SHORT TENDER NOTICE



No: BFU/CON/
MM
/0
2
/
81











Date:
29/12/2011

Sealed tenders are invited from the experienced Contractors who have carried out similar
type of work for the below mentioned work at BFU, KIOCL Limited Panambur, Mangalore
-
575010 Dakshina Kannada District, Karnataka State. Tenders will be received up to
3:00 PM

on the date indicated below and opened in the presence of the
t
enderers who wish to be
present on the same day in the office of the undersigned.


The contractors have to submit
Technical Bid
in one sealed cover and
Price Bid
in another
sealed cov
er. Tender papers can be had from the office of the undersigned on all working days
during the office hours till
3.00 PM on
02.02.2012

on payment of
`
. 100.00
per set

(inclusive
of Sales Tax)

in the form of Demand Draft drawn in favour

of BFU, KIOCL Limited. Panambur,
Mangalore. The tender documents downloaded from our above Website should be
accompanied by a Demand Draft for
`
.
100.00

(including Sales Tax) towards documents fee
drawn in favour of BFU, KIOCL Limited. Panambur, Mangalore

while submitting the tender.


Note:

SSI Units registered with NSIC under single point Registration Scheme giving
documentary evidences will be exempted from EMD for participating in the tender.


Name of the work

EMD

(
Rs.
)

Duration of
contract

Last date
for
submission of tenders

Strengthening of Structures in
Blast Furnace, Dust Catcher,
GCP, Stoves, PCM and other

areas

of BF Complex.

*6000.00

Five Month

03.02.2012

(
*
`
.5000.00 for registered contractors with the company)








Sd
-




Deputy General Manager (Contracts)



Page 1 of 1
4








KIOCL LIMITED

(A Government of India Enterprise)

AN ISO 9001:,

ISO 14001:, OHSAS 18001: COMPANY

BLAST FURNACE UNIT

PANAMBUR, MANGALORE
-

10.


No: BFU/CON/
MM
/0
2
/
81










Date:

29/12/2011



To,


Dear Sir,


Sub:

Strengthening of Structures in Blast Furnace, Dust Catcher, GCP, Stoves, PCM and


other

areas
of BF Complex.


1.

Please find enclosed herewith the tender documents for (i) Technical Bid
-

comprising
of Invitation to
bid
, proforma for technical evaluation of bidders, Instructions to
bidders
,
T
erms &
C
onditions, Special
C
onditions,
Technical Specifications
and Price
bid

Schedule of quantities (Unpriced format) (ii) Price Bid
-
comprising of Schedule of
quantities.


2.

The Price Bids of technically qualified bidders shall be opened and others shall be
rejected. Decision of B
FU, KIOCL Limited on Technical evaluation shall be final and no
correspondence shall be entertained in this regard.

TECHNICAL BID INDEX

Sl.
No.

Particulars

Page No.

1.

Invitation to
bid
, proforma for technical evaluation
of bidders, Instruction to
bidders
, terms &
conditions,
Technical Specifications &
Special
conditions and Price bid
-

Schedule of quantities (un
priced format)

3
-
13

PRICE BID INDEX

Sl.
No.

Particulars

Page No.

1.

Price bid
-

Schedule of quantities.

14




Thanking you,

Yours faithfully,


For KIOCL LIMITED

Blast Furnace Unit


Sd
-

Deputy General Manager (Contracts)

Encl: As Above.

Page 2 of 1
4





KIOCL LIMITED

(A Government of India Enterprise
)

BLAST FURNACE UNIT

PANAMBUR, MANGALORE
-

10.


INVITATION TO BID

No: BFU/CON/
MM
/0
2
/
81












Date:
29/12/2011

Sub:
Strengthening of Structures in Blast Furnace, Dust Catcher, GCP, Stoves, PCM and


other
areas
of BF Complex.

1.

Bid document for the above work are enclosed herewith.

2.

Bidders shall abide
by all the details of “Instruction to Bidders” enclosed with the tender
documents. The sealed bids shall be submitted in the manner as mentioned below:

a.

First envelope shall contain the technical and commercial portions of the offer and shall be super
scrib
ed as “UNPRICED”
-

“Strengthening of Structures in Blast Furnace, Dust Catcher, GCP,
Stoves, PCM and other
areas
of BF Complex”
.
Containing one full set of all tender documents
including all the annexure duly filled
-
in and signed with official seal on all
pages but without any
mention of rates and prices
-
Technical Bid.

b.

Second sealed envelope super scribed “EMD”
-


Strengthening of Structures in Blast Furnace,
Dust Catcher, GCP, Stoves, PCM and other

areas

of BF Complex
.”

Shall contain Demand
Draft/Bank
Guarantee towards Earnest Money Deposit.

c.

Third sealed envelope super scribed as “PRICED”
-


Strengthening of Structures in Blast
Furnace, Dust Catcher, GCP, Stoves, PCM and other
areas
of BF Complex
”. Containing
schedule of units, quantities and prices of t
he tender document with all the rates, prices etc. duly
signed with official seal on all pages
-
“Price Bid”.

d.


Tenderer shall strictly submit the offer in the way as mentioned above. Sealed bids with the
above markings and marked “Confidential” shall be addr
essed to DGM (Contracts), BF Unit,
KIOCL Limited, Panambur, Mangalore
-
10, should be dropped in the tender box which is kept in
the first floor of the Administration Building, BF Unit, KIOCL Limited, Mangalore up to
3.00 PM

on
03.02.2012.

3.

Tenders sealed

and super
-
scribed as above may be sent by courier / registered post addressed
the above mentioned officer. Tender received after the time and date specified above, shall be
rejected.

4.

The Bid will be opened at
3.30 PM on
03.02.2012

in front of the bidders

who wish to be present.
Price Bid will be opened subsequent to technical assessment.

5.


Tenderers shall abide by all the details as per enclosed documents.

6.

The time of completion of all works under this contract shall be

Six

Month

from
date of start of
w
ork

excluding mansoon period
.

7.

The successful Tenderer shall be required to execute an agreement within the time specified in
the letter of intent. The Company reserves the right to reject the tender without assigning any
reason.

8.

The Tender shall be accom
panied by an Earnest Money Deposit *(EMD) of
Rs. 6000.00 (
Rupees
Six
thousand

only)

to be deposited only in the form of a Demand Draft from a Scheduled Bank
drawn in favour of BFU, KIOCL Limited , , Panambur, Mangalore. The EMD shall be returned to
unsuc
cessful Bidders within 28 days after deciding the successful Bidder and in case of successful
Bidder, the same shall be returned after submission and acceptance of the Security Deposit for
this work referred to in Article No. 37 of “General Conditions of C
ontract”. (Rs.
*5000.00

for
Registered contractors with the company

(

9.

SSI Units registered with NSIC under single point Registration Scheme giving documentary
evidences will be exempted from EMD for participating in the tender.

10.

Apart from
EMD

a fee of
Rs
.
100/
-

in the form of DD drawn in favour of BF Unit, KIOCL Limited,
Panambur, and Mangalore
-
10 towards tender document fee should be enclosed.


Thanking you,













Yours faithfully,




For KIOCL LIMITED




Blast Furnace Unit

















DGM (Contracts)

Page 3 of 1
4


PROFORMA FOR TECHNICAL EVALUATION OF BIDDERS


The agencies who are sending their letter of expression must furnish following details along with
documentary evidence of their claims.
However. Any surrogated submission in any will disqualify
them from.

1.

Name of the Tenderer






:

2.

Address




(a) Postal Address






:




(b) Communication Address

:

3.

Contact person & Telephone No.



:



i)

Office








:



ii)

Residence







:



iii)

Mobile No.







:

4.

Whether sole proprietorship /



Partnership / Company





:


(In case of partnership/company firms, copy of the partnership deed/ company details shall
be furnished indicating clearly the authori
zed signatory of the firm)

5. Average annual financial turnover during the last three years, ending 31
st

March of 2011
should be atleast
Rs

1.
6
0

lakh


6.

Experience of ha
v
ing successfully completed similar work during last seven years ending 31
st

March 2011.

i) Three (3) similar completed works costing not less than the amount
Rs.

