EMMA



24
th

February 2009


ALICE Stakeholder Meeting


ALICE Stakeholder meeting
-

Feb 2009

IOT

Racks

EMMA Layout

ALICE Stakeholder meeting
-

Feb 2009

EMMA Infrastructure upgrade in progress in ALICE Accelerator Hall

ALICE Stakeholder meeting
-

Feb 2009

Injection Line Assembly in progress in S Block

ALICE Stakeholder meeting
-

Feb 2009

Integration

IOT Rack

ALICE

Diagnostics

Beamline

RF Distribution

ALICE Stakeholder meeting
-

Feb 2009

Aims & Objectives of EMMA Project

World’s first NS
-
FFAG (non
-
scaling Fixed Field Alternating Gradient)
accelerator


FFAG: Field fixed in time but varies across pipe





Nonscaling: Dipole field scales with momentum but focussing
quadrupole fields do not



Optics changes during acceleration


Betatron Tune changes during acceleration


Resonances unavoidable


But rapid acceleration means this is not fatal. (We hope)

ALICE Stakeholder meeting
-

Feb 2009

CONFORM

CONFORM
(
CO
nstruction of a
N
onscaling
F
Fag for
O
ncology,
R
esearch, and
M
edicine )
www.conform.ac.uk/



Total funds
£6.9m

over
4 year

project lifecycle from RCUK Basic
Technology from
1
st

April 2007


Led by
University of Manchester and The Cockcroft Institute


including RAL, JAI, and others. Also FNAL, Brookhaven, Grenoble


EMMA design and construction



PAMELA design study for hadron therap machine


Applications study for other applications


BASROC (B
ritish
A
ccelerator
S
cience and
R
adiation
O
ncology
C
onsortium)
umbrella group of academic,
medical and industry specialists in accelerator and
medical technology with the
aim of promoting the use of
accelerators in science, industry and medicine
.
www.basroc.org.uk/





ALICE Stakeholder meeting
-

Feb 2009

EMMA Basic Parameters

Energy range

10


20 MeV

Lattice

F/D Doublet

Circumference

16.6 m

No of cells

42

Normalised transverse acceptance

3
π

mm
-
mrad

Frequency (nominal)

1.3 GHz

No of RF cavities

19

Average beam current

13
μA

Repetition rate

1, 5, 10, 20 Hz

Bunch charge

16
-
32 pC single bunch

ALICE Stakeholder meeting
-

Feb 2009

Requirements


Full aperture injection and extraction at all energies 10


20 MeV



Many lattice re
-
tunings (vary ratio of dipole to quadrupole fields)



Vary frequency, amplitude and phase of RF cavities



Non
-
accelerated operation to map closed orbits and tunes vs
momentum



Map longitudinal and transverse acceptances with probe beam



To be heavily instrumented with beam diagnostics, etc.


ALICE Stakeholder meeting
-

Feb 2009


Ring Magnets

Requirements /

Solution


Adjust dipole & quadrupole components
independently
-

Mount magnets on independent
radial linear slides



Fields identical in every cell despite kickers and
septum
-

Field clamps at cell entrance face of QD
& exit face of QF. Adjusted at the factory




Very large good field region for range of closed
orbits
-

Optimised pole profile implemented


Due to extreme compactness of lattice, D & F magnets


Are in very close proximity. Consequence: field
computation and measurement with both magnets
in place has been essential. Results from the
prototype measurements have been implemented
in the lattice simulations


Are short compared with aperture. Consequence:
integrated strength is dominated by end
-
field
contributions

All magnets scheduled to be delivered
from TESLA by 10
th

April 2009

ALICE Stakeholder meeting
-

Feb 2009

RF Cavities

20 (19 + spare) production cavity construction in
progress


give fast acceleration



4 of 5 batches delivered to DL



5
th

batch


scans awaiting approval by DL

ALICE Stakeholder meeting
-

Feb 2009

Injection/Extraction Septum Design


In house design of septum and vacuum chamber in
progress


Wire eroding of lamination stacks is in progress. Delivery
scheduled for Feb


Mar 2009


Manufacture Misc. septum components Apr


May 2009


Magnet measurements scheduled for Jun 2009

Plan view of septum in vacuum chamber

Section view of septum in vacuum chamber

ISO view of septum with vacuum chamber removed

ALICE Stakeholder meeting
-

Feb 2009

Kicker Magnet Design

Ferrite CDM5005

C core

(Ceramic Magnetics, New Jersey)


Kicker component manufacture
by Brite Precision, Newbury


Ferrite blocks manufactured by
Ceramic Magnetics, New Jersey


Prototype kicker magnet
complete. Four production
devices to follow subject to
successful testing


