Construction Engineering and Inspection Services
Presented by
Carnahan Proctor and Cross,
Inc
Presentation
for
Florida Department of Transportation
District One
CPC TEAM AVAILABILITY
:
100%
Ossie Larrazabal, P.E.,
Sr. Engineer/Project Manager
Patrick Hayes,
Project Administrator
Francis Chin, Jr.
Contract Support Specialist
Humberto Soteras,
Senior Roadway Inspector
George Desharnais
Chief Building Inspector
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
CPC Construction Engineering and Inspection Services
We are 100% committed & available.
Our team is equipped to furnish engineering expertise
necessary to oversee this specialty infrastructure work.
Our team is accustomed with design build projects.
We are finishing the Dixie Flyover project in D4. The very
first ARRA Design Build in the State of Florida!
We are very familiar with the local features and common
issues found on rest area projects.
Our team was the CEI in charge of monitoring the
construction of the rest area on I
-
75 (Alligator Alley)
in Broward County
CPC Construction Engineering and Inspection Services
Our team is equipped to furnish engineering expertise necessary to oversee this
specialty infrastructure work.
•
D/B firm selection process
•
Design
•
Pre
-
construction stage
•
Construction
•
Final Acceptance
•
Post
-
construction
CEI LANDSCAPING GROUPING
The
CPC
TEAM
will
take
a
proactive
approach
.
We
have
already
identified
key
issues
and
will
continue
to
address
and
resolve
ongoing
issues
from
inception
until
final
acceptance
of
the
project
.
CPC’s
team
is
available
to
mobilize
when
construction
begins
in
late
2012
Key
senior
staff
ready
to
enter
ongoing
Design
Build
process
and
attend
required
conceptual/
design
meetings
.
Our
team
consists
of
5
diverse
specialty
companies
with
the
proper
resources
to
provide
District
One
with
expertise
and
support
during
:
CPC Construction Engineering and Inspection Services
The D/B Firm will prepare plans for
demolition and reconstruction of a new
LEED certified Rest Room Facility
CEI LANDSCAPING GROUPING
•
THE NEW FACILITY SHALL PROVIDE:
•
16 Men’s and 24 Women’s rest room
fixtures
•
4 Family Rooms
•
Vending Area
•
Recycling Areas
•
Storage Areas
•
Security Office
•
Break Room
•
WIFI conduit and shelf
•
16’ x 30’ Stand Alone Storage Unit
CPC Construction Engineering and Inspection Services
The D/B Firm will design and construct the replacement of the existing
plant
located
on site.
This facility must be designed and
constructed to accommodate:
CEI LANDSCAPING GROUPING
•
South Rest Area Building
•
Future North Rest Area Building
•
Public Safety Center
•
30,000 gallons per day from Broward County
Rest Area
•
Additional 30% Future Expansion
The D/B Firm must coordinate with DBI
(Asset Management Contractor) for the removal
and salvage of several pieces of equipment
CPC Construction Engineering and Inspection Services
The
D/B Firm will
design and construct the replacement of the existing plant located
on site. This facility must be designed and constructed
to accommodate:
CEI LANDSCAPING GROUPING
•
South Rest Area Building
•
Public Safety Center
•
FIRE SUPRESSION SYSTEM AT
THE PUBLIC SAFETY CENTER
•
HISTORICAL LOSS OF WATER PRESSURE
WHEN LARGE GROUPS UTILIZE FACILITY
The
D/B Firm must coordinate with DBI
(Asset Management Contractor) for the
removal
and salvage of several pieces of
equipment
CPC Construction Engineering and Inspection Services
The D/B Firm will design and construct Two Recreational Access Areas for the Big
Cypress National Preserve; one on either side of I
-
75.
Each area will incorporate:
CEI LANDSCAPING GROUPING
•
15 Single
spaces
•
25 Truck/Trailer
spaces
•
Parking
Area Bar
Gate
•
Automated
12’
wide vehicular gate
CPC Construction Engineering and Inspection Services
•
Self
-
closing
ped
gate
to the Florida
Trail
•
10’ high Wildlife fence
•
Electrical
meters
•
Lighting
with the
exception of the arms
and luminaries
The D/B Firm will design and construct a LEED Certified Public Safety Center
within the FDOT right
-
of
-
way.
The D/B shall incorporate the following into the center
:
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
•
Accommodations
for 4 to 6
persons
•
2
Emergency
Vehicle Bays
•
Emergency
Back
-
up
Generator
•
Fire Suppression
System
Minimum Technical
Requirements must be Followed
The Roadway Plan set
shall contain:
Drainage Analysis
Depict the Pavement Design
Resurfacing of the existing Rest Area
New roadway for Recreational Access Areas
CEI LANDSCAPING GROUPING
The
Roadway Plan
components shall be:
•
Lighting Plan
•
Signing and Pavement Markings
•
Landscape
CPC Construction Engineering and Inspection Services
Alex DeMarco
Project Manager
DBI
–
Asset Management Contractor
The D/B Firm will regularly coordinate with
DBI’s Project Manager, Alex DeMarco, for
the pick
-
up of salvageable material,
maintenance final walkthrough, maintenance
transfer, warranty hand
-
over, etc…
CEI LANDSCAPING GROUPING
MISSION
To exceed District One’s expectations and accountability
Serving the Department and our community
Through a commitment of on
-
time project delivery within budget
while applying the highest quality standards
VISION
To function as the exemplary model of a
CEI Team on a Design Build project
CPC Construction Engineering and Inspection Services
CEI LANDSCAPING GROUPING
Prior to
Construction
•
CPM Schedule
•
Schedule of Values
•
QA/AC Plan
•
Plan Review / Submittals
•
Specifications Package
•
Pre
-
Construction Conference
•
Pre
-
Activity Meetings
•
Contractor
QC Plan
•
Public
Information
CPC Construction Engineering and Inspection Services
CEI LANDSCAPING GROUPING
CPM Schedule
•
Activities
•
Logic
•
Milestones
•
D
ifferent Phases
•
R
esource Loaded
•
Cost Loaded
•
Sure
trak and primavera
will
be used for
review
CPC Construction Engineering and Inspection Services
PLAN SUBMITTALS:
CEI LANDSCAPING GROUPING
Management
Approach: Our constructability
analysis will include both field and plan
reviews, and will address staging, phasing,
environmental concerns, equipment access,
Rest Area access, BCNP access, MOT, ADA,
maintenance (MRP), drainage and ITS FMS
conflicts, as well as more building specific
issues such as wastewater, potable water, site plan
foundation & structural, electrical, plumbing,
HVAC, roofing and finishes
CPC Construction Engineering and Inspection Services
90% Component Plans
Final Component Plans
Construction Set
Record Set
PLAN
REVIEW
PROCESS
D/B FIRM
FDOT
DESIGN
PM
ERC
CEI PLAN
REVIEW
COLLIER
COUNTY
PLAN
REVIEW
CPC Construction Engineering and Inspection Services
CPC
Construction Engineering and Inspection Services
PRIOR TO CONSTRUCTION:
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
Pre
-
Design Conference
Read the Contract! Compare with the Division 1 Design Build
Specifications, Minimum Technical requirements for Public Safety
Center, Value Added Specifications, Technical Provisions, NEPA
Documents, ERP Permit and Right of Way Documents to determine
e
conflicts. Discuss with the Project Manger.
PRE DESIGN
PACKAGE
: SHOW THEM HOW IT IS DONE
Set up tracking system for shop drawings, submittals and schedule of
events
Review requirements for lab testing through the District One Materials
Lab and State Lab
Video
tape and photograph project showing existing conditions of rest
area grounds, on and off ramps, ITS devices and infrastructure, wildlife
fence, BCNP, entry gates, etc.
PRIOR TO CONSTRUCTION:
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
Pre activity meetings: Clearing and Grubbing, Demolition, Rest
Area Closure, Specialty Trades (Electrical, Plumbing, HVAC,
Roofing), Waste and Water Treatment Facilities, Asphalt, Lighting,
Landscape, Drainage
Each and every one of our major construction activities will involve a pre
-
activity meeting. Our Key Personnel, Specialty Inspectors, the D/B Firm,
DBI, the Department, Collier County (when necessary), and BCNP (when
necessary) will attend the mandatory meeting. Discussed will be the
contractor’s work force, location of activities, contractor’s approach, duration
of activities, and points of contact.
