Cancer Bioinformatics Infrastructure Objects (caBIO)

vivaciousefficientΒιοτεχνολογία

1 Οκτ 2013 (πριν από 4 χρόνια και 10 μέρες)

84 εμφανίσεις







Addendum

Cancer Bioinformatics Infrastructure Objects (caBIO)

Enterprise Conformance and Compliance Framework (ECCF)

Reference Implementation Meeting Minutes



Meeting Date/Time:

Wednesday,
September 8
, 2010, 11:00
-
12:00 PM

Meeting Location:

Teleconference

Meetin
g Attendees:

Baris Suzek, Sharon Gaheen, Jim Sun, Konrad Rokicki, Liqun Qi,
Juli Klemm,
Elaine Freund, Kunal M
odi, Brian Davis


Agenda:



Follow
-
up on a
ctions



Discuss feedback on the PSM from the ESST team


Notes:



Followed
-
up on actions

o

Need to contact Davi
d Hau regarding review of the Service Integration
Guide

o

Completed modifications to the MA service conformance statements

o

Continued service implementation activities



Deployed the MA database to the QA tier



Assisted in providing test scripts to the QA team



MA grid service is currently being tested by the QA team



MA grid service will be demonstrated on the QA tier at the caBIG
conference

o

Began drafting a gap analysis of MA service and SOA design principles

o

Prepared for the caBIG conference



Completed the

caBI
O ECCF

poster

and World’s fair presentation



Completed demonstration scripts

o

Updated the project plan with status




Discussed feedback on the PSM from the ESST team

o

Drafted presentation with options for addressing traceability issues for
query
-
by
-
example que
ries

(i.e. CQL based queries)

[
https://gforge.nci.nih.gov/svnroot/cabiodb/ECCF/meetings/caGridPlatfor
m
-
template
-
Options.ppt
]

-

Option 1: No CIM and
PIM changes; Merge
PSM service specification
with the
caGrid PSM template

-

Option 2: Link to caGrid PSM

template

in the

PSM
service
specification

only

-

Option 3: Link to caGrid CIM, PIM, and PSM

templates

at each level

of the service specifications

o

Option 1
was selected for the
existing MA service since the MA service
currently leverages the caGrid PSM template.







Addendum

o

Option 3 was selected going forward. Under Option 3, a profile will be
created for query
-
by
-
example

queries

(CQL queries)

and

this profile will
be r
eferenced

(via link) in the CIM, PIM, and PSM
service
specifications.
Kunal Modi will assist in drafting the
standard
query
-
by
-
example

(CQL
query)

profile which will be referenced

in each specification.




Agenda for the 9/
22

meeting

o

Follow
-
up on a
ctions

o

D
iscuss feedback from the caBIG conference

o

Review the finalized conformance statements

o

Review the Query
-
by
-
Example

(CQL query)

profile

o

Discuss next steps
:

-

Send updated PSM specification to LS CAT for review

-

Finalize conformance statements and send to LS CAT

for follow
-
up

-

Begin drafting document on results of pilot effort


Actions:

Action

Assigned To

Review the Service Integration Guide

David Hau

Finalize

the MA service conformance statements

caBIO team

Draft the Query
-
by
-
Example
(CQL Query)
profile

Kunal
M
odi

Perform a gap analysis of MA service and SOA design principles

caBIO Tearm

Update the PSM specification base on ESST review

caBIO Team

Continue to update the project plan with progress

Sharon Gaheen