2.1
3

Lakh
(Rupees
Two

lakh
thirteen

thousand Only)

OR

ii) T
wo (2) similar completed works costing not less than the amount

Rs.

2.
66
Lakh
(Rupees Two lak
h
sixty six


thousand only)

OR

iii) One (1) similar completed work costing not less than the amount
Rs.
4
.
25

Lakh
(Rupees
Four

Lakh
twenty five

thousand Only)


Note: i) Similar work means
Fabrication and Erection of steel structure


carried out in
Process Plants/Industries/Public sector/Government under takings.



ii) Work order copies and work completion certificate should be furnished.

7.
Provident Fund
A
ccount

No
, if available


:

8.
ESI
A
ccount
N
o., if

available




:

9.
PAN No (
Mandatory)




:


10.
Service tax Registration No
, if available

:

11
.

All payment shall be made on electronic mode. Contractor shall furnish the required bank
details to affect the electronic mode of

payment.

a) Name of the Bank






:

b) Branch Address



:






c) Type of Account (Current/Savings)


:

d) Account No.







:

e) MICR Number (9 digit No.)




:

f) Branch code







:

g) IFSC/RTGS No.




:



Page 4

of 1
4






KIOCL LIMITED

(A Government of India Enterprise)

BLAST FURNACE UNIT

PANAMBUR, MANGALORE
-

10.


No: BFU/CON/
MM
/
02/81









Date:
29/12/2011


Sub:
Strengthening

of Structures in Blast Furnace, Dust Catcher, GCP, Stoves, PCM and


other
areas
of BF Complex.


INSTRUCTION TO
BIDDERS


1.

The Tender shall be accompanied by an Earnest Money Deposit *(EMD) of
Rs. 6000.00
(
Rupees
Si
x
thousand

only)

to be deposited only in the form of a Demand Draft from a
Scheduled Bank drawn in favour of BFU, KIOCL Limited , , Panambur, Mangalore. The EMD
shall be returned to unsuccessful Bidders within 28 days after deciding the successful Bidder
and in case of s
uccessful Bidder, the same shall be returned after submission and acceptance of
the Security Deposit for this work referred to in Article No. 37 of “General Conditions of
Contract”. (Rs.
*5000.00

for Registered contractors with the company

.
(


2.

SSI Units
registered with NSIC under single point Registration Scheme giving documentary
evidences will be exempted from EMD for participating in the tender.


3.

Tender will be received up to
3:00 P.M
. on
03.02.2012.


4.

Tenderers have to acquaint themselves with the cond
itions prevailing at site, before
submitting the tender (incase of site works).


5.

(a) Tenderers shall furnish their quotation only in the
“Price Bid
-

Schedule of quantities





enclosed to the tender documents, prices should be written



both i
n words
a
nd figures.

(b) The tender document duly stamped and signed on each page must be submitted along with
the offer documents as a token of acceptance of all the terms and conditions.

(c) No page of the tender document shall be removed or altered and
the whole set of tender
document given must be submitted after being filled in and signed by the Tenderer himself
or his authorized signatory.

6.

Owner reserves the right to reject any tender or all tenders without assigning any reason.

7.

Owner reserves the
right to award part of the work or as a whole, as may be considered
necessary.

8.

Tenders received late are liable for rejection.


9.

Tenders submitted without EMD shall not be considered.

10.

Conditional tenders will be summarily rejected.

11.


No post


tender negotia
tions with bidders will be held except in certain exceptional
situations.

12.

To assist in the examination evaluation and comparison of tenders received, the owner may, at
his discretion, ask any Bidder for clarification without changing NIT conditions
. The request
for clarification and the response. Shall be in writing or by fax/e
-
mail.



Page 5

of 1
4





TERMS AND CONDITIONS


1. The work shall generally be governed by KIOCL Limited General Conditions of Contract, which
is available for reference in th
e office of the DGM (Contracts), KIOCL Limited BF Unit on all
working days.


2.

The quantities given in the schedule of items are approximate and may vary. Some of the items
may not be executed; no claims by the Contractor on account of variations, omissions
&
modifications will be entertained.