Once work begins, should items/issues arise that were not discussed during the pre
-
activity
meeting arise, a follow up meeting will take place immediately to address these issues
.
PRIOR TO CONSTRUCTION:
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
Approach: The CEI Team will review the Contractor’s QC Plan and provide
comments to the contractor relating to content, equipment, qualified testing
personnel and materials/design mixes.
Once comments have been addressed, QC Plan will be forwarded to District
Lab for final approval. It is the CEI team’s responsibility to ensure that the QC
Plan is being followed at all times and inform the DOT LAB immediately of
any changes.
Changes to QC Plan will require a Revised QC Plan Submittal from the contractor
requiring the same approval process as the initial QC Plan.
•
Changes to QC Plan will require a Revised QC Plan Submittal from the contractor requiring the same approval process as the in
iti
al QC Plan.
•
Changes to QC Plan will require a Revised QC Plan Submittal from the contractor requiring the same approval process as the in
iti
al QC Plan.
PRIOR TO CONSTRUCTION
CPC TEAM will take a positive role in communication .
Community Awareness Plan
Letters to government department heads
Weekly press releases via Project Website
BigCypress75.org
Create a Facebook page and Twitter account
keep stakeholders up to date.
Prompt close out of motorists complaints
Awareness of changing Traffic Conditions due
to construction, holidays, events and weather
CPC Construction Engineering and Inspection Services
Public Complaint
Tracking Form
DURING CONSTRUCTION
CPC TEAM will be in constant communication .
Communication with Everglades Radio
Network
Live camera feed linked with our Web Site
Web site will have a direct link to the INK
Force Web Site
CPC Construction Engineering and Inspection Services
CEI LANDSCAPING GROUPING
During to
Construction
•
Weekly Progress Meetings/”HOT ISSUE” Notification
•
Continual Coordination and Communications with Tim
Hendrix
•
Maintenance of Traffic (MOT)
•
Schedules / Project Time
•
Monthly Estimates / Schedule of Values
•
Document Control
•
Public
Information
CPC Construction Engineering and Inspection Services
Approach: Every week a progress meeting will be held with the PE/PM, PA,
Inspectors, CSS, and the D/B Firm to discuss the project schedule as it relates to
construction activities, shop drawings, submittals, deliverables, coordination etc...
From these meetings, resolution to pending items will be discussed and documented
and action plans and time frames established for the completion of any outstanding
issues.
Items that the PE/PM deems critical will be categorized as a “HOT ISSUE” and
forwarded to Tim Hendrix as a notification. The notification will identify the issue,
provide recommended alternatives/action plans as well as timeframes and results.
CEI LANDSCAPING GROUPING
Weekly Progress Meetings / “HOT
ISSUE NOTIFICATION”
CPC Construction Engineering and Inspection Services
CEI LANDSCAPING GROUPING
MAINTENANCE OF TRAFFIC:
Critical
Awareness Points
•
Hurricane Plan/ Evacuations Procedures
•
Ensure
Contractor has detailed Hurricane Plan in effect
•
Maintain Emergency Contact Numbers
•
Coordinate with local, state and federal agencies and
officials
•
Ensure
prompt removal/ securing of equipment and
materials prior to evacuation
•
Accountability
of MOT devices in place
CPC Construction Engineering and Inspection Services
CEI LANDSCAPING GROUPING
During
Construction
•
Schedule of Values/Project Time
•
Track
and expedite review and resolution of all issues
•
Review Monthly CPM Schedule
•
Review weekly project progress against approves CPM schedule
•
Proactively identify potential time
-
saving alternatives during
construction
•
Assist in identifying delaying activities and the cause
•
Awareness of contract time
•
Input Schedules in tracking log
•
Proper
management of control Schedule of values as it relates to
Contract Time
•
Proactively mitigate claims review
CPC Construction Engineering and Inspection Services
CEI LANDSCAPING GROUPING
During
Construction
•
Monthly Estimates / Schedule of Values
•
Management and close coordination of the Schedule of Values
•
Daily, Weekly and Monthly Tracking Spreadsheets, Daily Reports and
quantities
•
Fuel & Bit Adjustments
•
Track Shop Drawings
•
Weather / Holiday Letters
•
Monthly Certifications
•
S.A./Work Order
CPC Construction Engineering and Inspection Services
Document Control
•
Design Build projects require a well structured and
organized document control plan to ensure that all
information is easily and immediately accessible to
key project personnel. They will be equipped with
mobile broadband connected laptops and
Blackberry’s capable of producing emails, sharing
pictures, videos, etc, as part of our innovative
document control process. This will enable our
team to access our cloud server, so that key
personnel will have access to documents for any
project, inputting multiple dailies or uploading
photos.
