There

is a number of unexploited buildings and facilities at the premises of the pig
farm. The plan provides for retention of the existing foundations and frames of the
buildings, reconstruction of walls and roofs to make

such facilities good for pig
breeding. Local manure removal systems connected with the main manure
canalization will be installed in each unit of the farm.


Sixteen units,
dimensions: 120 x 18 m.




Foundation
: reinforced concrete pads



Structure
: reinforced

concrete half
-
frames



Walls
: reinforced concrete slabs (there are provisions to apply heat
insulation).



Roof
: connected asbestos
-
cement boards, first layer is reinforced (there are
provisions to apply heat insulation and change overhead slabs).



Heat insula
tion: mineral wool



Floors: concrete
, above the manure removal channels


The

existing buildings will be turned into 4 sow units, 4 piglet units and 8 feeding
units.

There

are manure removal channels and automatic feed and water distribution
systems in each
unit.

Pigs

and piglets are moved from unit to unit on motor vehicles.

Ventilation
, heating and microclimate systems are installed in each unit.


Slaughter house, dimensions: 120 x 18 m




Structure
: reinforced concrete half
-
frames.



Foundations: reinforced co
ncrete pads.



Carcass: reinforced concrete half
-
frames,
T beams.



Walls
: reinforced concrete slabs.



Roof
: asbestos
-
cement boards.



Floors: concrete and slabs
.


Slaughtering

equipment and units to divide the carcasses into halves should be
installed in the hou
se.


Refrigerator, dimensions:
120 x 18 m.




Structure: reinforced concrete half
-
frames.



Foundations: reinforced concrete pads.




Carcass: reinforced concrete half
-
frames, T beams.



Walls: reinforced concrete slabs (there are provisions to apply heat
insulati
on).



Roof
: connected asbestos
-
cement boards, first layer is reinforced (there are
provisions to apply heat insulation and change overhead slabs).



Floors: concrete and slabs
.


H
alf carcasses cooling and storage equipment should be installed in the building.


Receiving tank
:




Building

measuring 9 x 6 m, tank’s depth
-

6 m,
м
, walls covered with
reinforced concrete slabs (t = 30 cm), above the ground level.



Walls: brick.



Overhead

slabs
:
reinforced

concrete.



Roof
:
rolled

(Кровля


мягкая
-

битумная?)



Floors: c
oncrete.


The

receiving tank will collect manure from the units.


Sewage

pumping

station




Round
-
shaped building: D=6 m, depth h=6 m.



Reinforced concrete well to the level
±0.00.



Above the ground level
-

brick walls



Overhead

slab: monolith, reinforced concr
ete.



Roof
:
rolled.



Floors: concrete.


The

station will pump manure to the lagoons.


Feed unit




Dimensions:
30
x

18

m
.



Carcass
: reinforced concrete, columns, reinforced concrete framework.



Walls: reinforced concrete slabs



Overhead

slabs
:
reinforced

concrete
.



Roof
:
rolled.




Floors: concrete.


Feed

making units will be installed in the building.


Planned

landscaping of the territory will ensure hygiene, favorable microclimate
and modern image of the facilities under the project.


Landscaping

of the farm’s terr
itory by the access drive comply with SNiP 2.07.01
-
89*, appendix 9, and SP 2.3.6.1066
-
01, c.2.8.



Roads

throughout the farm will be covered with fine asphalt.


Bearing

capacity of the road surface is
Н
=30 (equal to centric load of 12 t), which
makes t
he margin of safety considerable.


Sanitary, decorative and aesthetic properties of the greenery are taken into account
when developing the Pig Farm's landscaping project
. Lawns and flower beds will
be arranged to sanitize the area.


Solid

wastes will be b
rought to a special ground located within 100 m from the
farm, which complies with the p.2.7 SP 2.3.6.1066
-
01 regulations. The wastes will
be removed from the ground every day.