3.

No escalation is admissible on any account whatsoever.

4.

Mode of measurement for the work shall be as per
IS
-
1200 latest edition. Unless otherwise
specified for items not covered in
IS
-
1200, CPWD standard shall be
adopted.


5.

Quoted rates against schedule items shall include labor charges, consumable materials and
hire charges, applicable Taxes, Royalties transport, maintenance incidents enabling work etc.,
except service tax based on the conditions mentioned herein.
Unless otherwise specified in the
tender schedule the rates for all items will be deemed to include all leads, lifts & descents in
the work.


6.

The work executed shall be maintained in good condition for a period of


Twelve

Month
from
the date of completion

including repair required if any at Contractor’s cost. If the Contractor
fails to fulfill his obligation during the maintenance period, the same shall be got done by the
owner at contractor's risk and cost.


7.

Security Deposit

a)

Within 15 days of the aw
ard of the Contract, Contractor shall deposit with KIOCL
Limited BFU an initial Security Deposit of 3% (three percent) of the Contract Value
and the same shall be in cash or in any of the following forms.


i)

Demand drafts drawn in favour

of KIOCL BFU from any Nationalised / Scheduled
Bank.


ii)

Bank Guarantee in prescribed Proforma, executed by a Nationalised Bank /
Scheduled Bank. If the bank guarantee is from a non
-
Indian Bank, the same shall
be got stamped at Bangalore, Karnataka State, I
ndia, by the Foreign Banker’s
Associates / Subsidiaries or agents in India, in accordance with the laws
applicable in State of Karnataka, India .



b)

As and by way of additional security, from every progressive bill of Contractor,
Security Deposit at the
rate of 7% of the Gross Value of such bill as determined
before payment shall be retained by KIOCL Limited BFU or Contractor can submit
additional Security Deposit by Bank guarantee.



c)

The Security Deposit shall be refunded after successful completion o
f work or
maintenance period as applicable.


d)

The EMD shall be returned after submission and acceptance of the initial Security
Deposit.


e)

In case of failure to commence the work, EMD submitted is forfeited.


Page 6 of
14



8.

Any damage to the Company's property caused by the Contractor during the
execution/maintenance of work, shall be charged to the Contractor and the amount of
damage shall be left to the sole discretion of the Engineer.


9.

Statutory deduction towards all app
licable taxes shall be made as per rules.


10.

Royalties if any for materials applicable shall have to be paid by the Contractor and included
in the cost of tender.


11.

All Safety appliances like Helmet, shoes etc. have to be provided by the Contractor to all h
is
workers and Supervisors at no extra cost of KIOCL Limited, BF Unit. None of the workmen
without safety appliances shall be allowed to work.


12.

Safety requirements
:
-


a)

Contractor and his work force shall follow strictly, all the safety rules given in General
Safety rules, especially for contractor and contractor’s labors, a copy of which is kept at our
office for reference and instructions given by Engineer
-
in
-
charge/ Sa
fety Dept. from time to
time in the course of job.


b)

None of contractor’s men shall move out side the specified limit of working place.


c)

All the persons deployed on the job shall use safety helmets and goggles, shoes, safety belts
and hand gloves as appli
cable. Any person found without the safety gadgets shall be
removed from the work site.


d)

Contractor shall use only standard and tested lifting tools/ tackles on the job and shall
produce relevant test certificate on demand by owner’s Engineer
-
in
-
charge/ S
afety Dept.


e)

Supervisor and employees deployed on job has to undergo training by KIOCL Limited BF
Unit Safety unit along with contractor, if he has not undergone such training previously.
This training should be undergone before issue of gate pass.


13.
The contractor shall abide by the provisions in the Water consent; Air consent and
Hazardous management consent applicable to our company.


14. The Contractor shall abide with all the provisions contained in Factories Act 1948 and Rules/
Regulation/
By laws/ orders made there under.


15. The Contractor should obtain Insurance Policy to cover the risk of the labours under
Workmen Compensation Act and should be produced before starting the work.

This is
mandatory for those contractors who do not have ES
I number of their own.