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
CEI LANDSCAPING GROUPING
Post Construction
•
Final Estimates
•
Material Certification/LIMS
•
QA/QC Review
•
Process Mapping for areas of improvement
CPC Construction Engineering and Inspection Services
CPC Construction Engineering and Inspection Services
Team Work
Dual Roles For All Key Personnel
Versatility And Adaptability
Project Team Are Proficient In The Field
And Office
Proactive
Problem Solvers
Instant Information Sharing Capabilities
Obtain Resolution Of Issues At The
Lowest Level Possible
CPC Construction Engineering and Inspection Services
The
CEI
Team will
carefully review each specification as it relates to final
closeout warranty related information
.
Rest area building
• Water treatment plant
• Wastewater treatment plant
• Roadway features
• Highway lighting system
• Drainage systems
• Concrete defects
• Structural steel defects
• Post tensioning systems
Value Added Features
CPC Construction Engineering and Inspection Services
CEI
Team will
coordinate
this process and
explain any questions that
contractor may have. By
following our proactive
management
style
we hope to
mitigate most issues before they reach
the escalation
process.
Conflict Resolution
Our CEI
Team is keenly aware of the conflict resolution process for
this
D/B
contract.
CPC Construction Engineering and Inspection Services
The CEI Team has developed the unique ability through aggressive claims
avoidance and value engineering techniques to uncover and resolve issues
that add cost or delays to a project
.
Claim Mitigation & Cost Savings
The CEI Team
proactively reduces
, eliminates, and mitigates claims
•
Continuous review of plans, specifications and project site by the CEI team
during the
Design
Build phase and prior to each milestone
•
Continuous
review of the contractor’s submittal schedule
•
Prompt
response to all correspondence
•
Maintain
a written record of all project
-
related meetings
•
Follow
-
up
all verbal direction given in field in writing within 24 hours
•
Maintain
a video record of the pre
-
existing conditions, TCP phase changes, and special
construction operations
CPC Construction Engineering and Inspection Services
•
Environmental Concerns/Permits
•
Maintenance of Traffic
•
Utilities
•
Design &
Submittals
•
Shop Drawings
•
Demolition
•
Building Plan Review
•
Waste Water and Water Treatment
Plants
•
Recreational Access Areas
CPC Construction Engineering and Inspection Services
Environmental Critical Awareness Issues:
Management Approach Solution
:
•
Maintain Wildlife Fencing
•
Coordinate
with BCNP from the onset of the project
•
Advise Department PIC and BCNP about temp
access closure to Florida
Trail
Conduct
pre
-
activity meeting with the
contractor and BCNP to coordinate
removal
of existing fence and gate
CPC Construction Engineering and Inspection Services
Environmental Critical Awareness Issues:
Management Approach Solution
:
•
Erosion
control
devices
•
Review the approved SWPPP
•
Ensure that all erosion control devices have
been installed correctly
•
Monitor, document and follow
-
through on the
contractors efforts to maintain the devices
throughout construction
CPC Construction Engineering and Inspection Services
Environmental Critical Awareness Issues:
Environmental
Permits
•
Coordinate D/B
Firm
with
D 1 Permits & Drainage
office
•
Ensure design meets storm water permit conditions from SFWMD and
ACOE
•
Coordinate with Brian Monkelbaan from Dist. Environmental Office
•
Monitor and ensure that the contractor adheres
to the following permits:
•
Environmental
Resource Permit from SFWMD
•
Clean Water Act Dredge and Fill from Army
Corp of Engineers
•
National Pollution Discharge Elimination
System (NPDES) from DEP
Management Approach Solution:
CPC Construction Engineering and Inspection Services
We have already started to work with
Collier County to discover the typical
problems at the Waste Water treatment
Plant. This knowledge will be valuable when
coordinating with the D/B Firm on a system
design.
