BASIC FINISHING STANDARD
DOM 100
in Zielonki

I. OPEN SHELL OF A BUILDING

1.

Foundations


reinforced concrete

2.

Foundation walls


concrete with waterproof insulation and thermal insulation (extruded Styrofoam)

3.

Bearing walls


ceramic 25 cm Porotherm

4.

Part
ition walls
-

ceramic, optionally: Ytong

5.

Multi
-
beam floors type Rector or reinforced concrete, beams, lintels, inside stairs


reinforced concrete
-

monolith

6.

Ventilation shafts


masonry, prefabricated modular units
-

Schiedel system ('external air duct’)

7.

Smoke chimneys


masonry, prefabricated modular units with ceramic pipe inside
-

Schiedel system

8.

Flue chimneys


masonry, prefabricated modular units with ceramic pipe inside
-

Schiedel system

9.

Roof structure


wooden rafters impregnated with fire resistan
t and pest resistant chemicals
-

Fobos products

10.

Roof covering


concrete roof tile, dark colours

II. INTERIOR FINISHING STANDARD

1.

Electrical installation


execution of a power connection, providing wiring from the distribution board to the wall
sockets
and switches (with assembly of fittings / fixtures): (fig.)

a.

Lighting
-

19 points

b.

Switches
-

15 points

c.

Sockets
-

20 points

d.

Power socket
-

2 points

2.

Water and sewerage installation


connections to the municipal network, installing water and sewerage pipes t
o the
water draw
-
off points (no fixtures) : (fig.)

a.

Cold water (WC+ WC + tap + washing machine)
-

4 points.

b.

Cold
-
hot water (bidet, shower, tub, wash
-
bowl, sink)
-

5 points

3.

Gas installation


municipal gas supply from the existing municipal network


read
y for the installation of draw
-
off
devices:

a.

Boiler (double function Vaillant boiler)
-
1 point

4.

CH installation and boiler room


powered by gas heated boiler, double function for CH and HW, to the draw
-
off
points


heaters / radiators (fig.)

a.

Convection /
slab heaters
-

9 units

b.

bathroom heaters
-

2 units

5.

Low voltage power installations


wiring required for the installation of: (fig.)

a.

telephone / Internet
-

2 points

b.

TV / Internet
-

1 point

c.

Interphone
-

1 point

6.

Inside wall plastering


gypsum

7.

Thermal in
sulation of the sloped ceilings of the lofts


mineral wool insulation 15 cm + 5 cm together with steam
insulation and carton board facing

8.

System stairs leading to the attic

9.

Cast floors


reinforced concrete sealable grid with thermal insulation (Styrofoa
m EPS 100)








BASIC FINISHING STANDARD
DOM 100
in Zielonki

III. OUTSIDE FINISHING STANDARD

1.

Wooden joinery


wooden windows


SOSNA ‘Mikro
-
wczepy’ (manufacturer Excellent


PINE Micro
-
anchoring,
integrated glazing with the k=1,1 W/m2*K, P2, fixtures
Wk1)

2.

Skylights
-

FAKRO windows with the U index of the glass pane = 1,1 W/m2*K

3.

External doors


thermal insulation, anti
-
burglary

4.

Chimneys


above the roof, tile facing

5.

Roof gutters and rain water pipes
-

PVC

6.

Roof


concrete tiles, dark colours

7.

Roof
fittings


coated sheet

8.

Façade


thin coat acrylic plaster put on a layer of reinforced glue, thermal insulation 12 cm Styrofoam EPS 70, in
compliance with the visualisation (ecru + brown)

9.

Roof filling


wooden facing with visible wooden elements of the r
oof structure, painted with brown varnish

10.

Building socle


Gres ceramic tiles

11.

Outside windowsills


coated sheet

12.

Land parcel fencing


wire net on posts

13.

Development of the area

access areas from open
-
work tiles, levelled soil in the gardens

14.

Balcony wi
ndows guards


stainless steel

15.

Dehydration of the parcel dehydration to a sink basin

16.

Connections


water and sewerage, gas, electricity


IV. COMMON PARTS OF THE SETTLEMENT

1.

Access road to the houses hardened, covered with broken stone, colour: grey, granul
ation: 12
-
16

2.

Decorative fencing of the front side ul. Szkolna

ul. Kwiatów Polnych

3.

Outside gate


automatic, integrated with the fence, operated by remote control

4.

Lighting of the access road


lamps 1,20m


The parties agree that the Purchaser shall report

any modifications


which do not require an amendment of the
building permit nor a change of the functions of the rooms / spaces


at the latest by (date) ..... ,