System of
thermography

with

the

sponsorship

of

project ‘
Application

of modern building
diagnostic

methods

at

South
-
Transdanubian

region

using

professional

thermal

imager

and
dew

point

measuring



Investment
Engineering

and
Principal

Contractor

Ltd
.

H
-
7400
Kaposvar
, 1st
Kontrassy

Street

A projekt a Nemzeti Kutatási és Technológiai

Hivatal támogatásával valósult meg.



Beneficiary: Investment Engineering and Principal Contractor Ltd
.


H
-
7400 Kaposvar, 1st Kontrassy Street



Construction activity: Technical research and innovation, engineering activity,

counsel, organization of construction projects



Procurement cost of project: net 8,035,450.00 HUF



Sponsor Authority: National Research and Science Office of Technology

(’Nemzeti Kutatasi és Technologiai Hivatal’)


in the name of the

responsible minister for developing of research and innovation of

technology



Sponsor resource: Innovational foundation for research and science


(’Kutatasi és Technologiai Innovacios Alap’)


Provided assistance: net 5,614,00.00 HUF



Contents

of
publication



1.
Insight of pursuit of our company

2.
Determini
n
g milestones of procurement project

3.
Achievements

of
the

project

4.
Possibilities of economics and societal exploitation to the long term


1.
Insight of pursuit of our company



Forming : The Ltd is formed by two private persons in September 1992.



Main activity: Technical research and innovation, engineering activity, counsel,

organization of construction projects
.



Previous activities coherent with the project:
:



own investment of an A+
energetics

category condominium building



using of
WinWatt

and
DanWattPlus

softvers



produc
ing

expert’s appraisal

of building
energetics



produc
ing

application
s

of nationwide

block of flats
-

program, expert advice



expert’s

appraisal

of
justice


Our colleagues participant the project:



Certified

civil
engineer



2
persons



Certified

economist



1
person



Mechanical

engineer



1
person



Engineer

of
systems

analyst


2
persons



Architect




1
person



2.
Determinig

milestones of procurement project



Equipment and service procured with the sponsorship
:



VarioCAM

inspect 680 type 640 x 480 pixel thermal imager 30
mK

sensitivity

with accessories



IRBIS 3 evaluating
softver
, theoretical and practical training for 2 persons



Testo

410
-
2 airspeed, air humidity, and temperature measurer



HP 6830s Notebook for the evaluate in site


PR
activity



i
nforming

the previous clientele for the possibilities of the procured

equipment



f
inding

new costumers (also private persons) with advertising activity



c
onnecting

and interview with the partners of interdisciplinary use


3.
Achievements

of
the

project


3.1.
Achievements

of
own

application



The system of
thermography

has been operated to support the new and pending
expert’s appraisals
:



evaluation

of old
buildings



searc
h
ing

for heat
-
technics

errors of renovated buildings



making outside and inside
phot
o
s to search of thermal insulation errors



checking the thermal insulation and air
-
locking of windows and doors



producing repairing conception with the methods of evaluation used lately






3.
Achievements

of
the

project


3.1.
Achievements

of
own

application






exploration of heat bridges, prevention of the moisture condensation.


Our goal is a healthy home!



cost optimization of building renovations with refinement of the conventional

heat
-
technics

calculation



searching errors of windows, doors, and roller
-
blinds, giving suggestion about

repairing



constitution of renovating policy with systematizing the long term results of

measuring and valuations






3.
Achievements

of
the

project


3.1.
Achievements

of
own

application


1. photo:
B30 brick wall, reinforced concrete bearers and rings are heat
bridges
.


3.
Achievements

of
the

project


3.1.
Achievements

of
own

application


2. photo:
the heat bridge effect of reinforced concrete bearer and balcony
plate is visible
.


3.
Achievements

of
the

project


3.1.
Achievements

of
own

application


3. photo:
attic covered with plasterboard. The error of thermal insulation
causes temperature under dewpoint. Moisture condensation causes
mouldiness on the both sides of plasterboard. The solution is to fill in the
place behind the cover with foam
.


3.
Achievements

of
the

project


3.1.
Achievements

of
own

application


4. photo:
heat bridge is caused by breast
-
wall
-
ring
.


3.
Achievements

of
the

project


3.1.
Achievements

of
own

application


5. photo:
thermal insulated building, errors of insulation can be seen under
the plaste. In top of the picture the the grossness of insulation was reduced
under the gas pipeline
.


3.
Achievements

of
the

project


3.1.
Achievements

of
own

application


6.
photo
:
the

previous

thermal

insulated

house,
the

thin

heat

insulation

along

the

pipeline

caused

heat

bridge
.


3.
Achievements

of
the

project


3.1.
Achievements

of
own

application


7. photo:
thermal image of balcony door. because of the bad air
-
lock, the air
chills the floor and the frame of the door
.


3.
Achievements

of
the

project


3.1.
Achievements

of
own

application


8. photo:
thermal image of front door, was made from inside. bad air
-
lock can
be observed at the doorstep
.


3.
Achievements

of
the

project


3.1.
Achievements

of
own

application


9. photo:
good thermal insulated building, fitting and air
-
locking of window
should be repaired
.


3.
Achievements

of
the

project


3.1.
Achievements

of
own

application


10. photo:
excellent thermal insulated building, no heat bridges
.


3.
Achievements

of
the

project


3.1.
Achievements

of
own

application


11. photo:
the previous thermal insulated building, thermal insulation of
foundation can also be observed. Warm air of the air
-
outlet can be seen on
the upper part of the photo
.


3.
Achievements

of
the

project


3.2.
Achievements

of
interdisciplinary

applications




Partners of the project, and their functions
:




University of Pecs,
Mihaly

Pollack Faculty of Engineering


(’
Pecsi

Tudomanyegyetem

Pollack
Mihaly

Muszaki

Kar
’)



Department of Building Engineering (’
Epuletgepeszeti

Tanszek
’)




Supporting science research and diploma thesis works at


mechatronics

research



University of
Kaposvar
,
Faculty

of

Zoografic



(’
Kaposvari

Egyetem
Allatudományi

Kar’)






Supporting science research in the examination of animals


and animal therapy



The beginning of the science programs has proceeded recently, the achievements
of application can be prognosticated to the next year
.





4.
P
ossibilities

of economics and societal exploitation to the long term


W
e plan to exploit our
thermography

system, and to establish bilaterally
prosperous collaborations with industrial undertakings, medical and educational
institutes.


R
ealistically

possible applications of the procured technical equipment
:



thermografy

of
buildings



finding of errors of electricity, errors in building engineering



checking large systems of electricity (power
-
lines and installations)



support of undertakings using a unique and valuable machine



planned
,
preventive

service



monitoring a
procedure



support of spa and
orthopaedics



using a painless and alternative method of medical diagnostics



supporting

science

research

programs



audit of any kind of process of natural science which causes 0.03
°
C

temperature changing or difference
.




Thank you for your kind attention!


Investment Engineering and Principal Contractor Ltd.