CPC Construction Engineering and Inspection Services
LANE CLOSURE PROCEDURE
We will adhere to the Lane Closure
Process for Fort Myers Operation Center
ROADWATCH WORKSHEET
FORT MYERS OPERATION
S CENTER
THIS WORKSHEET IS DU
E TO BRIAN BIRD BY T
UESDAY AFTERNOON NO
LATER THAN 5:00 PM
THIS WORKSHEET SHOUL
D REFLECT WORK BEING
PERFORMED DURING THE
FOLLOWING WEEK
D
ATE
:
February 16, 2012
TO:
Brian Bird / Fort Myers Operations Center
(239
-
656
-
7883 SC: 741
-
7883)
F
ROM
:
Mark Wiseman
P
HONE
#
/
E
XTENSION
:
(239) 348
-
7923
LOCATION
COUNTY:
Collier
SR #:
93 (I 75) at SR 951
SECTION #:
03
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
FROM
(Cross Street):
N/A
Mile Post:
50.268
TO (Cross Street):
N/A
Mile Post:
51.001
CONTACT INFORMATION
COMPANY:
Allied Engineering & Testing, Inc.
CONTACT:
Mark Wiseman, Project Administrator
PHONE:
(239) 348
-
7923
GENERAL INFORMATION
TYPE OF
ACTIVITY:
Mobilization of construction equipment to the project site and installation of erosion control devices.
WHAT MOTORISTS SHOUL
D EXPECT
YES…….
NO………
Lane Closures
(
FROM
TO
)
YES…….
NO………
Slow Moving Traffic
YES…….
NO………
Weekend Work
(
FRO
M
TO
)
YES…….
NO………
Delays
YES…….
NO………
Night Work
Publish in Roadwatch:
From
2/18/12
To
2/24/12
Extend through
N/A
ADDITIONAL NOTES / C
OMMENTS
First day of construction activities will be on Monday, February 20
th
. It is anticipated that with the delivery of
large earth moving equipment,
minor delays may be expected as transport vehicles enter and exit the jobsite.
Processed &
Received by BTB: _______________ Ready to file
CPC Construction Engineering and Inspection Services
MOT Critical Awareness
Issues
•
VMS Boards
•
Coordinate with the contractor to place VMS
boards at both toll plazas before start of
construction
•
Advise motorists
temporary
closure of Rest
Area two weeks prior
Management Approach Solution:
CPC Construction Engineering and Inspection Services
MOT Critical Awareness
Issues
•
Access Roads Open (Loop
)
•
Coordinate with D/B firm to ensure TCP
keeps access to loop
•
Ensure devices and set up are as per approved
TCP
•
Drive area to ensure safe passage for motorists
Management Approach Solution:
CPC Construction Engineering and Inspection Services
MOT Critical Awareness
Issues
•
Rest Area
Closure
•
Coordinate with
D
-
1 Construction
PM,
Department PIC and D/B Firm
•
Post on Project Website
•
Keep VMS’s up to date
Management Approach Solution:
CPC Construction Engineering and Inspection Services
Utilities Critical Awareness Issues:
•
ITS FMS
•
Coordinate with the D/B Firm and
identify
possible alternative to avoid
ITS Splice Vault
•
Coordinate and ensure accuracy that all ITS
FMS devices and infrastructure are depicted on
the plans
•
Monitor contractor activities to protect ITS
FMS devices and infrastructure
Management Approach Solution:
CPC Construction Engineering and Inspection Services
Utilities Critical Awareness Issues:
•
Lee County Electric
Co
-
Op
•
Ensure contractor obtains and maintains
Sunshine One Tickets
•
Coordinate several new meter locations and
associated drops
•
Coordinate with the D/B Firm’s Utility
Coordination Manager throughout the
project
Management Approach Solution:
CPC Construction Engineering and Inspection Services
Utilities Critical Awareness Issues:
•
Century
Link
•
Monitor contractor activities to protect telecom
infrastructure
•
Coordinate with D/B Firm’s Utility
Coordination Manager to provide new service
to Public Safety Center
Management Approach Solution:
CPC Construction Engineering and Inspection Services
CEI LANDSCAPING GROUPING
Provide management and coordination of all specialty
functions on this Design Build project in order to exceed ALL
contract requirements.
