TELECOMMUNICATIONS SYSTEM REPLACEMENT

Project #
2011
-
17


Supplemental Information Notification


Date of Issue:



September 14
th
, 2011

Original Proposal Due Date:

September 30
th
, 2011

Revised Proposal Due Date
:

October 5
th
, 2011


This Addendum #2, containing the following revisions, additions, deletions and/or clarifications is
hereby made part of the Contract Provisions (Contract Documents) for the above
-
named project.
Bidders shall
take this Addendum into consideration when preparing and submitting their
proposal.

CONTRACT DOCUMENTS


The following changes have been applied to the referenced documents
. The updated versions
can be found at
http://www.duvallwa.gov/departments/IT/PhoneRFP.html
.


1.

CHANGE
-

Due to requests the proposal due date has been extended to
5 PM on October 5
th
,
2011
.

2.

CHANGE


Due to the proposal due date c
hange the Deadline for Questions has been extended to
October 3
rd
, 2011
.

3.

CHANGE

-

Section 5.46
has been updated to reference the pricing section for Automated Call
Distribution features of the ItemPricing.xlsx workbook.

4.

ADD



Section 5.4.7 has been added t
o indicate where to add additional network enhancement
costs the vendor would recommend.


5.

ADD



Section 5.4.8 has been added to indicate where to add additional optional item costs that
the vendor believes would be of interest to the City of Duvall.

6.

CHANGE



The project number has been changed to 2011
-
17

GENERAL DISCUSSION & CLARIFICATION


The following items were general topics and items discussed or clarified during the
on
-
site
meeting and walk through:


1.

All sites are connected over single mode fiber over

100mb transceivers in a hub and spoke
configuration.

2.

Hosting is not an option whether the PD is included or not

3.

The successful vendor’s employees will have to submit to and pass a background check before
performing work at the Police Department



Page
2


October 24, 2013

4.

City Hall
and Public Works systems need to be “survivable” but not necessarily “redundant”

5.

The phone system current contract is with Integra and expires in December

6.

More information regarding the PD systems is availab
le but requires a completed Non
-
Disclosure
Agreem
ent (NDA)

7.

The bandwidth between City Hall and the PD is the same

8.

The City email currently operates with
Microsoft Exchange

2003 but may up
grade to
Microsoft
Exchange

2010 and want

the ability to integrate the systems

9.

If necessary to come to a final decisio
n; Vendors should be prepared to provide equipment demos
to the City the week of October 10
th




QUESTIONS & ANSWERS


The following questions and answers were brought up during the on
-
site meeting and walk
through:


1.

Q:

What is part of the RFP and what is
not?

A:

The PD work is listed as an optional portion of the RFP
.

2.

Q:

Is there a “feet on the Ground” requirement?

A:

No, this portion is informational only
.


3.

Q:

How many voicemail boxes are required
?

A:

The RFP scopes up to 100;
It is expected that 60 to be

ready for immediate use but to have
the ability to grow up to 100. The below table breaks down where the mailboxes are
needed.

Civil User Mailboxes

40

Civil General/Department Mailboxes

10

Police User Mailboxes

17

Police General/Department Mailboxes

3

Q:

Is the PD on the same sub net
?

A:

It is currently
a separate physical network.
VLAN
s will be implemented during network
upgrades
.

4.

Q:

Is the City “virtualized”
?

A:

Some
,
with almost all servers moving to that model. Standardizing on HyperV platform
.

5.

Q:

Fast Ethernet or gig
?

A:

Mix of both with Fast (100) being most common.

6.

Q:

Is CAT 5 present at all facilities?

A:

Yes
.

7.

Q:

Please clarify section 6.9; is the vendor paying for freight costs
?

A:

The vendor should include consideration for freight, and other
costs in the item pricing
required

for
vendor provided

equipment and hardware

as part of the RFP.
It is preferred
for the City to have the option to purchase equipment as outlined in Section 3.1.1.



Page
3


October 24, 2013

8.

Q:

Are there battery back
-
up requirements
?

A:

The City wou
ld like recommendations but at least an hour of battery time is requested.

9.

Q:

Pleas clarify of the
“music on hold” requirement
?

A:

This requirement
not meant for third party music
but City recorded announcements that we
can record and “publish” ourselves.

10.

Q:

What is the intent of section 4.2.14(b)?

A:

To ascertain if the proposed system has the ability to allow calls forwarded from an station
to route back to original answer station
if there is no answer
on the set call was forwarded
to. This would occur af
ter any subsequent workflow routing and before call is routed to a
mailbox.

11.

Q:

Is there a requirement for cordless phones at any of the office locations.

A:

No. Any set that is currently cordless can be converted to wired phone set. If Vendor wishes
to pro
pose cost for wireless sets that can be provided as part of Section 5.4.8.

12.

Q:

Do alarms need to rout directly through the Telco and be independent of the system?

A:

Currently Yes.

13.

Q:

What are the options for the WWTP lab (wireless, analog)?

A:

Upgrades to
the network connection between the public works building to the water
treatment plant building are being explored. If it is found that network service will not
suffice for phone service the options available to the proposed systems are:



Ring to analog
lines



Ring to mobile phones



Propose another alternative

14.

Q:

Are Site topography and detai
led network diagrams available.

A:

Yes, upon signing an Non
-
Disclosure Agreement (NDA). The agreement contract will be
sent to anyone registering on the bidder’s list.

15.

Q:

How do
I register on the Bidders list?

A:

Email your company name, address, phone, and fax to Jason.Ladwig@duvallwa.gov.




ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EEFECT.


Please email if you have any further questions to
Jason.ladwig@duvallwa.gov
.