT COMPANY LTD.

Use of Green Technology
Graviloft

Retaining wall

27


Modifies earth
pressure diagram due
to use of loft


Reduction in steel and
cement , hence green

TATA HOUSING DEVELOPMENT COMPANY LTD.

Gabion walls

28


Gravity structure


Unskilled job


Local stones are used
for making wall


Not
RCC
, local stones
used. No cement
mortar and
reinforcement used


TATA HOUSING DEVELOPMENT COMPANY LTD.

Use of Bio
-
Char drum at sites

29

o
Biomass

at

site

converted

into

active

carbon

using

Pyrolysis

drum


Use

of

local

soil

for

landscaping

instead

of

purchasing

outside

soil
.


Increased

water

holding

capacity

by

about

18
%
,

Increased

nutrient

retention,

reducing

need

of

nutrients


Enhanced

soil

micro

flora

and

fauna,

improving

plant

growths


Capture

and

retention

of

carbon,

benefiting

Carbon

Cycle

(Carbon

Sequestration)


No

impact

on

current

land

scape

design,

turf,

plant

species

we

plan

to

cultivate

TATA HOUSING DEVELOPMENT COMPANY LTD.

30

Use of Bio enzyme for road
subgrade improvement

Use of Bio enzyme for road
subgrade improvement

Saves construction cost by
30%

Reduces maintenance cost,
improves life of road

Improves
CBR

of subgrade
Reduces road thickness

TATA HOUSING DEVELOPMENT COMPANY LTD.

31

Saves construction time by
50%

Environmental friendly and
bio degradable

TATA HOUSING DEVELOPMENT COMPANY LTD.

Big Initiative
-

Beautiful Is Green (BIG), a
green initiative by Tata Housing

BIG is a green initiative by Tata Housing to
create awareness among people and
involving them for making the world
Beautiful by keeping it Green.

This initiative follows a simplistic approach
of involving people to contribute towards
well
-
being of environment by doing
Small
Things
that make
Big Difference.

BIG is GREEN

TATA HOUSING DEVELOPMENT COMPANY LTD.

Safety and Quality in affordable segment



Quality

Non

Negotiable

defined

and

acted

upon


Third

party

Quality

audits


Empanelment

of

contractor

based

on

Quality

and

safety

performance


Separate

safety

budget

for

all

projects











33

TATA HOUSING DEVELOPMENT COMPANY LTD.


We Care

Thank You