Wildland Fire Management

snowpeaschocolateΔιαχείριση

18 Νοε 2013 (πριν από 3 χρόνια και 8 μήνες)

71 εμφανίσεις

Wildland

Fire Management
Information (WFMI) Weather

Lesson 7: Post
-
Trip Documentation

February 2013

Post
-
trip Update


WFMI Weather module is linked to National
Interagency Fire Center (NIFC) Asset
Management System (NAMS)


User can update post
-
trip information through
WFMI Weather interface


Post
-
trip Update = Document annual
maintenance and repairs

WFMI Weather

In the WFMI Weather module, pick Select Station.

Select Station

A station can be selected from this list or the

Change Selection Criteria button can be chosen. More
information about Select Station is in Lesson 4.

Station Page

Select NAMS


Post
-
trip Update on the Station page.

Assign Asset Numbers

For stations
under a depot,
portable return,
modified
or full ride contract with the Remote
Sensing Fire Weather Support Unit (RSFWSU),
asset numbers must be assigned.



Note:

If the station is
not

under contract with
RSFWSU, continue to the Dates field
.

In the New Asset Number column, the assets ordered from
RSFWSU are shown. Select the asset number of the
sensor/part that was installed on the station during annual
maintenance or repair. If more than one asset was ordered,
be sure to select the correct number to assign to that station.

Dates

Complete the annual maintenance date, or if this
was a repair, fill in the repair date. Tipping bucket
zeroed date can be completed, if known.

DCP/Solar
Rad

DCP program, DCP firmware, and Solar
Rad

Constant
can be
completed,
as necessary.

Narrative

Describe
annual maintenance or repair.
Include
date
completed, who
performed
service, which
sensors
changed,
and
additional
notes.
N
ame of person
entering
information,
along with the current date, is automatically
entered.

Asset Report

A RAWS asset report can be emailed to

one
or more
addresses.

Click Submit Post
-
trip Update button

if all information on page is complete.

Updates Submitted to NAMS

The page shows that the information was
submitted to NAMS.

NAMS Asset Report


Post Trip

If a NAMS Asset Report was requested, a
confirmation will appear on the page.

For stations under contract with RSFWSU, the
asset
report
may show multiple sensors for the station. This is
due to both old and new sensors assigned to the station.
The old sensors will remain assigned to the station until
they are shipped and received at RSFWSU and cleared
from the order.