EROSION AND SEDIMENT CONTROL AGREEMENT IN LIEU OF PLAN

trextemperMechanics

Feb 22, 2014 (3 years and 5 months ago)

75 views





EROSION AND SEDIMENT CONTROL
AGREEMENT IN LIEU OF PLAN


ADDRESS/LOT # ___________________________________________________________________

AREA OF LOT IN SQ. FT _______________________________________________________


LANDOWNER ___________________________________________________________________

ADDRESS ___________________________________________________________________

EMAIL ___________________________________________________________________

PHONE ___________________________________________________________________


RESPONSIBLE LAND DISTURBER _____________________________ NO.___________________

ADDRESS ___________________________________________________________________

EMAIL ___________________________________________________________________


In lieu of submission of an Erosion and Sediment Control Plan for the construction of this single
family dwelling, I agree to comply with any reasonable requirements determined necessary by
employees of the City of Staunton, representing the Erosion and Sediment Control Program
Administrator. Such requirements shall be based on the conservation standards contained in the City
of Staunton Erosion and Sediment Control Ordinance, and shall represent the minimum practices
necessary to provide adequate control of erosion and sedimentation on or resulting from this project.

As a minimum, all lots will have a stone construction entrance, silt fence will be constructed as
needed and all denuded areas on the lot shall be stabilized within seven (7) days of final grading with
permanent vegetation or a protective ground cover suitable for the time of year.

I further understand that failure to comply with such requirements following notice by the
representatives of the City of Staunton could result in citation for violation of the City of Staunton
Erosion and Sediment Control Ordinance.





Page 1 of 2
Section 13.05.060 of the City Code requires that a performance Guarantee be filed with the
Engineering Department in the amount determined by the Program Administrator. Such
performance guarantee shall be conditioned to ensure all work conforms to approved standards and
specifications as specified in the approved Erosion and Sediment Control Plan.


Final Inspection of the project shall be made by the Program Administrator or designated agent.
The release of any Performance Guarantee is contingent upon the findings of such inspection.

By signature below, the applicant certifies and agrees to the requirements of this agreement.




__________________________________________ ________________________
SIGNATURE OF LANDOWNER DATE


__________________________________________ _________________________
PROGRAM ADMINISTRATOR DATE






OFFICE USE ONLY:

PERFORMANCE GUARANTEE AMOUNT OF $2500.00 RECEIVED_______________

APPLICATION FEE OF $250.00 RECEIVED_______________























Page 2 of 2