Delivery to APP in early March to
be used as the test load for the
kicker power supplies


ALICE Stakeholder meeting
-

Feb 2009

Standard Ring Vacuum
Chamber

BPM Block


Contract placed for BPM
pickups with
Testbourne
.
Delivered November 2008


Contract placed with
VG
Scienta

for the vacuum
chambers. Manufacture in
progress


Batch Delivery


March 2009


Clean vacuum testing & RGA
cleanliness tests at the factory
before delivery to Daresbury


Particle processing at
Daresbury


ALICE Stakeholder meeting
-

Feb 2009

RF Distribution


Contact placed with Q
-
Par Angus in
Oct. 2008


Manufacture and testing in
progress


Delivery due end of March 2009


ALICE Stakeholder meeting
-

Feb 2009

RF Source


Inductive Output Tube


VIL409 90 kW Transmitter



Contact placed with CPI in Sep. 2008


Full testing at CPI before delivery


Delivery due end of March 2009


Commissioning at Daresbury in late
April


early May


ALICE Stakeholder meeting
-

Feb 2009

INJECTION LINE ALICE to EMMA

New Dipoles x 2 (33
°
)

& BPMs at dipole entrance

Position measurement

New Dipole 30
°

& BPMs at dipole entrance

Position measurement

BPM

Position

measurement

Wall Current
Monitor

New Quadrupoles x 13

Ion Pump

Vacuum
valve

Tomography Section

Screens x 3

(emittance measurement)

SRS Quadrupoles x 3

Screen &

Vert. Slit

SRS Quadrupoles x 2

Screen

Vacuum
valve

Screen

Emittance measurement

Combined H and V
Steering Magnet x 4

EMMA

Ring

ALICE


Match the probe beam
to the requirements of
EMMA


Measure the properties
of the probe beam

Vertical
Steering
Magnet x 2

Beam Dump

New
Dipole
30
°

ALICE Stakeholder meeting
-

Feb 2009

DIAGNOSTICS BEAMLINE LAYOUT

Spectrometer

BPM @ dipole entrance

Screen

Faraday Cup


E
-
O Monitor


Screen x 3

Tomography

Section


Wall Current Monitor


BPM &

Valve

SRS Quadrupoles x 6

New Quadrupoles x 4

ALICE

New Dipole (43
°
)

& BPMs at dipole entrance


Current measurement

Longitudinal profile

Position measurement

New Quadrupoles x 4

Screen

& Vert. Slit


Emittance measurement

Extracted momentum

Screen

Location for Transverse
Deflecting Cavity

(NOT IN BUDGET)

Combined Horizontal and
Vertical Steering Magnets x 4

Vertical
Steering
Magnet x 2

ALICE Stakeholder meeting
-

Feb 2009

Timescale for Installation

ALICE shutdown




25 Oct
-

21 Nov 2008


Complete

Diamond drilling of ALICE wall, cable tray installation


EMMA off line build of modules in S block


Nov 2008
-

Jul 2009


9 months


ALICE shutdown (In progress now)



23
nd

Feb
-

29
th

Mar 2009


5 weeks

EMMA Cable pull (90%) through external labyrinth, ALICE Dipole installation, Injection line girders through equipment
access doorway


EMMA installation in Accelerator Hall



Mar
-

Aug 2009


6 months


ALICE shutdown (dates to be confirmed)



8
th

Jun
-

13
th

Jul 2009


5 weeks

EMMA Cable pull through external labyrinth (10%), Controls cable pull through the control room labyrinth, Ring girder
installation through equipment access doorway (except Injection & Extraction girders)


Injection line complete ready for commissioning with electrons

19
th

Jul 2009


Test IOT





May 2009

Install RF waveguide distribution



Aug 2009

Commission RF




Sep 2009


EMMA Injection & extraction septum girder available for installation through equipment access doorway







end of Aug 2009


ALICE shutdown (dates to be confirmed)



15
th

Sep
-

15
th

Oct 2009


4 weeks


Test systems in Accelerator Hall



Sep
-

Oct 2009



2 months


Ring and phase 1 diagnostic beamline complete


31
st

Oct 2009


Commission with electrons starting



1
st

Nov 2009




ALICE Stakeholder meeting
-

Feb 2009

Summary


Design

phase and
Procurement

is well advanced with major
contracts placed


Major components started to arrive in November 2008, off
-
line build
is in progress


Access to ALICE accelerator Hall required for installation work


Shutdowns required to ALICE to open the cable route labyrinth


We aim to have the ALICE to EMMA Injection line ready for
commissioning with electrons by
19
th

July 2009


We aim to be ready for commissioning the EMMA ring with electrons
by
1
st

November 2009