from here - Emirates Prefabricated & Steel building

siennatearfulUrban and Civil

Nov 25, 2013 (3 years and 10 months ago)

77 views

INTRODUCTION

INDUSTRIAL
PROJECTS


MILITARY
PROJECTS


RESIDENTIAL
PROJECTS


AWARDS


CONTACT US



Though

started

small

in

size,

however

it

is

vast

in

aspiration,

willingness

and

resolution

for

excellence

and

its

desire

to

take

honor

and

pride

in

participation

into

this

overall

construction

drive

of

the

United

Arab

Emirates
.



When

we

started

in

2003
,

we

were

aware

of

the

fact

that

the

emergence

of

a

new

contracting

company

into

this

market

congested

with

companies

operating

in

this

field

since

ages

is

an

adventure

that

was

never

taken

simple

with

a

mission

not

so

easy
.


To be the clients' first choice in turnkey solutions for
specialized and integrated construction requirements
across the GCC and Asia.


E
P
S

is dedicated to the delivery of world
-
class turnkey
solutions to our stakeholders in partnership with our
clients, consultants and the government. We achieve
this through adhering to the highest standards of
safety, quality and environmentally centric practices
while completing our projects on time and within
budget

Eng.
Mudhafar


Alwan

Wadi


Executive Chairman

Eng.
Muheeb


A.
Rishan


Managing Director

Eng. Jamal
Alwan


Wadi

Design
consaltant

&
production

Eng. Sara
Awad

Mohammed

Design

Eng
Nadhim

A.
Mudhen

Management

Administrators

Eng.
Saad

Alwan

Wadi

Production

Technicians

Workers

Eng. Khalid J S
Khalil

Steel Structure



E
P
S

Factory is an industrial
Limited Liability Company
associated with Sands
Consultant Engineers owned by
Tow owners



Owners:



1


Eng.
Mudhafar

A.
Wadi


2


Eng.
Muheeb

A.
Rishan
.



Our success can be attributed to our commitment to
maintain a harmonious and professional working
environment based on honesty, fair dealing and sound
business ethics. Our organization is strongly committed to
implementing policies and procedures that reflect a high
level of ethical business practices and client satisfaction.
We are committed to building excellence through
partnerships and we will continuously strengthen our
policies and practices to promote the interests of our
clients, partners, employees' community and the country
in which we operate.



We in all of our projects, we
have used modern methods
in construction that have
been used in U.S.A in
several styles and different
specifications.

INDUSTRIAL
PROJECTS




Al Dar Site
AlRaha

Beach, Abu Dhabi


1250 Caravans for 5000 Workers



Client : ALDAR


Contractor : ISCS Contracting


Cost : 6.543.000 Dhs.


Location : U.A.E
-

Abu Dhabi


year of completion : 2007









Parsens Camp




Client : Parsens Company


Contractor : EMEC Contracting


Cost : 23.855.000 Dhs.


Location : Iraq


Baigi


year of completion : 2006








Al Rumaila Oil Field




Client : China Petroleum
Engineering


Contractor : Al Rumaila Gate


Cost : 10.323.000 Dhs.


Location : Iraq


Basra


year of completion : 2011









BP Petroleum Project




Client : British Petroleum


Contractor : ALAMCO Contracting


Cost : 17.600.000 Dhs.


Location : Iraq


Basrah



year of completion : 2011








Construction Of Incinerator



Client :
Inglett

And Stubbs
Int.


Location :

Balad

/ Iraq


year of completion :Mar.2006


Nov.2006


Project Description:


Installation of 4 each incinerator units with mechanical and electrical infrastructure including power
supply and a warehouse.




Moonlight Warehouses




Client : Moonlight Company


Cost : 4.650.000 Dhs.


Location : U.A.E


Ajman


year of completion : 2008








Bin Ham Warehouses




Client : Bin Ham Company


Contractor : Over Seas Company


Cost : 3.670.000 Dhs.


Location : U.A.E
-

Abu Dhabi


year of completion : 2009









Bin Hafez Warehouses &


Camps



Client : Bin Hafez
Company


Contractor : Over Seas Company


Cost : 7.200.000 Dhs.


