2012-Mar-03 - Cuyamaca College

ukrainianlegalΗλεκτρονική - Συσκευές

2 Νοε 2013 (πριν από 3 χρόνια και 9 μήνες)

90 εμφανίσεις

03/03
/2012

Cuyamaca College

Engineering Club
:

Build Team
Meeting


Agenda

I.

Administrative Announcements

II.

Team Discussions

III.

Group Picture

IV.

Next Meeting


I.

Administrative Announcements

1.

Check website for updated information (
cuyamaca.edu/engrclub
)

2.

Officially appoint Jeremy B. and Jeremy M.

team l
eads

3.

Project Update

a.

FAA Regulations


Launch Site Requirements

b.

Mt Carmel Launch

c.


Landing projection models => Drive launch site selection

4.

Professor Lehman

a.

Grossmont Chemistry Professo
r

b.

Experienced with amateur rockets

c.

Helped with Mt. Carmel HS Balloon Launch

d.

Brother is an Electrical Engineer

e.

Requested donations from QualComm

(MC: Radio & GPS), GoPro,

&

Contour

f.

Letting us use his Canon Camera with firmware installed

g.

Researching Particle

Collector design elements


II.

Team Discussions

1.

Teams form up into groups

a.

Discuss team projects

2.

Team Specific Updates

a.

Launch Site Selection Team

i.

FAA regulations update

ii.

Landing Projections => Drive Launch Site Selection

1.

Determine if we can launch from
Grossmont or Cuyamaca

iii.

Set up computers

1.

Show what Mt. Carmel HS did

2.

Show models

b.

Particle Collector Design Team

i.

Enhance design with team feedback

ii.

Develop parts list

03/03
/2012

iii.

Develop build schedule

iv.

Determine deadlines

v.

Coordinate with Micro
-
Controller Team

c.

Micro
-
Controller Team

i.

Pressure sensor status

ii.

Feasibility projections

iii.

Develop parts list

iv.

Develop build schedule

v.

Determine deadlines

3.

Team Presentations

a.

Launch Site Selection Team

b.

Particle Collector Team

c.

Micro
-
Controller Team

d.

Misc. Project Items

i.

Helium


Emil
io

1.

65
-
75 ft
3

required

2.

WestGas Air

3.

Request donation from welding shop on campus?

ii.

Cold Temperature Electronics Testing
-

Jeremy M. & Kevin R.

1.


SDSU cold freezer

2.

Determine number of hand
-
warmers required

4.

Integrate
Timeline

5.

Integrate
Deadlines


III.

Group Picture

a.

Take a group picture


IV.

Next Meeting

1.

All meetings will be build team meetings until
after
balloon launch

2.

Professor Lehman will be attending

a.

Update on his inquiries

b.

General Q&A

3.

Manufacturing Engineer guest speaker 03/17/12 (build team meeting following)