16.
Contractor should furnish the PF & ESI code numbers obtained from respective authorities



and also produce the same to the Personnel Department before commencement of the work.


However, in case a contractor who does not have PF & ESI code number, should apply for



PF & ESI code numbers from the respective authorities based on the LOI/Work Order issued


to them and produce the same to Personnel Departme
nt.


1
7
. The Contractor has to make his own arrangement for accommodation, transportation, canteen
facility on a bulk basis to the Contractor at Non Subsidized Rates will be provided if
requested by the Contractor.


Page 7 of 1
4




1
8
. Time of completion a
nd Liquidated Damages.


The entire work under this Contract shall be completed within

Six

Month

from date of
start of work

excluding mansoon period.

If the Contractor fails to complete the work
within the stipulated completion time, the contractor shall
pay to owner liquidated damages
for such default, for every day which shall elapse between the date prescribed thereof and
the actual date completion of the scope of work, the amounts determined on the basis of the
percentage of the apportioned value of su
ch components as specified herein.

Delay of first 20 days …………………………………… 0.1 % per day

Delay beyond first 20 days ………………………………...0.15 % per day

Subject to Maximum of 5% of the total Contract Value


19
.

The contractor shall take photo entry pass from CISF f
or his laborers, if the work order
period is more than seven days, without fail. These photo passes should be taken by the
contractor well in advance before taking up the job. If the work order period is less than
seven days, then CISF will issue te
mporary pass. No laborers will be allowed to enter plant
premises without these entry passes.


20
. The works mentioned at the schedule of work are temporary in nature.


21
.

Bids shall be valid for a period of
THREE MONTH

from the due date of submission of the bid.


22
.

TAXES & DUTIES:

This clause shall be applicable not withstanding any other clause related to
taxes and duties mentioned elsewhere in this tender document.


a.

The rate quoted shall be inclusive of all taxes a
pplicable for this work except Service tax.


b.

The applicable service tax will be reimbursed on production of proof of remittance of
Service Tax as per Rule 6(1) of Service Tax Rules for those contractors who do not have
Service Tax Registration Number.


c.

For

contractors who are having Service Tax Registration No. , the Service Tax will be paid
extra based on claim of the contractor. However, the contractor shall produce a copy of
half yearly return of Service tax filed at the office of the Superintendent of
Central Excise.
The final bill / SD will be released after production of the copy of half yearly return.


23
.


The contractor shall disburse the wages to the labour on or before 7
th

of the following
month and furnish copy of wage register, muster roll a
long with the bill. PF & ESI challans
shall be submitted to personnel department on or before 25
th

of the following month”.


24
.


Contractor shall ensure payment of minimum wages not only as existing at the time of
award but also as may be notified from Pe
rsonnel department KIOCL Limited from time to
time.




25
. Every one may take a note that a “Fraud Prevention Policy” is being followed at KIOCL
Limited, which provides a system for prevention/ detection/ reporting of any fraud. It also
forbids everyone

from involvement in any fraudulent activity and that where any
fraudulent activity suspected by anyone, the matter must be reported to the ‘Nodal Officer’
(Chief Vigilance Officer) as soon as he/she comes to know of any fraud or suspected fraud.



26.

Evaluation of
T
ender:

Tenders will be evaluated based on the rates quoted by the bidder
in schedule of quantities
.

Total amount quoted
will be considered for
finalizing the lowest
bidder

and only lowest bidder will be considered for award of work.







Page 8 of 1
4




Page
9

of 1
4


SPECIAL CONDITIONS


1

Contractor shall visit the site of work to acquaint himself

with the type of work involved, site
conditions prevailing and other environmental factors prevailing in Plant area which are
contingent upon scope of work envisaged under this contract.

2

Except for item No. 3, all structural steel sections required for this work including bolts, nuts,
washers and any other
hardware
, consumables like Oxygen, LPG, welding electrodes shall be
provided by KIOCL Ltd
-
BFU free of cost. Supply of coal tar black pa
int and epoxy thinner will
also be made by BFU fee
of cost

for both items 2 & 3.

3

For jobs under item No.3, the agency may get the floor gratings fabricated in outside workshops
using ISA 50X50X6 and MS flat of 40X6 size (Material supply in agency's
scope), as per the
required dimensions. However the Contractor has to keep a record of materials entering inside
the main gate after inspection by the Engineer in charge. Transportation of the fabricated floor
gratings from outside workshop in such case is

the responsibility of the Contractor only.

4

For shifting of owner issued items from Stores (structural steel and paints), the Contractor has
to make necessary arrangement to collect these items and shift to work spot. Owner's
equipment such as loader fo
r shifting of these materials shall be provided on free of cost basis,
subject to the availability.

5

Required welding machine (One No.)will

be given to the agency free of cost by BFU. Agency has
to shift the machine wherever required. Power for welding will be made available to the agency
for the above job by BFU free of cost.

6

Tools & tackles like chain pulley block, welding cables, gas
cutting set with regulators, grinding
machine, welding head shield with glass, wire brush, paint brush, junction box with power
extension cables shall be arranged by the Contractor at his cost.

7

Site of work is within the prohibited area. All entries/ ex
its for men and material shall be
through the main gate, all of which are manned by Central Industrial Security Force (CISF) staff.
Entry /gate passess duly countersigned by the department HOD are therefore required to be
furnished at these gates.

8

All
material like tools & tackles brought to the site shall be safeguarded and protected against
theft and weather conditions. Contractor shall maintain proper records of entry.

9

All equipments, tools and tackles including scaffolding, ladders and ropes
etc., required for the
job shall be supplied and maintained in serviceable condition by the Contractor and shall be
strictly fulfill the structural requirements of tools and equipments. The relevant test certificates
for tools like chain pulley blocks, sli
ngs, D
-
shackles, etc which are brought inside the site for the
work to be produced by the Contractor on demand by the Engineer in Charge.

10

General shift working hours inside the plant shall be from 8:30 AM to 5:00 PM. Height permit
will be given for working in certain critical areas which involve working at height more than
3m. Contractor has to ensure that the height permit is ensured when w
orking at height and
necessary safety precautions are taken by providing safety helmets, shoes, safety belts, hand
glouses, goggles, etc throughout the job. The safety appliances given to the workers shall have
ISI brand wherever applicable and should not
be of substandard quality.

11

After completion of the job in each area, the Contractor has to ensure that all the scraps
generated are cleared including the empty paint drums, welding rod butts, cut pieces of new
steel material and complete
housekeeping

is done to the satisfaction of Engineer in Charge.

12

Above shown quantity of work is maximum during estimation. Payment will be made for actual
completed job based on field measurement and submission of invoice certified by the Engineer
in Charge (unit weight shall be taken from the standard steel table for
erected/strengthened
members as per the joint measurement for item No.2, weighment ticket obtained from the
weigh bridge for item No. 1 and for item No. 3, the basis of measurement is square
meters

of
gratings supplied and erected).

13

Maintenance period
applicable for the above job may be taken as 12 months from the date of
completion against the workmanship.



DETAILED SCOPE OF WORK


A.

BLAST FURNACE AREA: App. 9 MT

1.

Above bustle main pipe, damaged walkway chequered plates/gratings, supporting channels

and hand rails to be replaced.

2.

In Bosch level of the Furnace, 2 Nos. of small staircases connecting to two nos. of circular

walkways(Cast house side), chequered plates
, supporting channels, handrails to be


repaired/replaced.

3.

In 18m level, corroded/damaged redundant structures to be removed by gas cutting.

4.

In 21m level, towards Cast house side damaged chequered plates and supporting members to


be replaced.

5.

Below 24m

level floor, hanging pieces/section of old damaged gratings to be removed by gas

cutting.

6.

In 24m level, damaged chequered plates & handrails towards Cast house side, inside Power

pack room to be replaced along with supporting members. Opened up chequere
d plates to be

positioned and completely welded. Also redundant damaged structures welded to different

members to be removed by gas cutting.

7.

Connecting & supporting members of the staircase leading from 24m level to 28m level to be

replaced. Staircase
to be strengthened.

8.

Maintenance platform near to the top cone man holes (28m level) at both sides to be

replaced/strengthened.

9.

Walkway supporting channels & chequered plates from lift 2
nd

floor to 28m level of the

Furnace to be replaced.

10.

Walkway leading to Stove top to be provided with chequered plates, handrails and

strengthened wherever required.

11.

Lift well connecting members from stairwell (near lift 2
nd

floor) to be replaced wherever

damaged.

12.

BDV maintenance platform to be strengthene
d by replacing the floor members.

13.

Redundant pulley supporting structure near BDV to be removed by gas cutting.

14.

2 Nos. of ladders from Bell lever floor to Furnace bleeder to be strengthened.

15.

In Bell lever floor, near PRV, floor gratings are to be replaced.

16.

FIV and HBV supporting trestles
-

Replacement of damaged bracings and strengthening of

columns wherever required.

17.

Cast House crane girder
-

Damaged bracings towards LRS/Dry pit side to be replaced.

18.

LRS Crane lighting maintenance walkway to be strengthened t
hroughout the bay.

19.

Any other structural repair works as identified & instructed by the Engineer in Charge in the
above mentioned area.





Page 10 of 1
4









B.

DUST CATCHER(DC) AREA: App. 4 MT


1.

At the “0” m level,
bracings between the columns (Furnace side and GCP side) to be replaced.


2.

Staircase from ground level, to Dust Catcher 1
st

floor
-

Landing platform gratings to be
replaced along with damaged handrails.


3.

1
st

floor gratings to be replaced wherever damaged (near bleeder valve winch) along with
floor members, handrails. Staircase to Tuyere platform to be strengthened along with
handrails.


4.

Staircase, landing platform and handrails leading to Dust catcher manhole
s (2 Nos.) to be
repaired wherever damaged.


5.

Near top man hole of DC, scraps collected to be cleared along with any other redundant
structures.


6.

In DCCV floor, PRV pipe supports to be positioned and welded.


7.

Damaged gratings in DCCV floor and toe guards to

be replaced.


8.

Damaged canopy for DCCV close disc to be removed and new one to be fabricated. Any other
structural repair works as identified & instructed by the Engineer in Charge in the above
mentioned area.



C.

GAS CLEANING PLANT(GCP)/EFFLUENT TREATMENT
PLANT(ETP) AREA: App. 5 MT


1.

After Septum Valve/Goggle Valve, entire bracings of gas line supporting trestles above power
pack to be replaced along with ladder supporting brackets.


2.

Launder supporting first column after GCP to be replaced alongwith the b
racings.


3.

2 Nos. of launder supporting columns near Thickener 2 (where MW/FW/GCP water supply
pipelines rise and next one towards Thickener) to be replaced/strengthened along with
damaged bracings.


4.

Launder walkway chequered plates, supporting channels, handrails to be replaced near the
first column and other places wherever required. Opened up welding to be re
-
welded after re
-
positioning the chequered plates. Launder flanges to be repaired at two pla
ces.


5.

In CGP different floors, openings near the columns to be covered suitably. Handrails (top
floor) to be provided wherever damaged/missing.


6.

Staircase between GCP and DC to be strengthened at both ends.


7.

Any other structural repair works as identified

& instructed by the Engineer in Charge in the
above mentioned area.



Page
11

of 1
4








D.

PCM AREA: App. 4 MT


1.

Interconnecting beams on return side of both the strands require replacement.(1 No. each in
both strands).


2.

Inside both the return chutes, one no. each interconnecting beams to be replaced as they are
damaged.


3.

Return side middle walkway to be provided with toe guards and middle member for the
existing handrails.


4.

Return side both sides walkways to be provided w
ith handrails, toe guards, etc. to the entire
length

(inner side).


5.

Small staircases below the drive end platform leading to return side of the strand on both
sides of the strand need to be replaced along with damaged walkway channels/chequered
plates.


6.

On
e no. of ISMB 150 (1m lg.) to be replaced above return side middle walkway as it is
damaged.


7.

Below drive end walkway (towards new PCM) floor grating supporting channels to be
replaced wherever damaged.


8.

At PCM drive end, wagon cooling pipeline supports to

be replaced.