Location : U.A.E


Dubai


year of completion : 2006






MILITARY
PROJECTS




Directorate of Military
Works Projects



Clint : Directorate of
Military Works


Contractor : RECH Contracting


Cost : 2.375.000 Dhs.


Location : U.A.E


Abu Dhabi


year of completion : 2011








Police Academy Project



Clint : Ministry of the
Interior


Contractor : ALAMCO Contracting


Cost : 34.130.000 Dhs.


Location : Iraq


Baghdad


year of completion : 2004









U.S Army Camps



Client : U.S Army


Cost : 64.225.000 Dhs.


Location : Iraq


Salah Al Deen


year of completion : 2010








U.S Army Camps









Design And Construct
Fyos

Dining Facility



Client : Kellogg Brown &
Root


Location : Camp Delta / Iraq


year of completion :Oct. 2009


Dec. 2009






Project Description:


The Project consists of design and construction of a Dining Facility at Forwarding Operating
Base (FOB) Delta to support military operations. Anti
-
terrorism measures are included. The
Facility is approximately 60.000SF. The Dining facility has the ability to serve 5900
personnel per meal. All furnishings and kitchen equipments are provided and installed. The
Facility also includes all supporting facility requirements such as power production and
distribution requirements, water and sewage distribution systems, mechanical systems and
other supporting facility features such as roads, curbs, walkways, parking pavement,
walkways and site drainage. The building has an integral protective roof system that
includes, a two layer protective roof system consisting of pre
-
detonation layer 100MM
insulated steel panels supported on steel framing. The fragmentation roof is a 150MM
composite steel/concrete roof deck with the steel decking of 16 gage minimum.



Design And Construct Convoy
Support Center, Phase I And
Phase II


Client : Kellogg Brown &
Root


Location :
Tallil

Air Base / Iraq


year of completion :Nov. 2009






Project Description:


Project Consists of the design and construction of the Convoy Support Center which is 1.5 km square with pre
-
engineered
metal or modular facilities.


The work includes the preparation of design documents and construction of a fully functional facility providing, all lab
or,
materials and equipments.


This Project also consists of completion of the design and construction of a 12MW (megawatt) diesel
-
fired Power Plant an
d
connection to associated utilities. This includes preparation of all design documents for mechanical systems at the Power
Plant.


Preparation of design documents for and construction of the site 11 KV (Kilovolt) primary power distribution system
around the Convoy Support Center (CSC) and 400/230 V secondary electric power services to facilities as required.


Preparation of design documents for and construction of two new Reverse Osmosis Water Purification Units (ROWPUs)
along with all associated tanks, pumps, power supply, piping and chemical storage at the existing water supply point at
COB Adder.


Preparation of design documents for and construction of a wastewater collection system including piping and holding
tanks at the CSC site.


Preparation of design documents for, and paving of existing roadways.




Joint Distribution Center/Central
Distribution Center (
Jdc
/
Cdc

)
Yard


Client :
Inglett

And


Stubbs Int.


Location :
Balad

/ Iraq


year of completion :Jan. 2007


Jan. 2008






Project Description:


The Project has consisted of design and build of three facilities totaling 32640 SM and configured for dry
storage functions, warehouse functions at Camp Anaconda
Balad
/ Iraq; Class 1 facility configured for dry
storage functions at 14400 SM.


Multiclass facility has configured for warehouse functions at 9120 SM. Also FRP facility has configured for
maintenance functions at 9120 SM. The supporting facilities have included a pump house for sprinkler system,
generator sunshades, site grading, storm drainage, utility connections to suit the various mission requirements
at Camp Anaconda Bald in Iraq.


Thermal insulation of facilities has been provided by polyurethane foamed galvanized metal size and roofing
panels. Regular type, wet type and fire rated gypsum partition boards have been used in facilities to separate
the interior spaces. Doors have been selected in accordance with Anti
-
Terrorism Force Protection standards.
Buildings have been supported with sprinkler system, fire detection systems.



