Architektura ve stavebnictví

siennatearfulΠολεοδομικά Έργα

25 Νοε 2013 (πριν από 3 χρόνια και 11 μήνες)

93 εμφανίσεις


Tato prezentace je hrazena z projektu:

Spolupráce s partnery


základ
kvalitní odborné výuky


Registrační číslo: CZ.1.07/1.1.01/02.0033

The UP building

INTRODUCTION


It is located in Třebíč, Horka
-

Domky.


It comes from 1922


Josef Vaněk,

a businessman and architect, was a founder.


It is constructed in Rondocubism.


Josef Goč
á
r was its architect and designer


The building was used for furniture production

for 78 years.


Rondocubism
-

National Style


1918


Visiul plasticity


Geometrical shapes


Vaults and diagonals


Right angles rejected



Josef
Gočár

(1880
-

1945)



A Czech architect, one of the founders

of modern architecture.


styles:


Modernism

-

Wenke Department Store,
Jaroměř (1909


1911).


Cubism


House of the Black Madonna,
Celetná Street , Prague (1912) and
Bathhouse in Bohdaneč near Pardubice.


Rondocubism
-

Legiobanka in Prague,
Angrobanka in Hradec Králové.


Functionalism
-

District office building
and St. Wenceslas church, Vršovice,
Prague.


Who speaks a lot
,
feels no much


History of UP Works


1913
-

Josef Vaněk, jr. became a director,

the building was given its name.


Furniture making was the basis, but there
were also upholsters, painters, glaziers and
watchmakers.


The company got a good reputation.


1947
-

nationalization
-
> decline in the quality.


1968
-

UP Works became a part of

the Headquarters of Furniture industry

in Brno.


1991
-

joint
-
stock company Tusculum


2007
-

joint
-
stock company Jitona


The building


Four
-
storey building with a rectangular layout.


Main entrance is located in the northern part, there
are two steps.


Facade was planned to be blue
-
white
-
red

to symbolize the flag of the new Czechoslovak
Republic. However, it was never realized.


Building is divided into two parts.


Workshops

Reinforced concrete sceleton construction extended

with brickwork masonry.


Administrative part


Built with firebricks.


Interior


Basement: boiler room, warehouse


First floor: four rooms with accessories


Second floor: exhibition space


Third floor: working studio


There have been original door panels so far.


UP Works: Comparison of state

Past

Present

Facade colour

Pastel red

Ocher

Roof

Covered with wood
-
cement

Oil film strips

Main doors

Wooden doors with art
metal mounting

Simple wooden doors

with glass panels

Windows
1st+2nd floor

Double wooden framed
windows fitted into
reveals, divided into

a Latin cross

Double wooden

with a T shape

Windows
3rd+4th floor

Each half was divided
into a cross

Wooden windows divided
into a cross

Architectural elements


massive half
-
columns

at the front


facade (decorated

with cylindrical, circular or
semicircular elements)


relief sculptural decoration


broken cornice with three
half
-
cylindres


cornice above doors

with a span


massive entablature

with a broken rooftop ledge




View of UP Works

from the yard





Water tower





Workshops


Administrative part +
workshops

Current situation


Production was finished

in 2000.


Building has not been
used, it is breaking up.


It is worth more attention.


Gočár
´
s design is stored

in the archive of National
Technical Museum

in Prague.


Thank you for your attention.