Early Engagement Safety Case Submission Cover Sheet

sleepyeyeegyptianOil and Offshore

Nov 8, 2013 (3 years and 11 months ago)

77 views

Early Engagement Safety Case Submission

Cover S
heet

Revision:
2

Page
1

of
2


Reference: N
-
04050
-
FM0787

Revision Date:
29 December 2011




National Offshore Petroleu
m Safety and Environmental Management Authority


Part 1


Details of person

(or person’s agent)
making submission

(
OP
GGS(
S
)

Reg
2.50
)

Name:


Signature:


Position


Date:


Australian
Address:


Phone:

On behalf of:


(Name of

registered operator)

Part 2


Facility

Details

Facility

name:


Facility typ
e, please select one from the following:










Large Production Platform with
Drilling capability


Pipe
-
lay barge, construction

/

transport barge or
accommodation barge


Floating production
storage and offloading
facility

(inc FLNG)


Mobile Offshore
D
rilling U
nit or drill
-
ship

















Other production platform

with
accommodation facilities and
drilling

/

workover capability


Unmanned Monopod, well head
platform or other small production
facility with no accommodation


Floating storage un
it
linked to a production
platform


Facility Hub

(Facility Safety Case)

Pipeline Facility


















Part 3



Submi
ssion
Details

(Note

3)

(principal document only)

Document Title:


Document No:


Revision:


Issue Date:


Brief Descri
ption:


Part 4



Submi
ssion
Basis


(reason for

making this submission)




Submission Type:

Initial, Reg 2.24(1)
(note 1 & 2)

X



Phase in the life:

Operation of facility


Part 5
-

Items Considered for Completeness

Yes


1

Submission is being made b
y the operator for the facility

(or their agent)


2

There
is
a cover letter

seeking assessment

by NOPS
EM
A u
nder Reg 2.24(1)


3

1 paper copy of the submission is enclosed


4

1 electronic copy of the submission is enclosed
(Note 5)


5

The requirement for

an agreed scope of validation has been discussed with NOPS
EM
A
(Note 2)


6

Where required, a scope of Validation has been agreed with NOPS
EM
A
(Note 2)

N/A

7

A submission schedule, previously discussed with NOPS
EM
A, is enclosed specifying the documents to

be submitted
and an indicative timetable.


Part 6



Issue resolution


Issues with item(s)


were discussed with


on



list item No(s)


NOPSA contact


D
ate

Part 7



Acknowledgment


I acknowledge that:



this submission is voluntary and entirely at the d
iscretion of the operator;



the assessment of this submission, made at this point in the development’s lifecycle will, in all likelihood, result in a rej
ection decision
by NOPS
EM
A

unless withdrawn from assessment
;



the assessment of this submission in no way

precludes or obviates the need for future safety case submissions that will attract the
paym
ent of a safety case l
evy under the
Offshore Petroleum and Greenhouse Gas Storage (Safety Levies) Regulations 2009;



the assessment of this submission attracts fees

as provided for under regulation 36 of the

Offshore Petroleum and Greenhouse Gas
Storage (Safety Levies) Regulations 2009;



the fees will be c
harged on a cost recovery basis (a flat hourly rate established each financial year)
;



the fees will be billed at t
he end of each financial year quarter until such time as an assessment decision is reach
ed and communicated

to the operator or the operator

formally
withdraws the submission(s) from assessment
.

Name:


Signature:



Early Engagement
Safety Case Submission Cover Sheet


Revision:
1

Page
2

of
2


Reference: N
-
04050
-
FM0787

Revision Date:
29 December 2011




National Offshore Petroleum Safety and En
vironmental Management Authority


Instructions for use:

1

This form is i
ntend
ed

for use

by operators of facilities as a pre
-
submission check and cove
r page for

Safety Case submissions being
made directly to NOPS
EM
A.

2

Operators should complete Part
s 1, 2, & 3

and use Part 5

as a checklist to ensure all items have been addre
ss/included as part of the
submission.

3

For any item in Part 5

that is unable to be checked in the affirmative the operator should contact NOPS
EM
A and complete Part
6

4

The completed form should

be included with the safety case submission
.


Notes:

1

A
ll regulations quoted are from
the
Offshore Petroleum
and Greenhouse Gas Storage
(Safety) Regulations 2009

unless otherwise
stated.

2

Note that regulation

2.24
(5
)

provides for safety case submission prior to
agr
eement of a scope of

validation

3

Where mul
tiple documents are being submitted please ensure they are appropriately described in an accompanying cover letter

or in
the table below
.

4

Regulations identified in part 4

5

Single Adobe Acrobat file, fully searchable
, full size drawings

and unprotected
.


Details of additional documents

(forming part of the submission
, add/delete sections as required
)



Document Title:


Document No:


Revision:


Issue Date:


Brief Description:





Document Title:


Document No:


Revision:


Issue Date:


Brief Des
cription:





Document Title:


Document No:


Revision:


Issue Date:


Brief Description:





Document Title:


Document No:


Revision:


Issue Date:


Brief Description:





Document Title:


Document No:


Revision:


Issue Date:


Brief Description: