Hall A
Work Procedure

TITLE:




Hall A
FUG Transistor Bank Repair Procedure


ISSUING
AUTHORITY

AUTHOR

DATE

DOCUMENT ID

Page
1

of
2

Hall A

Fansler

2/27/2008

A
-
08
-
018
-
P






Hall A
FUG Transistor Bank Repair Procedure




Summary of job

This procedure is to remove and replace the
Transistor banks installed in the FUG power supplies.




Affected systems

FUG power supply


Task Hazard Analysis Worksheet


task

Potential Hazards

Ris
k Code

before
mitigation

Safe Procedures/Practices/Controls

Risk Code
after
mitigation

Transister bank
replacement/repair








Electrical shock




Radiation






4



3





Training, procedures, proper PPE

Applicable SOP’s, Lock tag and try


Training, pr
ocedures, proper PPb,
oadCon coverage, otP




1



1







List of PPE

Calorie Suit

Goggles

Gloves

Face shield

Misc. tools






Identify danger zones

(Areas where hazards can be encountered)




Number of people needed

2 techs





List of materials

New Transistor
s





Procedure





This document is controlled as an on line file. It may b
e printed but the print copy is not a controlled document. It
is the user’s responsibility to ensure that the document is the same revision as the current on line file. This

copy
was printed on
11/2/2013
.

Hall A
Work Procedure

TITLE:




Hall A
FUG Transistor Bank Repair Procedure


ISSUING
AUTHORITY

AUTHOR

DATE

DOCUMENT ID

Page
2

of
2

Hall A

Fansler

2/27/2008

A
-
08
-
018
-
P


Pre job briefing


Safe the FUG power supply in accordance with the applicable SOP.


Request clearance per general RWP.


Proceed in accordance with RADCON guidelines(to be determined based on test results).


Secure LCW supply and return to th
e appropriate power supply.


The following 10 steps will be repeated for all three transistor banks installed in the power supply.


Request clearance fro RADCON to d
rain water from
transistor bank LCW lines.


Remove and label all wiring/ connectors landed

on the transistor banks
.


Remove transistor bank from mounting brackets.


Obtain RADCON approval prior to removing banks from Hall A.


De
-
solder all transistors from each transistor bank.


Install new pre
-
tested transistors in transistor bank.


Clean all

electrical contacts (copper mounting brackets).


Remount the transistor bank in the power supply.


Re

connect the LCW lines.


Re
-
connect all wiring/connectors per labels installed at the time of removal.


Obtain a quality assurance check from another qu
alified technician.


Un secure the LCW supply and Return, check for leaks.


Return the power supply to operational status.


Test operate the power supply.






Post job briefing and cleanup

Dispose of removed

materials as per Radcon