Power Plant



Client : Kellogg Brown &
Root


Location :Camp
Speicher

/
Tikrit

/ Iraq


year of completion :2004
-

2005






Project Description
:


11kv 18 MVA Power plant and 11
kv

Power Grid system and 17 EA 11/0.4
kv

Secondary Substations at
Tikrit
, Iraq.


This system has included Bea 11kv, 2275 MVA Diesel generators, 3ea 11kv
Busbar

system, Master synchronization
panel
-
technical description of control and monitoring of generators and load bus control panel. 11/0.4
kv

Mobile
Type Secondary Substations have included 630 A RMU, 630 and 1000
Kva

Transformers and LV panels.


Also outdoor x indoor electrical systems and automatic control system for buildings, warehouses, oil pump
stations have provided and installed by EPS Co.


This Project design, installation, test and commissioning of MV Power Plant, 11
kv

Grid System and 141/0.4
kv

Secondary Substations has been done per the international Codes.



Combat Aviation Brigade
Beddown

Airfield Pavement



Client : KBR / US Corps Of
Engineers


Location :

Tallil

Air Base / Iraq


year of completion :Oct. 2008


Nov. 2009




Project Description:


The Project consists of designing and construction of Armed
Helo

Apron, Un
-
Armed
Helo

Apron, ISR Airlift Ramp
and an Air Traffic Control Tower at
Tallil

Air Base, (Approximately 280.000
sqm

concrete pavement area). The
airfield pavements have edge lighting and flood lighting. The airfield pavement design and construction scope
includes but not limited to all required site work, paving or surfacing, supporting utilities/infrastructure,
signage, paint / markings, lighting and security necessary to make them complete and usable. The Air Traffic
Control Tower design and construction scope includes but not limited to the Air Traffic Control Reinforced
Concrete Tower, site work, utilities / infrastructure, fire protection / suppression, fire
pumphouse
,
communications infrastructure, Access roads/ routes / parking, and force protection / security to make it
complete and usable facility.


Materials was Purchased from Turkey and USA as well as locally.



KBR Man Cap, 800 Living
Container



Client : Kellogg Brown &
Roof


Location :

Lsa
, Anaconda / Iraq


year of completion :July. 2005


July. 2006


Project Description:


The Project consist of Design and Construction of the site associated with utilities to support 800
trailers (3x10 m), trailer fabrication, transportation, foundations,
placemet
, HVAC system and utility
connections of 1.600 person capacity billeting trailers to suit the various mission requirements at LSA
Anaconda /
Balad

in IRAQ.


The work in this contract includes the preparation of Design documents and the construction required
to provide fully functional facilities with force protection measures.



Life Support Operations And
Maintenace



Client : Kellogg Brown &
Roof


Location :

Lsa
, Anaconda / Iraq


year of completion :2004


2007


Project Description:


Work consist of construction of establishing a Labor Camp for 2.500 personals and serving to 25.000
people in the areas of Construction, Infrastructure, Catering, Laundry Service, Grounds Keeping,
Cleaning, Custodial and janitorial Services and electromechanical maintenance and vehicle
maintenance.


Man camp includes; Dormitories, Dining Facility, Morale, welfare and recreation centers, Canteen,
Shopping Center, Laundry, Showers & Latrine areas, GYM, Power Plant, Waste water system,
Portable water system, Call Shop, Medical Clinic, HVAC System, Security, Utilities and IT System.



53 Each Building Renovation
Projects



Client : Kellogg Brown &
Roof


Location :

Balad

/ Iraq


year of completion :Sep. 2004


Nov. 2006


Project Description:


Scope of work includes the renovation of 53 each buildings with total built up area of around 40,000
square meters. Electrical, Mechanical and architectural renovation of these buildings have been
done in the required US. Building codes and standards. All electrical and mechanical infrastructure
renovation have also been done by EPS Co.



Construction Of Fitness And
Community Center



Client : Kellogg Brown &
Roof


Location :

Balad

/ Iraq


year of completion :Mar. 2004


Apr. 2005


Project Description:


Two each steel structure buildings with total built up area of 20,000 square meters. Scope of work
includes civil works, structural works. Provision and installation of force protection measures such as
concrete barriers and provision and installation of all furniture’s and equipments have also been
done by EPS Co.



