Progress!


Design of PACS as a system has reached a stable
state


Remaining open issues


as important as they may
be


are concrete, isolated problems to be solved


Big leap in CRE noise reduction


Demonstration of bolometer detection chain
operation


Qualification/characterisation of many subunits


Almost all S/C interfaces agreed

PACS IHDR

12/13 Nov 2003

PACS PI Summary

3

The Schedule and Its Consequences


PACS (as the other Herschel instruments) has been
forced to adopt serious deviation from original (ESA)
model philosophy


QM not flight representative


Verification of IL test plan only partial


Significance of EQM IMT limited


This new scheme implies increased risk for FM
programme


and therefore for FM schedule


Several subunits on critical path (detectors, DECMEC)


No margin = guaranteed schedule slips

PACS IHDR

12/13 Nov 2003

PACS PI Summary

4

PACS Areas of Concern


DPU technical problems (1355/1553) could put CQM
ILT at risk


No DPU


no test
at all


Possible impact on QM/FM programme


Cryovibration of bolometers


Are we sure the Kevlar problems are under control?


Variability of photoconductor pixel responsivity


Implementation (including funding) of improved FS
CREs in time for FM detector swapping


Implementation of desirable subramp compression in
existing SPU HW

PACS IHDR

12/13 Nov 2003

PACS PI Summary

5

PACS Areas of Concern


PA/QA not up to standards


Heterogeneous situation with subunits


Unsatisfactory at PACS system level


Documentation far behind


but see above


Do you want hardware or do you want paper?


We will try to catch up and complete documentation by time
of AVM/CQM delivery

PACS IHDR

12/13 Nov 2003

PACS PI Summary

6

Future Strategy


Proceed as fast
as possible


...but not faster


Concentrate on solving the remaining problems


Schedule is important


Delivery of something that cannot be tested makes no sense


Keep planning flexible to take advantage of any slip
in S/C schedule


They may encounter problems, too


Extension of ILTs should always be possible/welcome


ILT period of 6 months (minimum) for FM will not be
given up