9.

Surrounding the discharge chute of both machines handrails with toe guards to be provided.


10.

Drive end platform also to be provided with toe guards at all four sides.


11.

Lime agitator storage tank supporting columns (4 Nos.) to be replaced by
new members along
with damaged floor members and chequered plates. Holes to be made on the chequered
plates to drain the rain water collected. Also lime tank pouring platform to be strengthened.


12.

Damaged roof purlins

of the lime agitator tank to be replaced by new members.


13.

Any other structural repair works as identified & instructed by the Engineer in Charge in the
above mentioned area.






Page
12

of 1
4













PRICE BID

SCHEDULE OF QUANTITIES


Item
No.

Description of work

Qty

Unit.

Rate

(Rs)

Per

Amount

(
Rs
)

1

Dismantling of damaged/rusted steel
structures (at different locations as
mentioned in the scope of work) and
lowering by means of rope, weighing the
dismantled steel structures in KIOCL
-
BFU's
weight bridge and returning to KIOCL
-

BFU's
Stores with material return voucher in
KIOCL's prescribed format,

including making
necessary arrangement for shifting of
dismantled items, all tools, tackles, complete
-
all as per the instructions of Engineer in
C
harge.

20.00

MT


MT


2

Fabrication of any type of steel structures
required for strengthening/rectification of
existing steel structures at any height and
location (at different locations as mentioned
in the scope work), including cutting,
cleaning the
member for erection of
fabricated items at suitable locations with
proper fitment at any heights and using
owner supplied steel, consumables like
welding electrodes and cutting gas,
application of owner supplied two coats of
coal tar black paint to the fab
ricated new
members, all necessary by works, required
for strengthening/rectification including
providing all tools and tackles, complete as
per the instructions of Engineer in Charge.

20.00

MT


MT


3

Material and labour complete for fabrication,
supply of floor gratings as per the sketch
enclosed and size as per the site condition
for walkways and platforms at any height
and different elevation (at different locations
as mentioned in the scope of work)

including
erection, alignment and welding
-

all as per
the instructions of Engineer in Charge. The
job also include application of owner
supplied 2 coats of coal tar based black paint
to all faces of gratings.

40.00

Sq.M


Sq.M


TOTAL

(
I
nclusive of
all taxes
PF, ESI,
except

service tax)



(Rs in words:


only)




Page
13

of 1
4





SCHEDULE OF QUANTITIES


Item
No.

Description of work

Qty

Unit.

Rate

(Rs)

Per

Amount

(
Rs
)

1

Dismantling of damaged/rusted steel
structures (at different locations as
mentioned in the scope of work) and
lowering by means of rope, weighing the
dismantled steel structures in KIOCL
-
BFU's
weight bridge and returning to KIOCL
-

BFU's
Stores with material return voucher in
KIOCL's prescribed format,

including making
necessary arrangement for shifting of
dismantled items, all tools, tackles, complete
-
all as per the instructions of Engineer in
C
harge.

20.00

MT


MT


2

Fabrication of any type of steel structures
required for strengthening/rectification of
existing steel structures at any height and
location (at different locations as mentioned
in the scope work), including cutting,
cleaning the
member for erection of
fabricated items at suitable locations with
proper fitment at any heights and using
owner supplied steel, consumables like
welding electrodes and cutting gas,
application of owner supplied two coats of
coal tar black paint to the fab
ricated new
members, all necessary by works, required
for strengthening/rectification including
providing all tools and tackles, complete as
per the instructions of Engineer in Charge.

20.00

MT


MT


3

Material and labour complete for fabrication,
supply of floor gratings as per the sketch
enclosed and size as per the site condition
for walkways and platforms at any height
and different elevation (at different locations
as mentioned in the scope of work)

including
erection, alignment and welding
-

all as per
the instructions of Engineer in Charge. The
job also include application of owner
supplied 2 coats of coal tar based black paint
to all faces of gratings.

40.00

Sq.M


Sq.M


TOTAL

(
I
nclusive of

all taxes
PF, ESI,
except

service tax)



(Rs in words:


only)




Agency Name and Authorized Signature with seal.