PINTO Value Measurement

penredheadΔιαχείριση

18 Νοε 2013 (πριν από 3 χρόνια και 10 μήνες)

94 εμφανίσεις

PINTO Value Measurement

A Practical framework for measuring
the program value

“If we don’t know what we don’t
know, how could we know what we
need to know?”

CERA Study on Integrated Operation
Returns


Increase recovery from 0% up to 7%


Production increases between 1% and 10%


Operating cost reduction from 4% to 25%

CERA : Cambridge Energy Research

Increase Recovery might not be the case for PTTEP. Initially, we are
focused on the Operating Cost Reduction.

CERA’s IO Program Benefits

Source : IHS CERA Inc.

PINTO Program Components

1:
COLLABORATION
AND PROCESS

5:
Right
-
Time
DATA AND INFORMATION
MANAGEMENT

2: INTEGRATED
ASSET MANAGEMENT

3: MANAGEMENT
BY EXCEPTION

4: CENTERS OF
EXCELLENCE


Supporting growth


Standardization


Synergy between assets


Integrated Planning

PTTEP

Drivers

PINTO Benefits Logic

Business Workflow

Solution

Improvement

Benefits

Better

Cheaper

F
aster

Reduce CAPEX

Reduce OPEX

Increase Recovery

Improve SSHE

Reduce NPT

Reduced Logistics

Integrated Asset
Management

Improved Decision
Making

Quality Decision

Increase Availability

Increase Efficiency

Well Operation &
Optimization

Field Surveillance &
Reservoir
Management

Production Process
Operation & Facility
Integrity
Management

Collaborative Work
Environment

Rotating Equipment
Monitoring

Integrity Monitoring

Intelligent Wells

(
Downhole

Sensors
)

Field Surveillance &
Security System

Increase Production
Capability

Reduced Deferment

Visualization for Well
Surveillance

Increase Production

Fewer Development
Wells

Marine Vessel Visual
Simulation

Field Production
Optimization &
Integrated Production
Modeling*

Find Optimized
Production Opportunity

Improve Sweep

Real Time Information Infrastructure

Information Infrastructure


If we don’t have Infrastructure to gather data, vital information will be lost


DM is the hidden element. It provides the highway and interface to the
information we need.


Data historian give real
-
time data which is the life
-
blood of PINTO


Real
-
time data:


Carry out accurate daily hydrocarbon allocation on a daily basis (not month)


Accurately calibrate production models


Respond faster to problems by using exception
-
based analysis of data

Collaborative Work Environment


Facilitates good team work as well as better communication


Reduced number of visits required offshore


less bed space, less cost of
flights


Connecting experts from different part of the worlds


Solving problems
faster and quicker


Key Benefits: Faster, Cheaper, Better


Reduce elapsed time to reach the result


faster


Reduce amount of effort and number of man
-
hour involved


cheaper


Increased quality, reduce errors, improved performance


better

Target Study &
Identification

Reviews and Plan

Feed Back for
review & Re
-
plan

Team of
Geologist

Team of Drilling

Drill

Issues and

Constraints

Cleared?

Y

N











The re
-
iterative
process could take
weeks

Apply Collaborative
Environment

companies have been
using
collaboration

environments
to re
-
design
and speed up this process. The
geologist and
drilling teams work
together
in the same room with access
to all the information (
both geology
and
drilling systems) to agree the well path.
This can reduce the
time taken
to
design and agree a well path down to
less than half a day.

Collaboration
& Process
Optimization

Well Path
Planning

Logistic
Optimization

Integrated
Activity
Planning

Enhance
Collaborative
meeting

Improve
Modification
Request

Apply CWE to Drilling Collaboration Center