Project 2.3.3a Automation Through Programming Lab Sheets

cavalcadehorehoundΜηχανική

5 Νοε 2013 (πριν από 3 χρόνια και 11 μήνες)

169 εμφανίσεις




Project 2.3.3a Automation Through
Programming Lab Sheets


Task

Check
-
O
ff Sheet

Problem

Task analysis

&
h
and sketch of
device
w/ electrical
connections
(student initials)

RoboPro
program
sketched or
attached
(student initials)

Conclusion

questions
(student
initials)

Problem
completion
(teacher
signature)

1.
Road Trip





2
.
Silly Suzy’s
Sandwich Sign





3
.
Eddie’s
Earthquake
Machine





4
.
Terry
’s

Traffic Tamer





5
.
This is Your
Exit





6
.
Grandma’s
Getting Old





7
.
Channel
Markers





8
.
Pick and
Place





9
.
Tekrocks
Bridge





10
.
Edison’s
Lightbulb





11
.
Elevator
Challenge





Portfolio Completion


Project Lead The Way, Inc.

Copyright 2010

GTT



Unit
2



Lesson
3



Project

2.3.3a



Automation Through Prog
ramming Lab Sheets



Page
2

Name ______________
_______
____
Job ___________________ Section _____

Partners _____________________
______
______________
__


Pr
oblem # _____

Task Analysis

Describe what must be done to satisfy the design requirements of this problem.




Mechanical Engineering:

Draw an isometric sketch or two
-
view orthographic sketch of the model. Label all
electrical de
vices.



Electrical Engineering:

Show the connections between the interface and electrical device(s) in the sketch
.


Note: If the sketch is orthographic, show the connections in the front view only.

Project Lead The Way, Inc.

Copyright 2010

GTT



Unit
2



Lesson
3



Project

2.3.3a



Automation Through Prog
ramming Lab Sheets



Page
3

Computer Programming:

In the space below
,

d
raw a prog
ram flow chart of the solution to this problem.














































Conclusion Questions:

Project Lead The Way, Inc.

Copyright 2010

GTT



Unit
2



Lesson
3



Project

2.3.3a



Automation Through Prog
ramming Lab Sheets



Page
4

1.

What sensors did you use to solve this problem?





2.

Was this an open or closed loop system
?

W
hy
?







3.

Explain two
malfunctions with the solu
tion that

your team had to troubleshoot.





4. Describe two responsibilities
that
you complet
ed during

this project.