3.1.1

Progress made during the reporting period towards the objectives of
the work package and details for each task

[Pro
vide a summary of progress towards objectives and details for each task
, using the tables
below.
]


3.1.1
-
1 Summary of progress towards objectives

Table 3.
1
.
1
-
1

Progress made

during the reporting period

towards objectives

OBJECTIVES OF WP
27

(FROM ANNEX I)

P
ROGRESS MADE DURING THE
REPORTING PERIOD

In the ALICE spectrometer, in order to
expand the physics capabilities of EMCal
by enabling back
-
to
-
back correlation
measurements, a large acceptance
Electromagnetic Calorimeter positioned
opposite to and down EMCa
l (DCal) is
under study.



Thus the aim of the proposed JRA is to
perform an extensive study of jet
quenching in heavy ion collisions by:


• a combination of inclusive and correlation
measurements enabled by large acceptance
Electromagnetic Calorimeters
EMCal and
DCal;


• a synergy of technological and conceptual
innovations for jet trigger and jet
reconstruction;


• a new theoretical formalism and Monte

Carlo modelization for the jet quenching.


3.1.1
-
2

Details of progress for each task

Table 3.
1
.
1
-
2

Progress made

during the reporting period
for

each task

TASKS OF WP
27

(FROM ANNEX I)

DETAILS OF PROGRESS MADE
DURING THE REPORTING PERIOD

1. Trigger development


1.1

Optimization of the new clustering
algorithms for High Level Trigger using
p
-
p collisi
ons


1.2

High Level Trigger development for
correlation measurements in heavy ion
collisions


2. Theoretical model developments and
modelization in Monte Carlo


2.1

Hadronization effects in jets


2.2

Medium
-
modified color reconnections



2.3

Incl
usion of elastic scattering


2.4

Role of the ordering variables


3. Di
-
jets and

-
jets reconstruction in heavy
ion collisions


3.1

Study of the combination (reconstruction
algorithms

+ subtraction
algorithms
) for
DCal+EMCal


3.2

Jets induced by light and heavy partons


3.3

Background subtraction out of the
Fragmentation Function
s


3.4

Comparison of reconstructed jet and

-
energy for

-
jet process.


3.5

Study of hadrochemical composition of
jet and di
-
jet events and resonance in jet
in heavy ion collisions


3.6


First tests in Pb
-
Pb collisions at high
luminosity



3.1.
2

High
lights of significant results

[Highlight clearly significant results.]


3.1.3

Use of resources

3.1.3
-
1
Use of financial resources

[
Provide
a statement on the use of
financial
resources
.]



3.1.3
-
2 Use of h
uman resources
1

[Indicate ONLY the total estimated
human effort involved in the WP during the reporting period (i.e.,
with reference to the table of Annex I, reported below, only
the number
s

within the parenthes
e
s). The
number
s

outside the parenthes
e
s will be provided directly by the administrations.]

Tabl
e 3.
1
.
3
-
1

Use of human
resources

during the reporting period

Work package number

WP27

Start date

01/01/2012

Activity Type

RTD

Work package acronym

Di
-
JETCAL

Work package title

A Di
-
Jet Electromagnetic Calorimeter for Jet Quencing Study





Beneficiary

number

Organization legal
name

(in italics the
Research Units)

Short name

Human effort

from Annex I


(person
-
months)

Actual
human effort
in the
reporting
period
(person
-
months)

1

Istituto Nazionale di
Fisica Nucleare

INFN

12,5

(
110
)



INFN Laboratori
N
azionali di Frascati

INFN
-
LNF

10,5

(
80
)



INFN Sezione di
Catania

INFN
-
CT

2

(
30
)


27

Universidade de
Santiago de
Compostela

USC

3

(
45
)





1


The numbers provided
in the table
indicate the human effort in person
-
months (project: to be justified to the EC).


The numbers in brackets indicate the total estimated human effort involved in the WP (project + extra home
contribution).


If no number is given outside the brackets, the Beneficiary/Research Unit is not receiving EC funds in the WP.

31

Centre National de la
Recherche
Scientifique (CNRS)

CNRS

9

(
19
)



Institut
Pluridisciplinaire
Hubert Curien,
Str
asbourg

CNRS/IN2P3/IPHC

4

(
4
)



Laboratoire de
Physique
Subatomique et des
Technologies
Associées, Nantes

CNRS/IN2P3/SUBATECH

5

(
15
)



3.1.3
-
3 Use of other resources

[Indicate other resources (not financial nor human
)

used during the reporting period
, if

any.

S
uch as
:

beam test facilities, CAD layout
s
, test laboratories, data storage tools, supercomputers, etc.]



3.1.4

Deviations from Annex I

3.1.4
-
1 Deviations from planned objectives and tasks, and their impact on the
progress of the work package

[If a
pplicable, explain the reasons for deviations from Annex I and their impact on other tasks as
well as on available resources and planning.

If applicable, explain the reasons for failing to achieve critical objectives and/or not being on
schedule and explai
n the impact on other tasks as well as on available resources and planning
(the explanations should be coherent with the declaration by the project coordinator).

If applicable, propose corrective actions.]


3.1.4
-
2 Deviations between actual and planned per
son months

[Explain deviations between actual and planned person
-
months. If applicable, propose
corrective actions.]




4
.

DELIVERABLES AND MIL
ESTONES TABLES

4.1

Deliverables

[
Please list all the deliverables due in this reporting period, as indicated in
Annex I.

Deliverables must

also be accompanied by a short report

(deliverable description and technical documentation, such as photo, list of
publications, etc.)
, so that the European Commission has a record of their existence. If a deliverable has been ca
ncelled or regrouped with
another one, please indicate this in the column "Comments". If a new deliverable is proposed, please indicate this in the col
umn "Comments".

You find in chapter 4.3 the “
Deliverable Report
” which must be completed per EACH deliver
able indicated in Table 4.1.
]

Table
4.1

List of deliverables

Deliverable
No.

Deliverable name

WP
No.

Lead
Beneficiary

Nature

Dissemination
level

Delivery
month from
Annex I

Delivered

(yes/no)

Actual
delivery
month

Comments






















































4.2

Milestones

[
Please complete the table if milestones are specified in Annex I.

If a
milestone

has been cancelled or regrouped with another one, please indicate this in the column "Comments". If a new
milestone

is proposed,
ple
ase indicate this in the column "Comments".


Milestones will be assessed against specific criteria and performance indicators as defined in Annex I.
]

Table
4.2

List of milestones

Milestone
number

Milestone name

WP
number

Lead
beneficiary

Delivery
month
fro
m Annex I

Delivered

(yes/no)

Actual delivery
month

Comments




















4.3

Deliverable Report
s

[
Please provide, per

EACH deliverable listed in Table 4.1, a brief description, including if possible
some technical documentation (photos, list of publications, etc). Deliverables without a
“Deliverable Report” will be rejected by the Commission. Use as many pages as needed
per EACH
report.
]


WP27: Di
-
JETCAL
-

A Di
-
Jet Electromagnetic Calorimeter for Jet Quencing
Study

Deliverable name:


Deliverable No.: