163 RW DRBS RFP

middleweightscourgeΠολεοδομικά Έργα

29 Νοε 2013 (πριν από 3 χρόνια και 6 μήνες)

71 εμφανίσεις

163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
1

of
18

Southern California Logistics Airport


Victorville California


STATEMENT

OF
WORK


LRE
WAREHOUSE

SOUTHERN CALIFORNIA LOGISTICS AIRPORT,

VICTORVILLE
CA

SCLT

109080


C
alifornia Air National Guard

163 C
ivil Engineering Squadron

5237 Air Guard Way, Ste

23, Bldg 2276

March ARB, CA 92519

(909) 655
-
5456



1

GENERAL REQUIREM
E
NTS


1.1

PURPOSE

The purpose of this project is to provide professional design and construction services
necessary to provide a new, complete, and useable
Launch and Recovery
Element

Warehouse

for the 163d Reconnaissance Wing, located at
Southern California Logistics
Airport, Victorville C
A.


1.2

SCOPE


A

BUILDING

Provide a
10
,
000 SF pre
-
engineered
insulated
metal storage building with concrete
masonry
wai
n
scot

wall,
metal wall panels,
trans
lucent wall panels
,

and standing seam
roof. The building includes overhead coiling
doors,

man doors, concrete foundation,
mechanical

room for
fire sprinkler
system
and alarm systems, mechanical ventilation,
convenience power,
and interior and exterior lig
hting.


B

SITE

Site work includes concrete and asphalt paving, base, chain link fencing and gates.
Utilities include power and water.


C

OPTIONS

Options include paving

areas
,
fencing, and
insulated

building

panels.


1.3

APPLICABLE CODES


A

Project shall be design
ed

and constructed in compliance with the following codes:


1

2010 Title 24 California Code of Regulations with Amendments
.


a

Part 2

California Building Code

b

Part 3

California Electrical Code

c

Part 4

California Mechanical Code

d

Part 5

California
Plumbing

Code

e

Part 6

California Energy Code

f

Part 9

California Fire Code

g

Part 11

California Green Building Standards Code


2

29 CFR 1910

Occupational Safety and Health Standards, as a work place.


163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
2

of
18

Southern California Logistics Airport


Victorville California


B

Non
-
Regulatory Criteria Documents: In addition to specific regulatory requi
rements, the
following documents are also incorporated into the definition of "the code" for the
purposes of this project, except for administrative provisions contained therein; where
referenced, the role of the code official described in the document wil
l be performed by
Government.


1

National Fire Protection Association
.


a

NFPA 13
-
2007, Standard for the Installation of Sprinkler Systems

b

NFPA 20
-
2007, Standard for the installation of Pumps for Fire Protection

c

NFPA 70, National Electrical Code, 200
8

d

NFPA 72
-
20
1
0, National Fire Alarm Code

e

NFPA 101
-
200
9
, Life Safety Code.


2

Department of Defense, Unified Facility Criteria (UFC).


a

UFC 1
-
200
-
01,
16 Aug 2010
, Design:

General Building Requirements

b

UFC 3
-
2
1
0
-
01,
15 Nov 2010,
Low Impact Development
,
Eisa Section 438

c

UFC 3
-
600
-
01,
July 2009
, Fire Protection Engineering for Facilities

d

UFC 4
-
010
-
01, 08 Oct 2003, DoD Minimum Antiterrorism Standards for
Buildings, Includes Change 1.


3

American Society of Civil Engineers
-

ASCE
/SEI

7
-
1
0, Minimum Design Loads for
Buildings and

Other Structures, 20
10

4

ASHRAE Standard 62.1
-
20
10
, Ventilation for Acceptable Indoor Air Quality

5

ASHRAE Standard 90.1
-
20
10
, Energy Standards for Buildings except Low Rise
Residential Buildings

6

American Institute of Steel Construction,
AISC
Manual of Steel Construction
14th
Edition,
2010

7

ANG ETL 90
-
9

8

ANG ETL 07
-
6

9

ANG
ETL 01
-
01
-
1 Design Guide

including Com Policy dated June 2006


10

Air Force Standards


1.4

PROPOSAL SU
B
MISSION REQUIREMENTS

Contractor
shall
p
rovide a detail narrative explaining how t
he proposed structure meets,
exceed
s

or deviates from the
design

criteria provided.


1.5

AWARD

Contract award shall be made to the contractor offering the best value in response to the
stated Government requirement. The government will evaluate the quality of

the proposed
structure, considering compliance with the stated performance requirements, deviations from
any of the performance or facility requirements based on stated funding limitations, extent of
the overall facility warranties to include facility str
ucture and roof warranties, equipment
warranties etc. Contractors are encouraged to present any information they believe enhances
the quality and overall value of their proposal
.



163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
3

of
18

Southern California Logistics Airport


Victorville California


1.6

PRICING:

Includes Payment and Performance Bonds


A

CLIN 1

Design

& Construct
ion

B

CLIN 2

AC
Paving

Option

1

C

CLIN 3

AC
Paving

Option
2

D

CLIN
4

Insulated
Wall

Panels

&

Insulated Translucent Wall Panels


2

GENERAL CONDITIONS


2.1

APPROVALS
:
Obtain
environmental approvals
prior to start of construction. Approval will be
processed thru the 163

CES
.


A

SWPPP
.

B

EISA 483 (Energy Independence and Security Act)
.


1

CEV Form 438.

2

Post Construction Water Balance Calculator.

3

The EISA 438 requirements

may be incorporated in the SWPPP permit
requirements by the time of construction. If so, a

separate approval will not be
required.


C

Dig Permit.


2.2

UTILITY CONNECTIONS

ALLOWANCE

Contractor shall be responsible to connect water and electric service to existing points of
connection.


2.3

PROJECT CLEANUP

Construction debris will be removed on a daily bas
is. Prior to final acceptance, contractor
shall remove all waste materials and debris arising from construction and shall present all
construction areas in a broom clean condition.


2.4

CHANGES

All work shall be completed in a workmanlike manner according to
generally accepted
standard practices. Any alteration, or deviation from the drawings/specifications or contract
involving extra costs or credits, will be executed as mutually agreed upon and be verified by
written change order.


2.5

TEMPORARY FACILITIES

Prov
ide temporary electrical telephone, water, and power as required to perform the work.


2.6

WARRANTEE

Contractor shall guarantee the material and workmanship for one (1) year following the date of
substantial completion. Substantial completion is defined as
completed to a point where the
owner is able to beneficially occupy the building. Equipment warranties are limited to original
OEM warranties.



163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
4

of
18

Southern California Logistics Airport


Victorville California


3

DESIGN SERVICES


3.1

PLANS

Contractor shall furnish all engineering and design services required to develop and su
bmit
construction plans. All plans and reports shall be stamped and signed by the respective
California licensed professional. All design shall be in conformance with

respective codes
identified
herein
and with
industry standards and practices.


A

Geotechni
cal Report.

B

Hydrology Report

C

Grading Plans

D

Erosion Control Plan

E

Storm Water Pollution Prevention Plan

F

Utility Plans

G

Foundation Plans

H

Pre
-
engineered Metal Building Plans

and Calculations

I

Architectural Plans

J

Electrical Plans

K

Mechanical Plans

L

Fire Protection
Plans

M

As
-
Built Plans


3.2

SPECIFICATIONS

Project specifications
may

be included on the plans.

A

separate specification book
is
not
required
.


3.3

SUBMITTALS

Contractor shall submit for approval, design drawings at 35%, 95%, and 100% completion in
PDF format. Final As Built drawings shall be submitted in Autocad, PDF, and full and half size
bond

sets.


A

35% design submittal shall
include all preliminary design including
storm drainage and
paving
.

This submittal shall require approval along with limited notices to proceed in
order to maintain the project schedule and completion date.

B

95% design submittal shall include PDF “cut shee
ts” or technical data on material and
equipment not specifically addressed on the drawings. Cut sheets will be incorporated
into final O&M manuals as applicable.

C

100% submittal shall incorporate any review comments from the 95% submittal.

D

As
-
Built plans s
hall include the actual construction of the project incorporating the
construction mark
-
up set.


3.4

SCHEDULE

The
Contractor shall have 480 calendar days to design and construct the project
.


This
schedule is for both the LRE Warehouse and the DBRS Storage
Fac
ility
projects.


A

DESIGN

The
C
ontractor shall have 1
2
0

calendar days after award to prepare drawings and
specifications.

Each
submittal
phase below
include
s

a
14 day
Government
review
period.

Contactor may submit an accelerated schedule at bid, not alteri
ng the review
period lengths.


163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
5

of
18

Southern California Logistics Airport


Victorville California


1

35% Submittal

6
2

Days

2

95% Submittal

3
2

Days

3

100% Submittal

2
6

Days


B

CONSTRUCTION

The
C
ontractor shall have 360 calendar days after approval of design to
s
ubstantially
c
omplete the
p
roject.
P
rovide

Critical Path
Method s
chedu
le based on the outline
schedule submitted at bid.


3.5

GEOTECHNICAL

REPORT

Provide a Geotechnical Report to establish recommendations for foundation and paving
design
.


A

For bidding
use

the recommendations of the provided geotechnical report of the adjacent
hanger site
.


3.6

MINIMUM
DESIGN
REQUIREMENTS

Provide the minimum
design
requirements as indic
a
ted in the following specifications unless
more restrictive requirements are discove
re
d during the design process
.


A

Specific manufacturers listed are for quality.

C
ontractor may submit or equal product for
acceptance
.

B

Co
mply

with the Cal Green Code

for the following items.


1

Low Emitting Materials including adhesives, sealants and paints.

2

Recycled content of materials.

3

Construction waste.


3.7

EQUIPMENT

The equipment list
ed is provided to assist in structural
design
and fire protection design.


A

RACK EQUIPMENT


1

(12) MQ
-
1
Aircraft
Containers: 2500 lb ea (5’x5’x30’). The

container will be stored 3
high in (4)
rack
s

with overall maximum height of 20 feet.

The r
ack is 25’ long with
(5) 6’
deep

double C channels as a base.

The aircraft does not contain fuel.

2

(72) Aircraft Equipment Containers: The containers will be stored
2 high in (12)
racks with overall height of 12’. The rack is 9’ long and 4’ deep
.
Weight i
s similar to
the aircraft containers.


B

MOBILE EQUIPMENT

The
following
mobile equipment contains diesel fuel.


1

(4)

MEP
-
806B G
enerators


43

gallons
ea
ch

2

(4)


H1 H
eaters



35

gallons each

3

(2)


MC
-
2A C
ompressors


0
5

gallons each

4

(1)


MC
-
7 C
ompressors


27

gallons

ea
ch

5

(1)


SGNSC N
itrogen Cart


16

gallons each

6

(4)

FL
-
1D L
ight Cart


14

gallons each

7

(1)

A
ir Rover A/C Cart


42

gallons each

8

(1)
2
6k Side Loading Fork Lift

40

gallons each

9

(1)
6
k

All Terrain Fork Lift


30

gallons each



163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
6

of
18

Southern California Logistics Airport


Victorville California


C

NON
-
POWERED EQUIPMENT


1

S
upport
S
tands

2

Hoists

3

Wing Stands

4

Jacks



4

S
ITEWORK


4.1

CONSTRUCTION SURVEY

Contractor shall lay
-
out all areas of construction in conformance with the project drawings.
E
stablish building corners in accordance with latest approved plan to assure proper lay
-
out.
U
tilize existing plans and benchmarks as a basis for construction layout
.


4.2

DEMOLITION

Remove
chain link fencing as shown on the plans

and AC pacing as required
.


4.3

C
LEARING

Clear and grub site as required.


4.4

GRADING


A

Building Pad:
S
ubgrade
at building pad

shall be over excavated by 24 inches
minimum
and recompacted to 95%

relative density
.

B

Site grading shall be 2% for first 10 feet away
from building
and 1% minimum to
2
%
maximum beyond.
G
rad
ing design shall insure appropriate drainage of property
.


1

Preliminary topography grades
are
shown on drawings for bidding purpose only
.

2

The location of the proposed detention basin as shown on the drawings is required
to maximize t
he future usability of the site.


C

Provide b
alance
d

site as
feasible
. Cut and fill material will be available at adjacent pit
.

D

Provide
an
Erosion Control Plan
.

E

Provide
a
Storm Water Pollution Prevention Plan (SWPPP)
.


1

Contractor shall prepare the permit registration documents, pay the required fees
and submit the documents to the COR. When the documents are
accepted
, March
ARB will submit the permit application documents.

2

Contractor shall amend the SWPPP as required to

maintain a current SWPPP
document. The contractor shall keep the SWPPP at the job site and strictly adhere
to its provisions.

3

If it can be shown on the drawings that the disturbed area is less than an acre, a
Storm Water Management Plan is needed, but no

permit is required. To support the
Storm Water Management Plan, provide the following:


a

A calculation of the “disturbed area”
-

A cumulative calculation of all areas of
land to be disturbed must be determined and documented prior to any
disturbance of s
oil
-
groundbreaking, clearing, excavation, mobilization onto the
equipment lay down area, or project trailer placement.

b

Show storm water control best management practices i.e. protecting storm
drains, silt fences around the construction site, etc.



163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
7

of
18

Southern California Logistics Airport


Victorville California


4.5

AGGREGA
TE BASE


A

Provide

minimum 12

inch

deep Class 2 aggregate base under building pad

and Portland
cement paving
.

B

See Asphalt Paving below for
base

requirements as asphalt. If
AC
paving
o
ption
s are

not
exercised base shall be flush with
PCC paving
.

C

Provide 2”
de
ep
of base between AC paving limit and fencing.


4.6

PORTLAND CEMENT PAVING

Provide PCC aprons and landings

as shown on drawings
.


A

Design:

Paving shall
b
e
minimum 4,000 psi and
minimum
6 inches thick with #
5

rebar at
18

inches
on center
.

B

Expansion Joints:

Provide
3/8 inch
expansion joint a
djacent
t
o

building

as per slab
requirements
.

C

Finish:


Light

Broom

D

Curing and Hardener:

Per slab requirements.

E

PCC curb and gutter and
V

channel
shall

match existing

as shown on plans
.

Provide
dowel connect to existing
PCC curb and gutter.


4.7

ASPHALT PAVING

Provide
AC paving as shown on drawings
.

Design paving per Caltrans Standards

Provide
Permaloc AsphaltEdge flexible aluminum asphalt restraint at edges.
AC paving shall be flush
with PCC paving.


A

Heavy Duty Paving:
Provide
minimum 2 inch bituminous surface course over tack coat
over 4 inch bituminous
intermediate
course over
bituminous prime coat over
8 inch
crushed rock over 12 inches compacted subgrade

98%
.


Sawcut
existing ac paved road
and tie
to
new
paved road a
s required

grinding existing paving down 1 inch by 12 inch
paving overlap.


B

Medium Duty Paving:
Provide
minimum 2 inch bituminous surface course over
bituminous prime coat over
6

inch crushed rock over 12 inches compacted subgrade
98%.
Sawcut
existing ac

paved road
and tie to
new
paved road as required.
Provide
minimum 2 inch bituminous surface course over 4 inch bituminous course over 8 inches
crushed rock over 12 inches compacted subgrade 26 inch deep Class 2 base under
medium duty asphalt and adjacent P
CC paving
.


If AC paving
options are

not exercised
base shall be flush with PCC paving

1

OPTION
-

CLIN 2: Area 1

a
s
identified o
n

the drawings.


a

Note that CLIN 1 is base only per 4.5.


2

OPTION
-

CLIN 3: Area 2

a
s identified on the drawings.


a

Note that CLIN
1 is base only per 4.5.


4.8

S
TORM DRAINAGE

S
ite drainage

should

be accomplished through surface contour grading

unless more elaborate
means is required by design requirements
.

Permanent storm water control features will be
required to meet SWPPP and EISA 438 requirements.

Comply with storm water management
at existing ditch per attached drawings.


163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
8

of
18

Southern California Logistics Airport


Victorville California


A

Include all inspection and maintenance requirements for the permanent storm wate
r
control features in the drawings. This information will be required for the life of the
facility.

B

Include the pre and post construction hydrology conditions (i.e., runoff volume, rate,
quality, etc.) on the drawings.


4.9

SITE UTILITIES


A

Contractor
shall

pr
ovide the following site utilities

per City of Victorville Standards

and
attached drawings
.


1

Provide magnetic warning tape at a
ll underground utilities
.


B

ELECTRICAL SERVICE


1

Contractor shall
provide manhole at
existing (
2
) 4 inch
power conduits
and extend
4”
conduits
to
panel in
facility as shown on drawings.


a

Existing conduit is under and approximately 10 feet back from edge of heavy
duty
ac
paving

per 4.7.

b

Connect power conductors to existing
400 amp distribution
panel

LDP located
in Hangar electrical room

as shown on drawings
.


C

TELECOM SERVICE



1

Provide conduits into facility as shown on drawings.


a

Existing conduit is under and approximately 10 feet back from edge of heavy
duty ac paving per 4.7.

b

All changes in
direction shall use 36 inch 90 degree sweeps.




Maximum 3 sweeps allowed without a manhole or handhole.


c

Provide Maxcell sleeving in existing and new conduit.


2

Provide fiber, components and connections for complete system.



a

Fiber shall be components
12

s
trand 50 micron single mode fiber
communication cables.

b

Provide fiber and from patch panel to rack in Communications Room in Hanger
B888.

c

Patch panel and connectors shall be by same manufacturer as manufactured
by Panduit, Systemax, or equal.

d

Install cab
le in one of the newly Maxcell sleeves.


3

Provide
25

pair copper cable, components, and connections for complete system.


a

Provide cable terminated in Hangar B888 into building communications
backboard location.

b

Install cable in one of the Maxcell sleeves.


D

FIRE ALARM

Provide conduit to BDOC (NIC) POC.


163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
9

of
18

Southern California Logistics Airport


Victorville California


E

WATER SERVICE


1

The e
xisting water

service connection is on site as shown on the drawings.
Devices,
w
ater supply
,

connection
,

and construction shall comply with
City of Victorville Water

District standards.

Devices shall be tested and approved before acceptance by the
Government
.


a

Fire Water:

Provide
6

inch

fire

line tap

to
10

inch
fire
water
as shown on plans
.

b

Domestic Water:
Provide
1

inch domestic water line tap to existing
2

inch
water

as shown on drawi
ngs
.

c

Cap and abandon or demolish as required
4”
city waterline and fire hydrant

and
provide new hydrant
outside property as shown on drawings
.




Install 4”x4” hot tap, 4”x6” reducer, 6 linear feet of 6” fire hydrant water line
and fire hydrant assembly per
City Victorville Standard W
-
21 & W
-
11.



Demo fire hydrant after new hydrant is installed.



Verify location of hydrant with city.



Submit
plans for city approval and inspection
s
.


F

SEWER

Establish flow elevations of sewer line to BDOC (NIC). Connect to
existing onsite sewer
line and
extend as shown.


4.10

LAY DOWN AREA

Identify limit of lay down area adjacent to the construction site.


4.11

FENCING AND GATES


A

P
rovide
8
-
foot high galvanized chain link fencing
and gates
with additional 1 foot high of 3
strand barbed wire
enclosing site as shown on drawings.


1

Reuse chain link mesh from recently completed Hangar project as shown on
drawings.


2

Design in compliance with Federal Standard RR
-
F
-
191.


a

Mesh: 9 gage 2 inch Class 1
Grade A galvanized mesh.

Match existing.

b

Ties and Rings: 9 gage galvanized steel wire.

c

7 gage galvanized steel tension wires

d

Posts and Top Rail: Class 1 Grade A schedule 40 galvanized steel pipe.




Top Rail.1
-
5/8 inch top rail.


3

Design concrete footings
in compliance with the Standard Specifications for Public
Works Construction.


4

Provide ca
ntilever gate

for 24 foot clear opening as shown on drawings.


163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
10

of
18

Southern California Logistics Airport


Victorville California


a

Provide Elite SL3000UL with 1/2 hp chain driven motor
.

b

Provide Linear AK11 keypad on motor side post
below Knox box key switch
and wire both to motor.

c

Provide additional key pad insi
de building at latch side of
nearest
man door.

d

Provide free exit loop with safety loops.

e

Provide engineered calculations for supports and concrete foundation.


4.12

BOLLARDS

Typica
l of
10

as shown on drawings.


A

Provide 4 foot high 6 inch diameter concrete filled steel bollards with yellow plastic
protective sleeves
embedded in a minimum 18 inch diameter by 3 feet deep concrete
footing.


B

Locate
on each side of two overhead coiling do
ors, each building corner,
and t
wo

at the
fire hydrant
.



5

CONCRETE

FOUNDATION

See 3.7 for equipment specifications.


5.1

STRENGTH

Concrete shall have a minimum compressive strength of 4,000 p
si

at 28 days. Provide
concrete testing as required.


5.2

FOUNDATION

Provide substructure and foundation as required to support the completed and occupied
building safely and without uncontrolled subsidence or other movement.


5.3

SLAB


A

Minimum Design:
Slab on grade shall be a minimum six inches thick with
#5 rebar at 1
8

inches on center
spacing allowing for walk between during pour.


1

No welded wire mesh permitted.

2

Slab thickness shall accommodate the anchor bolt depth required to secure the
racks.


B

Vapor barrier: Stego Wrap 15 millimeter, .01 perm, Class A puncture resi
stance.

C

Finish:

Slab shall
have a
smooth

trowel
finish
.

D

Curing
:

Cure slab for minimum 14 days using

plastic membrane, water cure or L&M non
residual curing compound.

Do not use membrane curing compound.

E

Hardener:

S
eal
slab
with L&M Seal
H
ard chemically
hardene
d

de
n
sifier
.


5.4

JOINTS


A

Con
trol Joints: Concr
ete
control
joints
shall be Sofcut
minimum 1/3 of slab thickness
.


Design slab to minimize joints as shown on plan per ACI recommendations
.

B

Expansion Joints:
Provide

3
/
8

inch wide

closed cell neoprene
expansion

joint
between
slab and
concrete
masonry
wall

and
between
slab

and concrete apron.

After concrete
has cured remove neoprene and
fill
joint

1 inch deep
with
joint filler
.

C

Joint Filler:

Provide L&M Joint Tite 750 polyurea filler for control, const
ruction joints, and
expansion joints.


163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
11

of
18

Southern California Logistics Airport


Victorville California



6

HOLLOW CONCRETE MASONRY UNITS


6.1

DESIGN

Provide 4 foot high solid grouted and steel reinforced CMU wall as building base

wainscot
.
Units shall be 8 inch wide medium weight in
Orco Orange County warm

grey

color
.


6.2

BANDI
NG

Provide banding design alternating 8 inch and 4 inch rows

with 8” top lintel band for louver
opening
.


A

8 inch bands shall be factory bead blast finish.

B

4 inch bands shall be precision finish.


6.3

Seal masonry with Aqu
a
fin

CS/250 VOC compliant clear acrylic

sealer.



7

INSULATION


7.1

W
ALL INSULATION


A

EnergyCraft
Insulation
System by
Thermal Design Inc.


1

Fast R
insulation hangars.

2

Quik
-
Stop Thermal Break Tape applied at between framing
and the wall panels
.

3

4
.5

mil Vapor Barrier Fabric.

4

R
-
25

formaldehyde free
unfaced batt
unfaced batt
insulation
.

5

White steel straps fastened to framing.


B

See option for insulated metal
wall
panels.


7.2

R
OOF INSULATION


A

Simple Saver
Insulation
System by
Thermal Design Inc
.


1

White steel straps fastened to framing
.

2

Syseal FP White fabr
ic woven reinforced polyethylene film
.

3

D
ouble layer
formaldehyde free unfaced batt
:
R
-
19

in cavity and R13 over framing
perpendicular
creating
thermal break.


B

See option for insulated metal
roof
panels.


7.3

INTERIOR
LIGHT GAGE
M
ETAL
FRAMING

I
NSULATION

R13
in metal studs and ceiling joists at
Mechanical R
oom
.



8

DOORS


8.1

HOLLOW METAL DOORS AND FRAMES


A

Door
Type: Dominion Advantage,
Preassembled 18

gage

galvaneal

insulated hollow
metal with 1
6

gage
full depth
frame

and subframe
,
and
gray finish
.


163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
12

of
18

Southern California Logistics Airport


Victorville California


1

Single Doors:

3’
-
0” x 7’
-
0. Typical of
3

2

Double Doors:

Pair 3’
-
0” x 7’
-
0. Typical of
2


B

Hardware
-

General:
Exterior grade, 6
26

or 630

finish, lever handles,
Grade 1
heavy
duty mortise locks,
mortise exit device
s
, heavy duty closers with hold open feature, ball
bear
ing hinges, 7

inches by

1 /2 inch

aluminum saddle threshold tight notch fit at jambs,
weather stripping

integral with frame.


1

Locks
shall

acc
ept

Government provided Schlage
l
ock
c
ores
.

2

Exterior access shall comply with ADA access requirements and all
exiting and life
safety requirements in accordance with NFPA 101.


Doors and windows are not
required to comply with ATFP requirements.

3

Single Door:

Provide mortise panic hardware

at 2 exit doors, and mortise latch at
Mechanical Room
.

4

Double Door:

Provid
e mortise latch

and Z style astragal
.


8.2

O
VERHEAD COILING DOORS


A

Provide two 1
8

foot

wide by 1
6

foot

high, electrically operated/remotely controlled,
insulated heavy duty overhead coiling doors with baffle.


1

Overhead Door Corporation 625 series with RHX
electric operator
.


a

G
alvanized and factory pre
-
finished manufacturer’s standard
gray color
.

b

Operation of door shall require operator to hold the close button.


Location of
switch
is
shown on the drawings.

c

Provide keypad with key override for Fire Department access.

Key located in
Knox Box.



9

FINISHES


9.1

LIGHT GAGE
M
ETAL FRAMING
,

DRYWALL
, AND ROUGH CARPENTRY


A

Mechanical

Room shall be
one
-
hour fire resistive construction
.

Provide fire rated
penetrations.

B

Me
ta
l Framing: Studs and joists shall be 20 gage Clark Dietr
i
c
h

ProStud.

C

Wall Board: Provide 5/8 inch thick gypsum board
water
resistant panels with level 4
finish.

D

3/ 4 inch thick C/D plugged Exposure 1 plywood secured to framing.


1

Provide on top of wall board lid of
Mechanical Room
.

2

Provide in
Mechanical
Room
as

Com
munications
backboard.


9.2

B
ASE

Provide grey rubber base at
wall board

m
atching frame color.


9.3

P
AINTING


A

High Performance Coating:
Precision Coating
, Springfield MO.


Spray
a
pply to h
ollow
metal doors and frames.


Color to match overhead coiling door.


P
rimer and finish
are
acceptable for interior and exterior use
in the South Coast Air Quality Management
District.


163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
13

of
18

Southern California Logistics Airport


Victorville California


1

Primer:

DTM 1300

in 3 mil DFT thickness.

2

Finish: PC3v100
in 3 mil DFT thickness.


B

Acrylic Interior:
D
rywall shall
be
primed and satin finish paint
ed
in white
.



10

ACCESSORIES


10.1

LOUVERS


A

Provide
Architectural Louvers Model E2KS
,

2” thick
aluminum
fixed blade
louvers
in
Kynar

finish.


1

All louvers shall be the same size.

Louver size shall
accommodate the
specified
exhaust fan free area requirement.

2

Locate
at low and high locations to provide convectional cross ventilation

as shown
on drawings
.

3

Provide aluminum
expanded metal
bird screen
s.

4

High louvers
shall

incorporate exhaust fans

and
provide
natural

ventila
tion
.


a

Color shall match wall panels.


5

Low louvers recessed in
exterior
CMU flush with interior face of wall.


a

Color shall match door color.


10.2

SIGNAGE


A

Signs shall be aluminum with po
wder coat paint finish. Text shall be Ariel font. Secure
signs in weather tight fashion.


1

Building Sign: Provide four individual aluminum numbers 9 inches high by 1 inch
deep.

C
olor to match doors.

2

Mechanical Room

Sign:


Provide
sign with 2 inch letters

MECHANICAL

ROOM” in
text to match door color and white background.

Mount adjacent to door.

3

F
ire
D
epartment Connection Sign
:

Provide
8 inch by 8 inch
exterior
aluminum
fabricated sign
with 6

in
c
h
high red
Arial text

“FDC”
with
no
border on white
background.


10.3

FIRE EXTINGUISHERS

Provide (2) 10
A
BC fire extinguisher
s

with surface mount bracket as located on drawings.


10.4

KNOX BOX

Provide
City of Victorville Fire Department

approved
Knox Box
3502
mounted at
above key
pad

on
motor
side post of electric
gate.


Box
shall
include building master key and gate switch.


10.5

SPLASHBLOCKS

Provide precast concrete splashblocks in natural grey color at downspouts.



11

P
RE
-
E
NGINEERED METAL BUILDING

SYSTEM


11.1

QUALIFICATION
S


163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
14

of
18

Southern California Logistics Airport


Victorville California


A

The manufacturer of the pre
-
engineered metal building system shall have a minimum of 7
years experience in the design and manufacturing process of pre
-
engineered metal
buildings and be a member of the Metal Building Manufacturers Association (MBMA).

B

The er
ector shall have a minimum of 5 years experience in the erection of the type of
building system.


11.2

DESIGN


A

Provide a pre
-
engineered metal building including trim

and all components
.


1

See drawings for dimensional plans

and

elevations.

2

Provide gutter and downspouts. Locate downspouts away from building corners at
locations
shown on drawings.


B

Exposed trim and components
.


1

No exposed fasteners permitted.

2

Fabricated matching wall and roof material finish.

3

Use
of
color matched pop rivets i
s required
.


C

The design of the structural system shall be a clear span rigid frame with tapered
columns and tapered roof beams; with a
single

slope roof.

D

Structural steel sections and weld plate members shall be designed in accordance with
latest edition o
f the AISC Steel Construction Manual, “Specifications for the Design,
Fabrication, and Erection of Structural Steel for Buildings”.

E

All light gage cold formed, structural members and exterior covering shall be designed in
accordance with the latest edition

of the AISI Steel Construction Manual, “Specification
for the Design of Light Gage Cold Formed Steel Structural Members”
.

