Red Canyon CRM Title II Funding Request

Appendix 1

The Red Canyon Cooperative Resource Management Team
(CRM)
has applied for funding from the
Wyoming
Wildlife and
Natural Resource Trust Fund
(WNRT)
to implement infrastructure improvements
th
at will
enhance wildlife habitat across all lands within the CRM
. Title II funding is being requested to be
used as leverage for
the WNRT grant for the improvements made on USFS lands
. Title II funding would
equal roughly 50% of
USFFS land
project costs. If we are

unsuccessful in our larger grant application I
would request that we use the Title II funding only to get as many of t
he

projects
below
done as
possible. If Total requested amount is not approved I would request that partial funding be granted for
the pro
jects below that the committee deems important.

If successful these funds will be administered through the Lander Office of the Nature Conservancy.

Project Descriptions and Cost Break outs

Fencing

1.

Orchard draw fence.

Replace 1 mile of buck and pole fence
that was destroyed by fire in 2003. Materials are available
at the site (standing burnt and blow down timber). We plan to use
Custom Fence Contractors
for all work

Costs

Contractor Cost

-
$
18,000

Total


$18,
0
00


2.

Pass Creek Fence.

Install .55miles of Wildl
ife friendly fence. This will serve as a pasture boundary fence in an area
that we have trouble containing the cattle. This project will also require a cattle guard to cross
the main r
oa
d (see below). Plan to use custom fencing
contractors

to complete proj
ect

Costs

Custom Fence contract (materials and Labor)
-
$ 6,600

Pre site Surveys
-

$500

Total


$
7
,
1
00


3.

Riparian Pasture Fence.

Replace .9miles of dilapidated barb wire fence with Wildlife friendly fence, including large
portions of lay
-
down fence to
accommodate wildlife migrations. This pasture contains large
areas of riparian habitat and the fence will serve to split this pasture in half allowing us better
grazing distribution.

Plan to use custom fence contractors to complete project.

Costs

Custom Fe
nce contract (materials and Labor)
-

$10,800

Total


$
10,
8
00

4.

Snow Creek Pasture Fence
.

Replace .75miles of old barb wire fence with Wildlife friendly fence and large portions of lay
-
down fence
. Plan to use custom fence contractors to complete this project.

Costs

Custom Fence contract (materials and Labor)
-

$9,000

Total


$
9,000


5.

Ed Young Pasture Fence

Replace .5 miles

old barb wire fence with Wildlife friendly fence and large portions of lay
-
down
fence. Plan to use custom fence contractors to complete this

project.

Costs

Custom Fence contract (materials and Labor)
-

$6,000

Total


$
6,000


6.

Bayer Mountain Fence

Relocate .5miles of barb wire fence out of the riparian area to reduce grazing impacts and
erosion. Install Wildlife friendly fence with portions of l
ay down fence. Plan to use custom fence
contractors to complete this project. Project will also involve moving a cattle guard (see bellow)

Costs

Custom Fence contract (materials and Labor)
-

$6,000

Pre
-
Site Survey
-

$500

Total


$
6,500


Total Fencing Costs

-

$57,400

Total Title II Funding request
-

$28,200


Water Development

1.

Pass Creek Pasture

Install a spring box, burry pipe (~300ft), Install tire water tank, and fence out spring source. The
proposed development would be on a small spring that feeds pass c
reek. This would reduce
grazing pressure in riparian area and distribute cattle away from pass creek. Plan to use
contractor for entire development.

Costs

Pre
-
site survey
-

$500

Water Permit
-

$100

Contract Costs
-

$9,500

Total


$
1
0
,
1
00




2.

Bayer Mountain
Pasture

Install a spring box, burry pipe (~300ft), Install tire water tank, and fence out spring sou
rce. This
would distribute cattle

into an under used area of the pasture and eliminate cattle disturbance
in the spring head. Plan to use contractor for ent
ire development.

Costs

Pre
-
site survey
-

$500

Water Permit
-

$100

Contract Costs
-

$9,500

Total


$
10
,
1
00


3.

Ed Young Pasture

Install a spring box, fence out spring source ,

burry pipe (~800ft), Install 2 tire water tanks that
will serve 2 pastures. This would distribute cattle into an under used area of one pasture and
eliminate cattle disturbance in the spring head in the other. Plan to use contractor for entire
development
.

Costs

Pre
-
site survey
-

$500

Water Permit
-

$100

Contractor Costs
-

$11,500

Total


$12
,1
00


4.

Riparian pasture

Install a new spring box, burry pipe up to an existing tank. This project would re
-
build some of
the infrastructure to an existing tank that is
no longer functioning. Plan to use a contractor.

Costs

Contractor Costs
-

$
2
,000

Total


$2,000


Total
Water Development

Costs
-

$
34,
3
00

Total Title II Funding request
-

$
16,250


Road and Trail Work

1.

Install Cattle Guard on Pass Creek

Install a 24’ cattle
guard across a main Forest Service road in conjunction with the pass creek
fence (above)

Cost

Contractor Costs
-

$7000

Total


$
7
,
0
00

2.

Riparian Pasture Cattle Guard

Clean out existing cattle guard.
On heavily used road/trail

Cost

Contractor Cost

-
$500

Total



$
500


3.

Bayer Mountain Cattle Guard

Reinstall in new location once the fence is moved.

Cost

Contractor Cost

-
$500

Total


$
500


4.

Maxom Basin Cattle Guard

Install a new cattle guard at the entrance to the Maxom

Basin pasture. This is a heavily
traveled trail and we have problems with people leaving the gate open, allowing our cattle
access to a riparian area.

Costs

Contractor Costs

-

$1,
5
00

Total


$
1,500


5.

Ed Young Culverts

Install culverts at 2 spring crossings

on heavily used trail.

Costs

Pre
-
Site Survey
-

$500

Contractor Cost
-

$3,000

Total


$
3,500


6.

Maxom Basin
Trail

Clear down timber from a historic stock drive way to allow for better cattle distribution and
wildlife movements. Plan to use
contract Labor.

Costs

Contract
Labor
-

$1000

Total
-

$1000


Total Road and Trail Costs
-

$14,000

Total Title II Funding Request
-

$6,750