CPC Construction Engineering and Inspection Services
•
Experienced
–
“No Learning Curve”
•
Commitment
•
Availability of Resources
•
Pro
-
Active
•
Accountability
–
“Buck Stops Here”
•
Adaptability
CEI INTERNAL QA/QC PLAN:
CEI LANDSCAPING GROUPING
CPC CEI has an extensive internal QA plan with our advisor John Hart, P.E.
Our QA reviews are conducted as per District One Standards and applicable CPAM
sub
-
articles.
Applicable Documents
Guidelines
Review Frequency
Keeping Applicable Certification Up To Date
Personnel On Latest Technology
Smart Phones
Net Books
Wireless Internet Access
Cloud System
Enhanced Communication Abilities
Findings and Follow Ups
“Negotiated Hours” vs.“Actual Hours”
CPC Construction Engineering and Inspection Services
CEI WORKFORCE MANAGEMENT
CEI LANDSCAPING GROUPING
Ossie
will
diligently manage and oversee the entire team. He will review
and approve
regular hours on a weekly
basis.
•
Use
of dynamic spreadsheet to track negotiated hours vs. actual
hours
•
All
overtime will have to be approved in advance and it will be tracked on a separate
spreadsheet
•
Workforces
will be scheduled
accordingly
•
Support
specialty staff will be used on an as needed
basis
only
•
If
workload is slow then personnel will take vacation time in a staggered and
coordinate manner to create savings for the department.
CPC Construction Engineering and Inspection Services
Osvaldo “Ossie” Larrazabal P.E.
Senior Project Engineer and Project Manager
11 Years experience on FDOT (CEI) Construction Engineering and Inspection on roadway and bridge
construction projects including CEI Residency Contracts
Hands on Team Leader with Strong Technical Background and Local Knowledge of Project
Successfully completed and delivered over 40 high profile roadway and bridge projects
Proven record of running multiple assignments with large staff efficiently reducing costs and overtime
100% Available
Patrick Hayes
Project Administrator
24 Years of Construction Management Experience
Responsible in charge of multiple bridge and roadway projects
Dedication to ensuring quality projects delivered to clients
Determination in coordination with contractors and stakeholders
100% Available
John Hart, P.E.
Quality Assurance/ Quality Control
Over 18 Years experience FDOT (CEI) Construction Engineering and Inspection on roadway and
bridge construction projects
Successfully completed and delivered over 40 high profile roadway and bridge projects
CEI oversight and management of 5YR super residency contract consisting of multiple projects
Completed over 100 projects during this contract
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
Francis Chin Jr.