F

All framing shall be designed in accordance with MBMA, “Recommended Design
Practices Manual”.

G

Shop drawings shall include structural
design
and
all flashing and trim details.

H

D
esign framing for all effects of wind and dead loads including catenary forces
.


11.3

L
OADING

The roof shall be designed for live load and wind load as per local code state and federal
codes.


A

Roof Live Load:

20 psf

B

Wind Load:

90 mph Exposure C

C

Seismic Zone:

4

D

Building Code

CBC 2010


11.4

METAL ROOF PANEL

SYSTEM


A

AEP Span
Seam
: Full length panels, no spliced permitted, no exposed faster
s,
24 gauge
,

180 degree
mechanical standing seam
.

Field touch
-
up is not permitted. Fabricate all
roofing components from same coil coated material.


1

Low Eave:
Floating
Detail SP
S
-
6
.


a

Provide clean edge
that
allows for expansion and
c
ontraction of

roof panels.

b

Provide continuous cleat option for no exp
osed fasteners matching rake detail.


163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
15

of
18

Southern California Logistics Airport


Victorville California


2

High Eave:
Fixed
D
etail
SPS
-
12
.


a

Provide vertical eave trim in same plane as wall panel matching to rake detail.

b

Provide continuous cleat option for no exposed fasteners matching rake detail
.

c

Provide single piece flas
hing matching rake
profile
.


3

Rake:

Gable Detail SPS
-
8
.


a

Provide

single
piece flashing
flush with wall panel
and
continuous cleat for no
exposed fasteners.


4

Finish: Duratech 5000:
70 percent Kynar 500 or Hylar

500
0

consisting of a baked
on corrosion resistant primer and baked on finish coat from 1.1 to 1.4 mil DFT.

Color shall be
Re
g
al White

with an
SRI of
85
.


B

Warrantee:

Provide manufacturers 20
year no dollar limit for full roofing system
against
leaks and other

defects per ANG ETL 01
-
01
-
1.


11.5

M
ETAL WALL PANELS


A

AEP Span SuperSpan

Metal Wall Panels
:

2
4

gauge thru fastened

panel
s
, field touch
-
up
is not
permitted
.


Fabricate all roofing components from same coil coated material.


1

Exterior Panel Finish:
Duratech 500
0
:

70 percent Kynar 500 or Hylar 500
consisting of a baked on .2 mil corrosion resistant primer and baked on .8 mil finish
coat DFT. Color shall be Regal White with an SRI of 85.
Parchment color
.

2

Provide
full
h
ei
gh
t

to roof
interior wall panels in
Dura
T
ech 5000
polyester
Regal
White
.


B

OPTION
-

CLIN
4
:

Insulated Metal Wall Panels
.


1

MetlSpan
CF42 Striated

Profile
Insulated Metal Wall Panels
.
Concealed fastener

24
gauge exterior/26 gauge interior,
R
-
19,
in s
imilar
exterior finish and color
.

2

This replaces
exterior and interior wall panels
, and batt insulation.


11.6

T
RANSLUCENT WALL PANELS


A

UV
r
esistant
t
ranslucent panel
shall
match wall profile in clear color finish.


1

Provide at both interior and exterior wall faces
.

2

Locate panels
continuous along eave
s

as shown on drawings.


B

OPTION
-

CLIN
4
:
Insulated Translucent Wall Panels
.


1

Provide Kalwall t
ranslucent structural sandwich panel instead of acrylic exterior and
interior
translucent wall
panels.

2

Frame openings as required.


11.7

OVERHEAD COILING DOOR
STRUCTU
RAL FRAMING

P
rovide structural tube frames around overhead doors.
C
old
-
formed channel jambs are not
allowed.
Framing shall be gray color primer.


11.8

INSULATED TRANSLUCENT PANEL FRAMING

Provide structural framing as required to support insulated translucent
panels option CLIN 5.

163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
16

of
18

Southern California Logistics Airport


Victorville California




12

MECHANICAL


12.1

E
XHAUST FANS


A

Provide two Fantech FADE 25

Axial Fan
s
, type A blades, low noise 14.8 sones, 6557 cfm
@ .25 inch static pressure.

B

Fabricate shroud to accommodate louver. Louver shall naturally vent with fan turned off.

C

Fans shall be manually controlled
with 1 hour tier located adjacent to south light switch.


12.2

P
LUMBING


A

Provide
hose bibs with pipe running inside CMU wall
.


1

Provide Zurn model 195 hose bib.

2

Provide at 24 inches high as l
ocate
d

on drawings
.


12.3

F
IRE SPRINKLER
SYSTEM


A

Contractor will furnish and install and wet
-
pipe sprinkler system including all galvanized
piping, heads, controls and riser in accordance with code requirements.


1

Riser shall be located in mechanical room as shown on drawings.

2

The
fire department
connection shall be installed on the face of the building

s shown
on the drawings

per City of Victorville Fire Department.

3

The glycol system is not acceptable.

4

See
3.7 for equipment stored inside building
.



13

ELECTRICAL


13.1

PANEL

Provide
1
00
a
mp
three
phase
4 wire 60
Hz

power panel with main breaker

as shown on
drawings
.


13.2

CONDUIT

Conceal conduit
in
between interior and exterior metal panels.