Construction Of
Ssa


Warehouses



Client : Kellogg Brown &
Roof


Location :

Balad

/ Iraq


year of completion :June. 2004


May. 2005


Project Description:


3 each steel structure buildings with total built up area of 30,000 square meters. Scope of
work includes civil works, provision and installation of prefabricated steel structure and wall
claddings, electrical works, HVAC, Provision and installation of all electrical and mechanical
infrastructure including power generators. Force protection measures such as concrete
barriers which surround the buildings have also been provided and installed by EPS Co.



Construction US Army
Headquarters



Client : US Army


Location :

Balad

/ Iraq


year of completion :June. 2004


Feb. 2005


Project Description:


Construction of US Army Headquarters Building. Scope of work includes all disciplines of
construction, including provision and installation of generator sets, landscaping and force
protection measures such as shielded slab and walls.

RESIDENTIAL
PROJECTS




Birecik

Dam &
Hepp

Turn
-
key
Operators Village Cons


(Subcontract)


Client :
Holzmann
-
gama
-
strabay

JV


Location :

Birecik

/ Turkey


year of completion :2003


2004


Project Description:



The work consisted of constructing an integral site for the operators of the hydroelectric dam on the
Firat

River. Everything
started from scratch to the completion of a small town. The basic designs were done by joint venture designers.


But the actual distribution of the housing and other common buildings were done by our design proposals and the design
office collaboration.


A
-

The work included bachelor housings, flats, family housings (single and double), restaurants, club
-
house, school,
gymnasium, church, gas station, entrance building, social building, administration building, tennis courts, swimming pool,
toddler’s pool, saunas, and shopping mall.


B
-

The work included the site arrangement, landscaping, roads, walkways, street lighting, TV distribution system, telephone
distribution system, high medium and low voltage electrical distribution, drainage systems, drainage channels, raw water
collection for the dam, raw water distribution, waste water collection, fire water distribution, raw water header tank,
portable water header tank and distribution, fire hydrants, retaining walls, pergolas, waste water treatment and pumping
station, water. Treatment plant and pumping station, sub
-
transformers, chiller rooms.





Complex of Villas


( low cost )



Client : Private Office of His
Highness Sheikh Saif bin Zayed Al
Nahyan


Cost : 3.100.000 Dhs.


Location : U.A.E


Al Ain


year of completion :


Under construction







Sheikh Khalifa Bin Zayed Al
Nahyan Masjed Site office



Client : Department of
Presidential Affairs


Contractor : Unisons Company


Cost : 5.800.000 Dhs.


Location : AL Ain
-

U.A.E


Area : 2600 Sq/m


year of completion : 2011







Sheikh Khalifa Bin Zayed Al
Nahyan Masjed Site office








ISMAIL HAKKI TONGEC


SWIMMING POOL




Client : Carrefour Sa
.


Location :

Ankara / Turkey


year of completion :Dec 2004




Project Description:


Design and build of a semi Olympic indoor pool with all auxiliary and administrative buildings.




Car Shed





AWARDS




Car Shed







Car Shed






U
.
A
.
E



Abu

Dhabi

Office


Hamdan

Bin

Mohamed

St
.


Mob

:

+
971

552219581


E
-
mail

:


muheeb
.
ahmed@yahoo
.
com



U
.
A
.
E



Ajman

Office


Sheikh

Khalifa

St
.


Emirates Islamic Bank Building


Fl.№:1005


Tele

:

+
971

6

7466033


Fax

:

+
971

6

7466013


Mob

:

+
971

509571123


P
.
O
.

Box

:

13390

Ajman


E
-
mail

:


emi
.
modafer@yahoo
.
com




Factory
:

Ajman

new

industrial

plant


Mob

:

+
971

504536974


E
-
mail

:


e
mirates_cabin
@
yahoo
.
com



Iraq

Office



Basrah


Mob

:

+
964

7804802099


E
-
mail

:


emirates_cabin@yahoo
.
com


CONTACT US