Re: DHHA Pavilion C Delayed Egress Door and Control strategy

flounderconvoyΗλεκτρονική - Συσκευές

15 Νοε 2013 (πριν από 3 χρόνια και 8 μήνες)

81 εμφανίσεις


C:
\
Program Files
\
neevia.com
\
docConvert erPro
\
t emp
\
NVDC
\
5E198514
-
624D
-
47BB
-
AA55
-
D51F1C212D58
\
flounderconvoy_0ec4da6f
-
12f4
-
4a85
-
aa22
-
fda8416dd2a0.doc


Colorado

Nevada

Utah

Wyoming


1



July 9, 2012


Attn:
Carl Kline, DHHA


Re:
DHHA
Pavilion C Delayed Egress Door and Control strategy







Direct Digital Con
trol System Proposal


LONG is pleased to provide a proposal to
install
an electronic/electric/DDC
control system in
accordance with th
is scope of work.


1.

The sc
ope of this proposal will serve

(
2
) Two
separate yet combined functions to accomplish
and meet th
e A.H.J. code for delayed egress.


2.

The B
.
A
.
S
. (Building Automation System) shall serve as a monitoring system only, all door
un
-
lock function actions will be with hardwired relay logic.


3.

The B
.
A
.
S
.

shall monitor and provide v
i
sual remote indicat
i
on of

door initiation (
Initiating
) and
a potential delayed egress (Secondary) door routing path based on (
Initiating
) door activation.



4.

The BAS shall provide a G.U.I. (Graphical User Interface) display at local computer(s)
associated with the (
Initiating
) doo
r initiation.


5.

The security PC located on the 1
st

floor will see
all
(
Initiating
) door initiation activations
regardless of which floor this event has occurred. The PC located on the floor with (
Initiating
)
door initiation activations will also show pote
ntial delayed egress (Secondary) door routing
path based on (
Initiating
) door activation.



LONG will provide and install monitoring DDC controller(s) in the Data Room on each of 3 levels
inclusive of 2
nd
, 3
rd

and 4
th
. These DDC controllers shall be co
nnected to the existing BAS network
with routing of information thru the current I
.
T
.

services and switching routers.


LONG will provide local relay panels located within the Data Room on each of the 3 levels. This
panel will include the time delay
relay(
s) and

override relays
.


LONG will provide a relay(s) located by the applicable doors of the 3 levels to provide the necessary
DDC status input and local hardwired door un
-
lock override capabilities.


LONG will provide and install the necessary software
file(s) on each of the PC associated with this
monitoring strategy.
**This software must be running all the time”
at least
in the background
“minimized”**.

Upon activation a local alarm bell with “POP” up and require operator action to show
Initiating

do
or initiation activations and
S
econdary door routing information.


Reference documents used to produce this proposal are attached.

DH Pavillion C
notes.xlsx

Sequence of
operations.docx

Delayed Egress
Project -- I-Net security plans.pdf

5001 S. Zuni Str.

Littleton
, CO 801
20

303.975
-
2139 tel
.

303.936.2755 fax

dkiefer@long.com

Technology for
Better Buildings


C:
\
Program Files
\
neevia.com
\
docConvert erPro
\
t emp
\
NVDC
\
5E198514
-
624D
-
47BB
-
AA55
-
D51F1C212D58
\
flounderconvoy_0ec4da6f
-
12f4
-
4a85
-
aa22
-
fda8416dd2a0.doc


Colorado

Nevada

Utah

Wyoming


2


This proposal has the fo
llowing Bid Clarifications:


Terminal Unit Clarifications:



Division 16 will provide needed 120VAC power



Plenum
-
rated cable can be run in accessible ceiling areas

Fire / Smoke Damper Clarifications:



Interlock and power wiring will be by Division 16

Miscella
neous Clarifications:



Work can be done during normal business hours



The following Code requirements will be shown on the 3B drawings, but provided by (or existing
in place) by others;

a.

Approved Delayed Egress door hardware

b.

Approved door release hardware

c.

All

door preparation and certifications

d.

Manual wall
-
mounted electric unlocking devices for electronic mag
-
locks

e.

Fire alarm and suppression systems interface with existing mag
-
locks and delayed
egress doors

f.

Power loss interface with all delayed egress doors

g.

Ma
ster switch integration with all delayed egress doors

h.

Audible signal at each delayed egress door

i.

Manual relocking hardware as required at each delayed egress door

j.

Signage as needed at each delayed egress door

k.

Emergency lighting as required



The following sy
stems are in place and will be maintained in the new plan. No responsibility on
LONG’s part for current system anomalies;

a.

Remote release / intercom system

b.

Access Control proximity readers and intrusion detection



Davis Bacon wages are included



Your bui
lding technology partner,

Long Building Intelligence

Duane Kiefer
/Carl Chinn