No exposed conduit on interior
or exterior walls.

Size shall be 3 /4 inch minimum.


13.3

DEVICES

Provide decora

style black heavy duty power receptacle and light switches with stainless steel
cover plates.


13.4

LIGHTING


A

Interior Lighting


1

H
ig
h
bay interior induction lighting.


163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
17

of
18

Southern California Logistics Airport


Victorville California


a

Enduraline
model
I
C
HB
-
2
00
-
UNV
-
50
-
WH
-
C22
.

b

White a
luminum fixture
2
0
0 watt
50
00

k
elvin
lamp and
22” acrylic refractor.

c

Provide fixtures
as shown on drawings
for average 30 footcandle illumination.

d

Provide
three
-
way switch

located at exit doors as shown on drawings
.

e

Provide multiple dual detection occupancy sensor control.


2

Provide LED
emergency
lighting
battery backup
to provide minimum exiting lighting
level between exit doors
.

3

Provide LED lighting

with
occupancy
sensor
in
mechanical room

for
3
0 footcandle
level
.

4

Provide LED
illuminated
exit sign
s

over exit doors
.


B

Exterior Lighting


1

P
rovide wall mount induction lighting on photo sensor
and provide
lighting control
panel located next to electrical panel.


a

Enduraline
2 model
GPS36
-
80
-
120

5000
-
WH



White aluminum fixture 80 watt 5000 kelvin lamp shallow hood, semi
-
cutoff. Mount 3 feet abov
e overhead coiling doors as shown on drawings.


b

Enduraline 2 model GPS36
-
40
-
120

5000
-
WH



White aluminum fixture 40 watt 5000 kelvin lamp shallow hood, semi
-
cutoff. Mount 3 feet above double doors as shown on drawings.


13.5

POWER


A

Exterior
Power
.


1

Provide (8)
120 Volt 20 Amp weather proof duplex power receptacles.

2

Provide Taymac MX1250S horizontal metal cover in gray powder coat finish.

3

Fully recess in top 8 inch concrete block coarse and locate as shown on drawings.

4

Provide GFI breaker in electrical panel.


B

In
terior Power:


1

Provide (
12
)

120V
olt

20 Amp
duplex
power receptacles
.

2

Provide (1) 240V
olt

50 Amp power receptacle as shown on plans.

3

Provide Taymac MX1250S horizontal metal cover in gray powder coat finish.

4

Fully recess in metal panel at 6 inches above
concrete wall and locate as shown on
drawings.

5

Provide GFI breaker in electrical panel.


13.6

FIRE ALARM SYSTEM

Provide and install a complete fire alarm system

installed,
test
ed

and certifi
ed

by

a
fire alarm
company
.


System shall
be provided in accordance wit
h Air National Guard Design Policy
Section 15, Fire Protection, and applicable codes
.


A

Provide Fire Alarm Panel
and adjacent Transmitter Panel each with
battery backup

located in
Me
chanical

R
oom
.


1

Contract with Hi Desert Fire Alarm to p
rovide
Transmitter
and Exterior mounted
antenna.


163 RW

PREDATOR LRE

August 1
7
, 201
2


LRE Warehouse

Page
18

of
18

Southern California Logistics Airport


Victorville California


a

Transmitter shall be AES Intellenet Private Wireless Alarm Communicator
.


B

Provide heat and smoke detection
.

C

Provide horn strobe and
with
pull station
below a
t the two exit doors

as shown on
drawings
.

D

Provide exterior bell
loc
ated above
FDC
.

E

Provide
monitor
switch
es on each valve
including riser
OS&Y on fire riser in
Mechanical

R
oom
.

F

All conductors shall be installed
in
dedicated red
3 /4 inch minimum red EMT conduit.

G

Incorporate fire alarm
devices from

BDOC

(NIC)

into this sys
tem. Coordinate with BDOC
Contractor.


13.7

COMMUNICATIONS


A

Telecommunications


1

Provide Telco jacks
per
ANG

Standards
ETL 27
-
5 for Core 3 building a
nd
as shown
on plan.



2

Provide
two
-
gang J box
at +15 feet
for future wireless

over man doors adjacent to
rollup doors
.


3

Provide

2

inch

conduit
and C
ategory
6

cable
from J box
es

to com backboard in
Mechanical Room.


a

Terminate on Category 6
p
atch
p
anel

in wall mounted rack
.



Provide 6 foot by 6 foot plywood backboard

for rack.


b

Conduit
s

shall

contain maximum 3 sweeps.


4

Wireless and Com
cable
shall be in separate conduits
.



B

Public Address System


1

Provide
Bogen SPT5A
horn speaker
at exterior as shown on plan and interior in
similar location.


a

Run
West Penn 225 2 cord 14 AWG

speake
r wire in conduit to PA panel in
mechanical room
.

b

Provide Bogen TRU 60
-
B Amplifier at PA pane
l
.

c

Provide Bogen AT
-
10A wall mount volume control at PA panel.



14

ATTACHMENTS


14.1

DRAWINGS: 1 thru 5

S
ite and
B
uilding
P
lans


14.2

DRAWINGS: 501 thru 505

Civil Details


14.3

SPECIFICATIONS: Communications


14.4