Running with Technology

MGD
Services
, Inc
.

Quality Assurance



An Integral Part of Software
Systems Development Life Cycle

by

MGD

Services, Inc.



The QA Philosophy

The inherent philosophy of Quality
Assurance for software systems
development is to ensure the system
meets or exceeds the agreed upon
requirements of the end
-
users; thus
creating a high
-
quality, fully
-
functional
and user
-
friendly application

Quality Assurance


Is More Than Just Testing


Quality Assurance is involved in the entire
project development life cycle


Quality Assurance is a commitment by all
project participants to the
Total Quality

of the
Project

0

5

10

15

20

25

30

Development Life Cycle

% Defects Removed

Target

Project
Data

by focusing

here

Requirements

High Level

Design

Low Level

Design

Code

Development

Unit Test

Function

Test

System

Integration


Test

Relative Cost

Of Defect Repair
-

$1 $100


$1000+

Quality Assurance Focus Early In Life Cycle

The objective
is to


“buy” time and
reduce costs
by finding
problems
earlier

No machine
-
based testing performed

Machine
-
based testing performed

Quality

Assurance Regression

Test

The QA Process Cycle


Phase I:

Requirements Gathering,
Documentation and Agreement



Phase II:

Establishing Project
Standards



Phase III:

Test Planning



Phase IV:

Test Case Development



Phase V:

QA Testing



Phase VI:

User Acceptance Testing



Phase VII:

System Validation

Phase I:



Requirements and Project Scope


The system requirements are collected
and analyzed based on input and direction
from each of the project groups


The requirements documents are drafted,
reviewed, finalized and agreed upon by all
project participants


The scope of the project is established
and agreed upon


Phase II:



Establishing Project Standards


The QA team will assist in establishing
and setting the standards for the project


The standards will be established for:



Development Methodology



System Design



Quality Assurance Methodology



Methodology Compliance


Phase III:

Test Planning

The
Quality Assurance

Team will:



Write the Test Plans which detail the QA
involvement for the entire project life cycle



Develop test conditions based on the
business needs and business scenarios



Implement a defect
-
tracking mechanism







Phase III
(con’t):



QA Methodology


The QA team will establish Quality
Assurance methods, practices and
standards


The overall QA methodology will assist
in creating a controlled product release
and greatly reduce the risk of errors
being introduced into the product

Phase IV:

Developing Test Cases


Write test cases that entirely test the
scenarios covered in the test conditions



Review the test conditions and
subsequent test cases with the project
users



Write test cases that will cover all
phases of the QA life cycle

Phase V:

QA Testing


QA Life Cycle consists of 5 types of

testing regimens:

1. Unit Testing

2. Functional Testing

3. System Integration Testing

4. Regression Testing

5. User Acceptance Testing

1.

Unit Testing

The testing, by development, of the
application modules to verify each unit
(module) itself meets the accepted user
requirements and design and
development standards

2.

Functional Testing

The testing of all the application’s
modules individually to ensure the
modules, as released from development
to QA, work together as designed and
meet the accepted user requirements
and system standards

3.

System Integration
Testing

Testing of all of the application modules in
the same environment, database
instance, network and inter
-
related
applications, as it would function in
production. This includes security,
volume and stress testing

4.

Regression Testing

This is the testing of each of the
application’s system builds to confirm
that all aspects of a system remain
functionally correct after program
modifications. Using automated
regression testing tools is the preferred
method


Testing Automation

MGD

Services, Inc.

Partners with the following
Automated Testing Tools Companies



Mercury Interactive






http://www.mercury.com





Compuware







http://www.compuware.com/solutions/3592_ENG_HTML.htm

Phase VI:

User Acceptance Testing

(UAT)


The testing of the entire application by the
end
-
users ensuring the application
functions as set forth in the system
requirements documents and that the
system meets the business needs

Phase VII:

Validation

All

systems

should

go

through

a

validation

process

which

maintains

the

project

documentation

library


Validation Documentation

All software systems that are developed
or used for FDA submissions are
subject to review by the FDA. All
phases of the Project Life Cycle are
required to maintain FDA validation
documents. MGD Services is
experienced in FDA

Validation and 21
CFR Part 11.

Staffing

The Staffing Requirements For The QA Functions:




QA Manager



Business Analyst



Quality Assurance Analyst



Technical Writer



Instructional Designer/System Trainer


QA Manager


Established and implements the QA
Methodology for project Total Quality



Acts as the project lead liaison between
all project areas to ensure all areas are
completely and correctly engaged



Oversees the entire QA Life Cycle and
QA staff



Business Analyst


Writes the User Requirements and
Functional Specs and assists in writing
the system documentation


Acts as a liaison between the QA Team
and the other project team members



Assists in the QA test conditions
development


Quality Assurance Analyst


Develops test conditions


Writes test cases


Performs Functional, Regression, and
System Integration Testing


Assists in development of user guides and
training manuals


Assists or performs the System Training

Technical Writer


Assists in writing the user and system
documentation


Maintains validation documentation



Writes on
-
line help


Writes the User Guide and Training
Manuals

Instructional Designer/

Systems Trainer


Assists in writing the user guides and
training manuals



Trains users on production system



Subject Matter Expert on Adult Learning
Theories and learning assessment

In Closing...


QA’s involvement must be from the beginning to
the end of the project life cycle. Properly
managed, the QA process will bring the system
to production with cost and time savings.






P:

877
-
MGD
-
TEST

Web:

mgdservices.com

E
-
Mail:

mgdservices@tellurian.net