Contract Support Specialist
13 Years experience on FDOT (CEI) Construction Engineering and Inspection projects
Proven record ensuring accuracy, preparation and submittal of Final Estimates packages
Successfully completed and delivered over 40 high profile roadway and bridge projects
Responsible for monthly progress estimates, preparation of supplemental agreements , work orders and
entering and processing Site Manager
100% Available
Humberto “Bert” Soteras
Senior Lead Roadway Inspector
21 Years experience on FDOT (CEI) Construction Engineering and Inspection projects
Successfully completed and delivered over 40 high profile roadway and bridge projects
Strong team leader bringing building working relationships and open communication with all parties
Establishes and maintains quality control
Tremendous knowledge of FDOT specifications, final estimates, procedures and material testing &
sampling
100% Available
George Desharnais
Chief Building Inspector
24 Years experience
Certified building inspector
Plans examiner
Licensed general contractor
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
Ryan Santiago
Senior Inspector
9 Years experience on FDOT (CEI) Construction Engineering and Inspection projects
Progressively acquired experience in the field
Successfully completed positions cross trained as a senior inspector and contract support specialist
Advanced level of knowledge in final estimates and LIMS knowledge
100% Available
Paul Dooley
Asphalt Plant Inspector
20 Years experience on FDOT roadway and bridge projects
CTQP qualifications include asphalt paving 1&2, asphalt plant 1&2 and earthwork
Army core of engineering experience
100% Available
Jennifer Zelney
-
Hill
Asphalt Plant Inspector (Alternate)
17 Years experience in the construction industry
CTQP qualifications include asphalt paving 1&2, asphalt plant 1&2 and earthwork
Successfully completed both construction, roadway and bridge projects
CPC Construction Engineering and Inspection Services
David Alvarado, E.I
Roadway Inspector
9 Years experience on FDOT (CEI) Construction Engineering and Inspection projects
Cross trained as contract support specialist
Proficient in Site Manager, LIMS and other FDOT software applications
100% Available
Richard Yong
Roadway Inspector
2 Years experience on FDOT roadway projects
CTQP qualifications include asphalt paving 1&2 and earthwork
Quantifiable success managing multiple projects developing strong relationships with contractors,
government agencies and stakeholders
100% Available
Winnifred “Winnie” Wilson
Secretary/Administrative Assistant
22 Years experience on FDOT construction projects as a RCS / Secretary
Currently serving on Design Build ARRA Dixie Highway project
Successfully completed over 100 projects as RCS on District 6
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
Salvatore Licitra
Chief Electrical Inspector, Master Electrician ( EC000228)
20 Years experience as an electrical inspector
Conducts electrical inspections and plans review on a daily basis
Experience includes public and private sectors
Ensures compliance with South Florida Building Code and National Electric Code
Daniel Ozuna, EI
Chief Structural Inspector
26 Years of professional experience
Certified general contractor
Specialty includes building inspection and building plans examination
Experienced with various agencies delivering building code services
Robert Gonzalez
Chief Mechanical Plans Inspector
12 Years experience includes both public and private sector
Mechanical plans examiner
Mechanical inspector
Ensures compliance with the South Florida Building Codes
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
Sandra Lee, LEED AP BD&C No. 10215598
Environmental Specialist
20 Years professional experience
Leads CGA’s Environmental Planning Department
Coordinates regulatory permitting, environmental permitting, site assessment, resource management
and environmental technical support services
Experience includes establishing governmental protection plans for wetlands and fauna
Bruce Bernard
Senior Utilities Inspector
30 Years of professional experience in related fields
Held positions in public and private plant and utility field operations
Specialty includes drainage concepts and installation, water and waste water design and installation
Experience includes serving as Department of Public Works and Capital Projects
David Grasso
-
O’Brien
Landscape Inspector
7 Years professional experience
Certified Florida landscape Inspector
Specialty includes monitoring invasive plant species and GIS inventory
Experienced in code enforcement and landscape inspections
Darren Alfonso
Public Information
-
over 25 Years of public involvement outreach and community outreach
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
CPC will provide the Department its unique 3
-
D high definition scanning
technology,
which merges
both
horizontal
and vertical datum into a 3 dimensional data
file
This
is exceptional for use
in earthwork
and vertical building construction applications
.
High definition scanning
will be
used to as
-
build the entire I
-
75 Rest Area project site including all
buildings
, retention
ponds, parking lots and
ramps.
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
3D HIGH DEFINITION LASER SCANNING
•
This as
-
build file will be comprised of
electronic digital files, which will be utilized
to cut cross sections, confirm volumes & cross
slopes of water treatment retention ponds, and
catalog all elements of the buildings.
•
The 3
-
D high definition scanning survey
services are furnished at the standard
established survey crew rates in the contract at
no additional cost to the Department
INKforce
Building and Permitting Tracking
is a module based program
It
enables the Department,
Contractor, County, and
the CEI the ability to
streamline the building and permitting
process with
this end
-
to
-
end
solution
It
includes: Global inspection and job type
configuration, Document
centralization, Permit fee configuration, Building
code integration
to
support, ISO standards, Contractor profile
management system
, Full GIS
integration, Permit analyzer, Department
Access Portal
, Bulk inspection
assignments, Executive console, On
-
line
payments, Fully
mobile from
the field, Full search / reporting capabilities,
Bar
-
Code integration
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
INK FORCE WEB SITE/SOFTWARE
CGA has
developed
and employs
a proprietary software program known as
INKforce
to
assist staff with scheduling of required
inspections.
FDOT D
-
4,1998 I
-
75 Alligator Alley Rest Areas:
--
The $ 7 mill I
-
75
Alligator Alley Rest Area project group in District 4 consisted of new
rest area facilities, pavilions, boat ramps, floating docks and
decorative native landscaping. That project, much like this project
required close coordination with local Tribal Communities, the
Everglades Airboat Club as well as high ranking politicians.
I
-
75
Alligator Alley was completed on time and ahead of schedule and
was nominated for an FTBA “Best in Construction Award”.
After
the projects were completed, the local community was
exceptionally pleased with the final product, which led to several
very positive press releases and satisfied local residents. The scope
of this project is very similar and will have many of the same
challenges and concerns.
Reference: FDOT Project Manager Jennifer Olsen, PE
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
PAST PROJECTS
FDOT D
-
4 I
-
75 interchange Bridges (10 Bridges) & SR
-
838/Sunrise
Blvd
Bridge: Contract
consisted of deck repair and epoxy overlay of
ten concrete box girder
segmental bridges
at the I
-
75 / I
-
595
Sawgrass
Expressway Interchange and Sunrise Blvd.
Bascule Bridge
rehab
over the Intracoastal Waterway. The scope of work includes the
recoating of
the structural steel of a bascule bridge over the
Intracoastal Waterway. The traffic
was controlled
with staged work
activities and partial lane shifts allowing the continuous flow
of vehicles through the work areas.
Reference: FDOT Project Manager:
Eghbal
Jalali
, 954.958.7632
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
PAST PROJECTS
FDOT D
-
4 Dixie Flyover Bridge “First FDOT ARRA
Design Build project in Broward County: This
project
involves
the realignment of Dixie Highway from south of
Hillsboro
Boulevard (
SR
-
810) to north of the Hillsboro
Canal. Just north of the Hillsboro
Boulevard intersection
,
the proposed 4
-
lane alignment rises vertically and
becomes
an elevated
structure over NE 2nd Street, NE
1st Avenue, North River Avenue
, Florida
East Coast
(FEC) Railway tracks, NE 2nd Avenue, and the
Hillsboro
Canal
. Once the elevated structure crosses over the
Hillsboro Canal and
enters Palm
Beach County, the
alignment ties back down to the existing roadway.
A total
of three new bridges were constructed and the existing
road was
fully reconstructed
.
Reference: FDOT 4 Project Manager: James Jeffers P.E.
954.777.4600
CEI LANDSCAPING GROUPING
CPC Construction Engineering and Inspection Services
PAST PROJECTS
CPC Construction Engineering and Inspection Services
Our team is highly experienced without a learning curve needed! We are 100%
Committed & Available for the duration of this contract. Our team is also pro
-
active in its
management style. Constant coordination with the contractor and District 1 gives us the
ability to be adaptable to any situation. With our internal QA reviews at every major step,
it holds our project team accountable.
Our project team will be armed with the latest in technology. All of our project personnel
will have netbooks, with full Internet access. This will allow them to access our cloud
server for instant accessibility and information update. Our team will also have
Blackberry’s capable of producing emails, sharing pictures, videos, etc…
The CPC TEAM will provide the and coordination of all resources to
exceed District 1’s goals and contract requirements.
The
CPC TEAM
is Uniquely Qualified To Be
Selected For Providing Services To District One
Presentation for Contract # 12132 April 09, 2012
Enter the password to open this PDF file:
File name:
-
File size:
-
Title:
-
Author:
-
Subject:
-