Cofferdam Removal of the Second Powerhouse of Abbaspour Dam

lifegunbarrelcityUrban and Civil

Nov 26, 2013 (3 years and 11 months ago)

74 views


Cofferdam Removal

of the Second Powerhouse of Abbaspour Dam



M.Moradi (Manager Deputy

JAHAD TOSSE MANABE AB

Co.
)

A.P.Ruhi (Technical Office Expert

JAHAD TOSSE MANABE AB

Co.
)



Abstract

The

s
econd
p
owerhouse of Abbaspour
d
am has been constructed with an i
nstalled
capacity of 1000 MW.

Two

conic shaped

concrete cofferdams
were

constructed to
prevent water
flowing into

the powerhouse

during construction period
.

Each
cofferdam had

20 rings.

A
fter

the
construction of

the

powerhouse was completed, two
sequential

methods were

finally

used to
remove

the cofferdams:

Demolishing

by
dynamite explosion in each cofferdam ring, 60 holes were hollowed out.
After
explosion

the concrete
was

removed easily by hand tools.

To
control hurled materials
arising from explosion, a
platform was built around the cofferdams
and

the
platform

was cleaned by use of a tower

cr
a
n
e
.


Removing the cofferdam by using

a barge
, on which a beam is placed. When the
barge
was

rested on the cofferdam, the tanks
were

filled with water
and

the barge
s
ank
blow

the surface of the water. After that the beam fixed to the con
crete ring by using
three jaws. T
he

fixed concrete ring c
ould

easily be removed by only letting the water
out of the tanks. The barge
rises

now to a higher level and separates the ring
from the
cofferdam. Finally a tugboat is used for
taking

the barge to the
upstream of the
reservoir
to unload the rings.